County |
Supply, delivery and installation of booster pumps at Mazeras pump station in Rabai Kisurutini ward-Rabai sub-county
|
To increase availability of safe and adequate water resources |
Ksh. 12,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Supply and delivery of 5000litres plastic water Storage Tanks for Rabai Sub County
|
To increase availability of safe and adequate water resources |
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of 50m3 ferrocement water tank at Boyani Rabai Kisurutini ward
|
To increase availability of safe and adequate water resources |
Ksh. 1,992,390.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 50m3 water tank at somali village Rabai Kisurutini
|
To increase availability of safe and adequate water resources |
Ksh. 1,992,580.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 50m3 Masonry water Storage tank at kaoyeni village in Rabai Kisurutini ward
|
To increase availability of safe and adequate water resources |
Ksh. 1,973,130.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 50m3 masonry water tank at Shauri moyo village in Rabai Kisurutini
|
To increase availability of safe and adequate water resources |
Ksh. 1,971,830.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of Jimba Mtandikeni Water pipeline
|
|
Ksh. 5,434,960.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1 classroom Kaloleni youth Centre
|
To improve child care facilities for holistic child development |
Ksh. 0.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Construction of special School at Kizurini special School
|
|
Ksh. 13,021,100.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Construction of 1 classroom Kaloleni youth polytechnic
|
|
Ksh. 1,762,240.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Chitsaka Cha Bahasi Dam in Rabai Kisurutini Ward
|
|
Ksh. 6,517,100.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2No. ECD classroom at Vishakani ECD unit
|
|
Ksh. 2,950,890.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 2NO. Classroms-MWANDAZA PRE SCHOOL(ALREADY CUPTURED-77)
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 50m3 Ferro-cement water storage tank at Akili ni Mali
|
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF2NO ECD CLASSROOMS AT MTENDANI PRE SCHOOL
|
|
Ksh. 3,935,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2No. ECD classroom at Mkwajuni ECD
|
|
Ksh. 2,975,940.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 50m3 ferrocement water tank at buni kibaon
|
|
Ksh. 1,981,870.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2No. ECDE Classrooms at Mwanawiji
|
|
Ksh. 2,275,300.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 2 No. ECD Classrooms at Imani Pry
|
|
Ksh. 2,999,750.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 50m3 ferro cement water tank at kwa hamisi mtoro
|
|
Ksh. 1,973,400.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2 No. ECD Classrooms at Mikiriani Pry
|
|
Ksh. 2,986,050.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 50m3 Ferro-cement water storage tank at Boyani village
|
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2 No. ECD Classrooms at Walea Pry
|
|
Ksh. 2,994,800.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of water storage tank at 50m3 at Simakeni-Bengo
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of 2 No. ECD Classrooms at Makomboani Pry
|
|
Ksh. 2,971,100.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of water storage tank 50m3 at Mwadzagu village
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Installation of Solar and Water System at Magarini Fish Depot (Marereni)
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine-TSAKAROLOVU PRE SCHOOL
|
|
Ksh. 9,886,190.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Proposed Routine Maintenance of Misufini-Masheheni Road
|
|
Ksh. 8,200,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of water storage tank 50m3 at Minyalani-Simakeni
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of ICT lab Kaloleni youth polytechnic
|
|
Ksh. 5,199,460.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF A SOCIAL HALL AT KAKUYUNI
|
|
Ksh. 11,803,800.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2 No. ECD Classrooms at Mwamleka Pry
|
|
Ksh. 3,405,740.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Procurement of 2 transport boat
|
|
Ksh. 1,600,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2 No ECD classrooms-MWANDAZA PRE SCHOOL
|
|
Ksh. 2,290,800.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 50m3 water storage tank at Monzo village
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Procurement and distribution of cooler boxes
|
|
Ksh. 720,001.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed Construction of 1No. Ecd Classroom at Katsamini Barracks Pre-School
|
|
Ksh. 2,498,480.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
RENOVATION OF MUDHIR HOUSE
|
|
Ksh. 4,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Procurement and Distribution of deep freezers
|
|
Ksh. 1,040,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed Construction of 1No. Ecd Classroom at Misufini Pre-school
|
|
Ksh. 2,498,480.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Construction of 50m3 water storage tank at Mgandini kwa Sheti
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Installation of Solar and Water System at Magarini Fish Depot (Marereni)
|
|
Ksh. 2,496,840.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
CONSTRUCTION OF A SOCIAL HALL AT KIBARANI, PHASE 1.
|
|
Ksh. 11,377,300.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
Rehabilitation cattle dips and construction of vaccination crushes
|
|
Ksh. 2,596,040.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of a Ferro Cement water tank at Bengo
|
|
Ksh. 3,500,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Proposed Construction of 1No. Ecd Classroom at Kadzonzo Pre-school
|
|
Ksh. 2,498,480.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Drilling and equiping of Makonjeni borehole
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
cattle dips and crushes
|
|
Ksh. 3,919,410.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
CONSTRUCTION OF 2N0. ECD, ADMINISTRATION BLOCK & 4NO. CUBICLE PIT LATRINE AT MARIAKANI VOCATION TRAINING CENTER
|
|
Ksh. 8,547,590.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construct New Milk collection and cooling centres
|
|
Ksh. 14,223,200.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
RENOVATION OF 3NO. WORKSHOP BLOCK AT MARIAKANI VTC
|
|
Ksh. 9,534,560.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Marafa modern slaughter slab
|
|
Ksh. 14,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
CONSTRUCTION OF 1NO ECD CLASSROOM AT MIGUNDINI PRE-PRY SCHOOL
|
|
Ksh. 2,299,790.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of cattle dips
|
|
Ksh. 2,998,030.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
CONSTRUCTION OF 1NO ECD CLASSROOM AT BARAKA PRE-PRY SCHOOL
|
|
Ksh. 2,299,170.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Marriculture Ponds Construction
|
|
Ksh. 1,002,740.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine-MUUNGANO PRE SCHOOL
|
|
Ksh. 8,235,510.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
2no. Grade 9 operator houses in Kokotoni
|
|
Ksh. 3,600,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF 2NO. CUBICLE PIT LATRINE AT G.K PRE PRY SCHOOL.
|
|
Ksh. 1,052,460.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Vipingo Slaughter House Fencing
|
|
Ksh. 3,545,770.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
2No. Ferro-Cement Rabai
|
|
Ksh. 2,345,970.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF AN ELECTRICAL LAB AT MWABAYANYUNDO VTC
|
|
Ksh. 5,966,660.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Kokotoni water project electricity connection to the pump house
|
|
Ksh. 6,453,550.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction Of 3 Aquaculture Training Ponds €“ At ATC/Mtwapa
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of 1 No. classroom and office at Bikadzaya ECD
|
|
Ksh. 2,100,460.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Mwele Simakeni pipeline Extension water project.
|
|
Ksh. 13,404,200.00 |
2013-07-01 |
2014-06-30 |
Planned |
County |
Construction Of Aquaculture Lab At Mtwapa ATC
|
|
Ksh. 11,062,700.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine-JUHUDI PRE SCHOOL
|
|
Ksh. 5,811,590.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Rabai cultural village pipeline
|
|
Ksh. 500,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Equipping The Fisheries Laboratory.
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Boyani pipeline extension.
|
|
Ksh. 4,515,960.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed Construction of 1No. Classroom with an office and 2No. Cubicle pit latrine for Mwanamwinga Youth Polytechnic
|
|
Ksh. 3,859,850.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Refurbishment Of Zero Grazing Units ATC
|
|
Ksh. 3,904,630.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Kokotoni Grundfos pump
|
|
Ksh. 1,300,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed construction of 1No. ECD classroom
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Jipe moyo water project
|
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction Of Fish Depots at Mtwapa Fish Depot
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of water storage tank 50m3 at Muungano No. 7
|
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 1 No. classroom and office at Mudzimure ECD
|
|
Ksh. 2,325,430.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Fence construction - fisheries office
|
|
Ksh. 2,900,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Proposed construction of 1No. ECD classroom and an office-KADZITSONI PRE SCHOOL
|
|
Ksh. 2,198,510.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Completion of Chain Links Fencing at Kilifi Fisheries Office
|
|
Ksh. 1,611,530.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Proposed construction of 1No. ECD classroom and an office-KITHEGWANI PRE SCHOOL
|
|
Ksh. 1,999,870.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of 50m3 water storage tank at Mgandini kwa Bendegwa village
|
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Proposed Rehabilitation of fish depot-Kilifi Central Bmu
|
|
Ksh. 5,937,210.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Constuction of Water tank 50m3 at Kaliang'ombe
|
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2 No ECD classrooms and Office-Gabriel kahindi pre school
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Mwachidemu kiosk
|
|
Ksh. 489,459.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction works of fish depots-mayungu
|
|
Ksh. 9,485,380.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Mwakuchi water supply pipeline
|
|
Ksh. 4,966,370.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 1 No. Classroom and an Office at Migwaleni ECD
|
|
Ksh. 1,989,950.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Installation of Solar and Water System at Magarini Fish Depot (Marereni)
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1 No. Classroom and an Office at Nguluweni ECD
|
|
Ksh. 1,989,950.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Manoloni water supply pipeline
|
|
Ksh. 4,966,370.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 1 No. Classroom and an Office at Bengoni ECD
|
|
Ksh. 1,989,950.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Baramare water supply pipeline
|
|
Ksh. 6,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Construction of 1 No ECD classroom and Office
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 50m3 masonry water tank at Mwatsama XSvillage in Rabai Kisurutini ward
|
|
Ksh. 1,917,230.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Proposed construction of 1No. ECD classroom-muchekenzi pre school
|
|
Ksh. 1,598,990.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Rehabilitation of Kasidi water Pan in Ruruma ward
|
|
Ksh. 3,998,240.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of 1 No ECD classroom and Office-MWANAMWINGA PRE SCHOOL
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Equipping of Makini Mleji borehole in Ruruma ward
|
|
Ksh. 3,487,880.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of ECD School for people with disabilities (Mwanamwinga ward) Mwanamwinga Kaloleni-KINARANI PRIMARY SCHOOL
|
|
Ksh. 5,191,720.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Mikomani-Msikitini Water pipeline extension in Ruruma Ward
|
|
Ksh. 3,844,510.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2NO.Classrooms & Offices-042- Matolani pre school
|
|
Ksh. 4,495,130.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Rehabilitation of Mwapula-Makalangeni water pipeline in Ruruma Ward
|
|
Ksh. 8,924,620.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Proposed construction of 1No. ECD classroom-
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of Bechirindo Dam.
|
|
Ksh. 7,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 1. No Classroom at Ramisi ECD
|
|
Ksh. 1,522,630.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Upgrading of Mkapuni water pipeline
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 2NO. Classroms at Timboni Kavuka(done at Katsangani)
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Mleji water pipeline
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Makanzani water pan
|
|
Ksh. 6,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 2NO. Classroms at Timboni Kavuka(done at Katsangani)
|
|
Ksh. 3,799,620.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
PROPOSED CONSTRUCTION OF 1NO. ECD CLASSROOM AT NYATINI PRE-SCHOOL.
|
|
Ksh. 2,399,830.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of masonry water tank at Maungoni village.
|
|
Ksh. 1,600,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF 1NO. ECD CLASSROOM AT MATSAMBO PRE-SCHOOL.
|
|
Ksh. 2,388,420.00 |
2016-06-30 |
2016-06-30 |
Ongoing |
County |
Batani-Mwanjama water pipeline.
|
|
Ksh. 9,888,010.00 |
2014-07-01 |
2015-06-30 |
Planned |
County |
Construction of 1. No Classroom at Ramisi ECD
|
|
Ksh. 1,522,630.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Ruruma dam
|
|
Ksh. 6,340,130.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Jimba-Mtandikeni pipeline Extension water project
|
|
Ksh. 5,192,290.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Proposed Construction of 1No. ECD Classroom for Zia Ra Ache pre-school
|
|
Ksh. 2,397,820.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Propose Construction of 1No. ECD Classroom for Mbaga pre-school
|
|
Ksh. 2,158,780.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Benesi water pan
|
|
Ksh. 9,800,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Construction of 1No. ECD Classroom for Zhengoni pre-school
|
|
Ksh. 2,453,460.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Amani water pan
|
|
Ksh. 5,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Kawala water pipeline project
|
|
Ksh. 3,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1 No ECD classrooms-053-kadzuyuni pre school
|
|
Ksh. 1,516,640.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Kibaokiche-Kadzuyuni pipeline phase 1 project
|
|
Ksh. 15,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of jeuri mwandoni water pipeline project
|
|
Ksh. 5,357,230.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of chauringo water pipeline project
|
|
Ksh. 4,364,170.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of kwa mongo gede water pipeline project
|
|
Ksh. 4,290,050.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Construction of 1 No ECD classrooms-054-mbiri mbiri pre school
|
|
Ksh. 1,599,310.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 2. No Classrooms at Mwandai ECD(Tsonguni ecd)
|
|
Ksh. 3,198,980.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Chauringo water pipeline from lower Ribe to Ribe Primary school
|
|
Ksh. 4,328,330.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Construction of an Administration block at Tsangatsini YP
|
|
Ksh. 4,452,590.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Mwadondo-Mleji water project
|
|
Ksh. 1,000,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Pangani-Mbwaka water project
|
|
Ksh. 12,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Supply and install 2no. 10m3 plastic water tanks
|
|
Ksh. 900,000.00 |
2015-07-01 |
2016-06-30 |
Planned |
County |
Proposed construction of 4No. EDC classrooms, 2No. and 4No. Cubicle pit latrine-dzimanye ECD centre
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Mwandodo-Kwa Randu pipeline Extension water project
|
|
Ksh. 2,556,140.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction of ECD 2No. Classrooms at Kijongooni 2No.toilets
|
|
Ksh. 4,544,910.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Makini ziro water project
|
|
Ksh. 6,400,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Routine Maintenance of Bondora-Nguzo Ishirini-10km |
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Proposed Construction of 1No. ECD Classroom for Maluwani pre-school
|
|
Ksh. 2,169,030.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Lower and Upper Ribe Kaloleni water project
|
|
Ksh. 21,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
ROUTINE MAINTENANCE OF KWAMBAJI BUNI KIBAONI |
|
Ksh. 2,500,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Equipping of mikahani borehole in Mwawesa ward
|
|
Ksh. 3,803,910.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1 No ECD classrooms-060-mwezamoyo pre school
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1 No ECD classrooms-061-theroweni pre school
|
|
Ksh. 1,496,770.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Grading & Culverting of Monzo –peleleza-Uwanja wa Ndege Roadd 4.5 km |
|
Ksh. 6,300,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Road Grading and Culverts |
|
Ksh. 3,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1 No ECD classrooms-062-mwakandi pre school
|
|
Ksh. 1,596,200.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation of mkamba/msonyeni/kinunguna road |
|
Ksh. 20,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 1. No Classroom at Njoweni ECD
|
|
Ksh. 2,088,220.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilition of Mwanjama Sports Ground - Ruruma road |
|
Ksh. 2,300,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Rehabilitation of kailo-kwambaji-kibaoni roads |
|
Ksh. 9,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 1 No ECD classrooms-uhuru pre school
|
|
Ksh. 1,496,070.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Besaha Culvert works (Bechirondo) |
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Chitswa cha Mkamba Bridge |
|
Ksh. 14,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of bodaboda shades (3 No) |
|
Ksh. 1,600,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
ROUTINE MAINTENANCE OF C11 JUNCTION MAKOBENI VIA RIBE GIRLS TO KINUNGUNA JUNCTION |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
ROUTINE MAINTENANCE OF BOONDORA NGUZO ISHIRINI |
|
Ksh. 9,996,710.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Tailoring block, Sanitary facility-Tailoring block-Buni
|
|
Ksh. 4,934,980.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
ROUTINE MAINTENANCE OF C11 JUNCTION MAKOBENI VIA RIBE GIRLS TO KINUNGUNA JUNCTION |
|
Ksh. 0.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Mariakani Market Stalls
|
|
Ksh. 4,320,000.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
ROUTINE MAINTENANCE OF GOLOMOYO SCHOOL ROAD |
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Mariakani High Rise Market
|
|
Ksh. 41,208,100.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
PROPOSED REHABILITAION OF PALAKUMI-KIZURINI 27 KM |
|
Ksh. 18,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Mariakani Market fence
|
|
Ksh. 2,006,920.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
PROPOSED REHABILITATION OF CHANAGANDE-PALAKUMI 27 KM |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Market Shade-Tsangatsini market
|
|
Ksh. 3,197,500.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
PROPOSED OPENING AND DRAINAGE WORKS OF JARIBUNI WARD ROADS |
|
Ksh. 14,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Completion of Mariakani Highrise
|
|
Ksh. 14,304,400.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Mariakani Ablution block
|
|
Ksh. 8,978,990.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Chasimba Pit Latrines
|
|
Ksh. 987,369.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
"Market Stalls, Renovation Of Toilet-Mwarakaya Market "
|
|
Ksh. 5,003,390.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction Of Mtwapa Market Loading Bay
|
|
Ksh. 0.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Market Stalls, Water Storage, Sanitary Facilities &Receptacle-Mtwapa Market Office
|
|
Ksh. 134,499,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Msabaha ablution block
|
|
Ksh. 3,880,230.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Market Shades-Malindi handcraft
|
|
Ksh. 11,954,100.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Market shade and stalls-Msabaha market
|
|
Ksh. 3,994,510.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Calibration lab
|
|
Ksh. 4,748,290.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 2no classrooms-
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2no classrooms-066
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 1 No ECD classrooms at kayafungo- Kadzuyuni Pre School
|
|
Ksh. 1,516,640.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 1 No. Classroom at Rahama ECD
|
|
Ksh. 1,595,710.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2 classrooms, 1No. ICT lab and 1 2No. Rooms administration block at Rabai Kisurutini youth polytechnic
|
|
Ksh. 12,543,300.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 3 NO ECD Classrooms, 2 Cubicle Pit Latrine at Mwele ECD
|
|
Ksh. 6,599,190.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 1No. ECD classroom at Kaliang'ombe Pre School
|
|
Ksh. 1,591,910.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 1 No ECD classrooms at Kaliang'ombe pre- primary school(st. Andrews) at st Elizabeth
|
|
Ksh. 1,800,390.00 |
2013-07-01 |
2014-06-30 |
N/A |
County |
Construction of ECD 2No. Classrooms & 2No.toilets at Kajiwe Primary school.
|
|
Ksh. 4,564,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1No. ECD classrooms at Ushindi Mwele pre school
|
|
Ksh. 2,233,460.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Proposed construction of 4No. EDC classrooms, 2No. and 4No. Cubicle pit latrine Kenga pre-school
|
|
Ksh. 8,383,160.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF 2NO. ECD CLASSROOMS & 2NO. CUBICLE PIT LATRINE AT KOZINI PRE SCHOOL
|
|
Ksh. 4,944,020.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of ECD 2No. Classrooms & 2No.toilets at Benyoka primary school
|
|
Ksh. 3,693,940.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of ECD 2No. Classrooms at Kaoyeni primary school
|
|
Ksh. 3,237,300.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2NO. Classroms and 2NO. Toilets at Kailo Primary School
|
|
Ksh. 1,249,910.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of a village polytechnic at Mwele/Simakeni
|
|
Ksh. 3,098,820.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 1 No. Classroom at Mbuni Kibaoni ECD
|
|
Ksh. 1,803,290.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2 No. Classrooms and an Office at Ruruma YP
|
|
Ksh. 4,499,870.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Mwanjama Sports ground
|
|
Ksh. 1,902,400.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Construction of 2 No. Classrooms at Mawemabomu ECD
|
|
Ksh. 3,249,140.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2 No ECD classrooms - at Makondeni pre-school
|
|
Ksh. 1,634,290.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine at Ruruma Modern Center
|
|
Ksh. 8,299,490.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 2 No ECD classrooms at Kwakijala pre-school
|
|
Ksh. 3,799,600.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTUCTION OF 2NO & 4NO. CUBICLE PIT LATRINE AT RURUMA YOUTH PLOYTECHNIC
|
|
Ksh. 2,048,550.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2 No ECD classrooms at Dzanikeni pre-school
|
|
Ksh. 3,166,690.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF 2CLASSROOMS AT RURUMA VOCATIONAL TRAINING CENTRE
|
|
Ksh. 4,499,870.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 2No. and 4No. Cubicle pit latrine at Youth Polytechnic at Kambe Ribe
|
|
Ksh. 3,504,530.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 4No. Classrooms at Youth Polytechnic at Kambe Ribe
|
|
Ksh. 6,443,820.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of ECD 3no. Classrooms and 2no. Toilets at Malau primary school
|
|
Ksh. 6,500,050.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of ECD 2no. Classrooms and 2no. Toilets at Makobeni (Done at KINUNG'UNA)
|
|
Ksh. 4,607,410.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
CONSTRUCTION OF 2. NO. ECD CLASSROOM FOR MITSAJENI PRE-PRIMARY SCHOOL
|
|
Ksh. 3,984,290.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of ECD 3no. Classrooms and 2no. Toilets at Makobeni
|
|
Ksh. 6,037,780.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed construction of 4No. EDC classrooms, 2No. and 4No. Cubicle pit latrine at Jeuri pre School
|
|
Ksh. 8,115,990.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
ECD classrooms 2No. at Mbwaka primary school (Kambe Ribe Ward) Rabai
|
|
Ksh. 1,560,000.00 |
2014-06-30 |
2014-06-30 |
Ongoing |
County |
Proposed Construction of 1No. classroom block and 2no. Cubicle pit latrine at Mitsajeni Pre-Primary School
|
|
Ksh. 3,984,290.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Proposed Construction of 2No. classroom block at Pangani Pre-Primary School
|
|
Ksh. 3,967,550.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 4 No. ECDE Classrooms at Vifanjoni Pre-Primary
|
|
Ksh. 5,980,140.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine at Kazameni Pre School
|
|
Ksh. 10,682,500.00 |
2013-07-01 |
2014-06-30 |
N/A |
County |
Construction of 2no ecd classrooms and 2no cubicle pit latrine Chiferi pre-school
|
|
Ksh. 3,842,300.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Proposed Construction of 4No. ECD classroom at Bedida Pre -Primary
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Completion of 2No. Classrooms (phase 2)mwamtsunga youth polytecnic
|
|
Ksh. 2,376,990.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Kanyumbuni ECD 2no. Classrooms
|
|
Ksh. 3,179,540.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Kanyubuni pre- primary No. Classrooms and No. 2 door toilets (mwawesa) Mwawesa Rabai
|
|
Ksh. 4,203,180.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
CONSTRUCTION OF 2NO. CLASSROOMS & 2NO. CUBICLE PIT LATRINE AT KAKONENI PRE SCH
|
|
Ksh. 4,665,680.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Equipping of Bwagamoyo borehole in Mwawesa Ward
|
|
Ksh. 3,982,560.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Equipping of Kanyumbuni Borehole in Mwawesa Ward
|
|
Ksh. 3,991,200.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Completion of the new unit, Side stalls & Drainage system-Kwa Jiwa Phase 11
|
|
Ksh. 47,404,800.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Equipping of Chonyi borehole in Mwawesa Ward
|
|
Ksh. 3,994,560.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Equipping of Dip Borehole in Mwawesa Ward
|
|
Ksh. 3,853,720.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Roofing, Ceiling 7 Floor-Refurbishment of Malindi Coop Offices
|
|
Ksh. 4,478,340.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Equipping of Pwani borehole in Mwawesa ward
|
|
Ksh. 3,997,280.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Equiping of Chang’ombe borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Renovation of the old market and construction of a new unit-Kwa Jiwa Phase 1
|
|
Ksh. 27,023,500.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Equipping of Bwagamoyo borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Equipping of Chiferi borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Equiping of Kwa Juaje borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Equiping of Kanyumbuni borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Drilling and equiping of Mwawesa Borehole
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Construction of Golo-Mwawesa water projrct
|
|
Ksh. 7,000,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
"Grading of access road Spot patching Fitting of cabro in front of market-Watamu market "
|
|
Ksh. 6,436,260.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Ablution Block, Guard house & fence-Gede jua kali
|
|
Ksh. 4,688,750.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Routine Maintenance of Vilwakwe -Kachororoni Road. |
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2No classrooms at J.K Baya ECD
|
|
Ksh. 3,960,750.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of 2 no. toilets at Mijomboni Market -4 door-Mijomboni Toilets
|
|
Ksh. 1,005,220.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Routine Maintenance of Junction Petanguo -Dungicha Secondary Road |
|
Ksh. 9,200,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Mkapuni-Bwagamoyo pipeline
|
|
Ksh. 16,000,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction of 4 No ECD classrooms & 2 toilets at Chonyi Pre School
|
|
Ksh. 5,918,240.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
"Market stalls Shade Toilet Offices-Mkwajuni market "
|
|
Ksh. 11,198,100.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
PROPOSED REHABILITATION OF MARYANNGO-MWAKWALA-KABATHENI 10 KM |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2 no. toilets4-door toilet block-Majaoni Latrines
|
|
Ksh. 1,331,140.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
PROPOSED OPENING AND GRADING OF NYARI PRIMARY ROAD |
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Bedida Pre -Primary 2 No. Classrooms (Mwawesa Ward) Rabai
|
|
Ksh. 2,630,150.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Bwagamoyo-Ngindo pipeline extension.
|
|
Ksh. 4,600,000.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
PROPOSED OPENING AND GRADING OF VILWAKWE-KACHORORONI PRIMARY ROAD |
|
Ksh. 9,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Drainage, Cabro & Walkways-Charo wa Mae Market Walkways
|
|
Ksh. 17,931,200.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
REHABILITATION OF PALAKUMI-KIZURINI ROAD |
|
Ksh. 18,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2no ecd at NDUNDUNI
|
|
Ksh. 1,724,770.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Water project 3km Changombe pwani
|
|
Ksh. 4,000,000.00 |
2014-06-01 |
2015-06-30 |
N/A |
County |
Ablution Block Mechanical Works-Charo wa Mae Market
|
|
Ksh. 724,756.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
PROPOSED ROUTINE MAINTENNCE OF VITENGENI TO GANZE |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Roofinng, Floor, Ceiling & Extensionof offices-Renovation dpt-hq
|
|
Ksh. 12,500,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Masha Kadzinga-Mrima Mkulu water pipeline
|
|
Ksh. 6,000,000.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Construction of special School at Chang'ombe special School
|
|
Ksh. 13,021,100.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
PROPSED ROUTINE MAINTENANCE OF VITENGENI TO BAMBA |
|
Ksh. 17,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of a perimeter Wall at Kilifi Offices
|
|
Ksh. 4,241,500.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of Road Vilakwe Kachororoni Road |
|
Ksh. 4,500,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Tsakarolovu water pipeline
|
|
Ksh. 10,000,000.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Proposed construction of 4No. ECD classrooms, 2 Cubicle pit latrine & one 4. Cubicle pit latrine-Pishi Mwenga
|
|
Ksh. 7,493,110.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
"Perimeter wall Renovation of toilet Water tower-Charo wa Mae Market Phase 1 "
|
|
Ksh. 12,954,300.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Proposed Routine Maintenance of Junction Dungicha Sec.-Shangweni |
|
Ksh. 10,500,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Drilling and equiping of Maandani borehole
|
|
Ksh. 5,000,000.00 |
2013-07-01 |
2014-06-30 |
Stalled |
County |
Proposed construction of 2No. ECD classrooms- Sosoni ecd
|
|
Ksh. 3,075,500.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Opening of Bale - Dida road |
|
Ksh. 1,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Market Shade,Stalls, Toilets-Ganze Market
|
|
Ksh. 58,131,200.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
Construction of Masha Kadzinga Borehole phase II (WDF)
|
|
Ksh. 6,000,000.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Proposed Routine Maintenance of Mtsara wa Tsatsu |
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Proposed construction of Youth Polytechnic-Youth Polytechnic at Jilore
|
|
Ksh. 6,484,180.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Renovation of MarketShade, Stalls,Office-Vitengeni matanomanE
|
|
Ksh. 7,500,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Proposed Routine Maintenance of Bamba-Mnagoni Road |
|
Ksh. 6,600,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Mariakani-Kibaokiche pipeline Extension water project
|
|
Ksh. 13,993,800.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of ECD 2No. Classrooms at viriko primary school.
|
|
Ksh. 3,738,090.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Market Shade-Malanga market
|
|
Ksh. 496,528.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Routine Maintenance of Bamba-Jila |
|
Ksh. 9,200,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
PROPOSED CONSTRUCTION OF2NO ECD CLASSROOMS AND 4NO. CUBICLE PIT LATRINE AT KAKONENI SHELLA PRE SCHOOL
|
|
Ksh. 4,995,520.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
PROPOSED ROUTINE MAINTENANCE OF GOTANI TO BAMBA |
|
Ksh. 19,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Construction of Masha Kadzinga Borehole phase I (WDF)
|
|
Ksh. 1,850,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Baolala Youth Polytechnic (Jilore Ward) Jilore
|
|
Ksh. 5,000,060.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Maintenance of Bamba to Rima ra Pera |
|
Ksh. 20,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Rehabilitation of Rima ra Pera - Midoina |
|
Ksh. 15,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF 3 BLOCKS OF 2 NO CUBICLE PIT LATRINE JILORE- JILORE Vocational Training Centre
|
|
Ksh. 2,635,980.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Zia ra Tsongo water pan
|
|
Ksh. 5,999,730.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
Construction of ICT lab Jilore Youth polytechnic
|
|
Ksh. 4,995,770.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
2No. ECD Khombeni primary (jilore ward)
|
|
Ksh. 0.00 |
2015-06-30 |
2015-06-30 |
Completed |
County |
Construction of ICT lab Jilore Youth polytechnic
|
|
Ksh. 4,995,770.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1 No ECD classrooms- Mwangaza pre school
|
|
Ksh. 1,476,050.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 1 No. Classroom at Mgandini ECD
|
|
Ksh. 1,994,220.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Procurement and Distribution of Out board engines(40hp,25hp,15hp |
|
Ksh. 10,749,500.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction of 2NO. Classroms-Kisiwani Nursery school
|
|
Ksh. 2,982,600.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Rehabilitation cattle dips and construction of vaccination crushes |
|
Ksh. 3,338,550.00 |
2013-07-01 |
2014-06-30 |
N/A |
County |
Construction of 2 No. Classrooms at Baguo ECD
|
|
Ksh. 3,186,590.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Kitsaumbi-Kaloleni water pipeline project
|
|
Ksh. 15,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Grading of Jila - Dodosa road |
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine
|
|
Ksh. 1,499,330.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Proposed opening of Midoina to Tsangatsini Junction Road |
|
Ksh. 20,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2 ECD classrooms at Madunguni
|
|
Ksh. 3,177,940.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Rehabilitation of Bamba Jila Road-9km |
|
Ksh. 15,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Kaloleni Bus Park. |
|
Ksh. 13,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of 2 No. Classrooms at Goshi ECD
|
|
Ksh. 3,188,630.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Upgrading to cabro standards of kaloleni Buspark to st. lukes hospital road. (400m) |
|
Ksh. 22,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Mdachi Irrigation Scheme Canal Lining |
|
Ksh. 3,872,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Proposed grading and Drainage maluwani access road |
|
Ksh. 2,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Pipping and fittings for 4 water pans |
|
Ksh. 1,695,460.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Education college(2noclassroomsdone at Baguo and 2no cubicle pit latrine)
|
|
Ksh. 5,031,720.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of Education college(2noclassroomsdone at Baguo and 2no cubicle pit latrine)
|
|
Ksh. 5,031,720.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Boma Ra Mtsanga Road |
|
Ksh. 8,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Kizurini water pan
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of Mipesa water pan |
|
Ksh. 8,615,040.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of ICT lab kakuyuni polytechnic
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Vuga water pan
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Completion of Kaloleni Bus Park -Phase ll |
|
Ksh. 13,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
MARYANGO-MWAKWALA- KABATHENI |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2no. ECD Classrooms at kakuyuni primary school Malindi
|
|
Ksh. 2,100,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Vikindani water pan
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
REHABILITATION OF PALAKUMI-KIZURINI ROAD |
|
Ksh. 0.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of ICT lab kakuyuni polytechnic
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Complete construction of Ganze, milk schemes |
|
Ksh. 14,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
PROPOSED REHABILITATION OF MARYANNGO-MWAKWALA-KABATHENI 10 KM |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Construction of 2no. ECD Classrooms at kakuyuni primary school Malindi
|
|
Ksh. 2,100,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construct New Milk collection and cooling centres |
|
Ksh. 14,683,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
PROPOSED REHABILITATION OF CHANAGANDE-PALAKUMI 27 KM |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2no. ECD Classrooms at Mshongoleni
|
|
Ksh. 2,991,290.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
PROPOSED REHABILITAION OF PALAKUMI-KIZURINI 27 KM |
|
Ksh. 18,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Rehabilitation cattle dips and construction of vaccination crushes |
|
Ksh. 3,338,550.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed Routine Maintenance of Mwandaza Mgamboni-Chilulu |
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed construction of 4No. EDC classrooms, 2No. and 4No. Cubicle pit latrine-Mkaomoto pre-school
|
|
Ksh. 9,555,090.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed Routine Maintenance of Miembe Kumi-Timbe-Timbe |
|
Ksh. 8,300,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
Sub County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of 2 No. classrooms at Kijiwetanga ECD
|
|
Ksh. 3,999,560.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
ROUTINE MAINTENANCE OF MWARAKAYA/KALOLENI ROAD |
|
Ksh. 10,100,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 2NO. Classroomsand supply of 100NO.Lockers and Chairs-Bishop Kalu Secondary School
|
|
Ksh. 3,362,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 1no. Water tank at Miwani
|
|
Ksh. 1,000,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
New Mariakani solar lights |
|
Ksh. 3,200,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed construction of 4No. ECD classrooms, 2 Cubicle pit latrine & one 4. Cubicle pit latrine-Mashamba pre-primary school.
|
|
Ksh. 10,146,900.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of Shibe Water pan |
|
Ksh. 4,950,880.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of Muungano Dam in Kaloleni ward
|
|
Ksh. 6,839,840.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Construction of 2 No ECD classrooms-Pendukiani pre school
|
|
Ksh. 2,989,560.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 2 No. classrooms at Miwani ECD(done at Milimani)
|
|
Ksh. 4,010,350.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of Tsunguni-Chilulu water pipeline in Kaloleni ward
|
|
Ksh. 11,728,700.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of 2 No. classrooms at Milimani ECD
|
|
Ksh. 3,977,730.00 |
2016-07-01 |
2017-06-30 |
Completed |
Sub County |
Procurement and Distribution of Out board engines(40hp,25hp,15hp |
|
Ksh. 10,479,500.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1No. classroom at Milimani ECD
|
|
Ksh. 2,134,250.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Ndege wa Mjema Water pan in Kaloleni ward
|
|
Ksh. 2,981,000.00 |
2018-07-01 |
2019-06-30 |
Stalled |
Sub County |
cattle dips and crushes |
|
Ksh. 3,843,780.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
2no. Classrooms at Kwa upanga pre-school(done upto Bishop Kalu sec)
|
|
Ksh. 2,973,700.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
 Construction of 2No Classroom at Ganda YP
|
|
Ksh. 3,179,850.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Solarization of Masha Kadzinga borehole in Kaloleni ward
|
|
Ksh. 2,997,160.00 |
2018-07-01 |
2019-06-30 |
Stalled |
Sub County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Construction of 2No. classroom at Miwani Pre-school
|
|
Ksh. 4,010,350.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Procurrement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Completion of Maandani Borehole in Kaloleni ward
|
|
Ksh. 1,839,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
 Construction of 2No Classroom at Ganda YP
|
|
Ksh. 3,971,850.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Proposed construction of 4No. ECD classrooms, 2 Cubicle pit latrine & one 4. Cubicle pit latrine
|
|
Ksh. 8,027,790.00 |
2015-07-01 |
2017-06-30 |
N/A |
County |
Procurement and Distribution of fishing gear |
|
Ksh. 6,498,900.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Supply ,delivery and branding of 500l plastic water storage tanks in Kaloleni Sub County
|
|
Ksh. 499,990.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of Laboratory
|
|
Ksh. 9,509,080.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Procurement and Distribution of Out board engines(40hp,25hp,15h) |
|
Ksh. 10,749,500.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Supply,delivery and branding of 5000litre plastic water tanks for Kaloleni Sub County
|
|
Ksh. 497,500.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of 3 No. ECD Classrooms at Ganda Pry
|
|
Ksh. 5,291,610.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Procure and distribute solar lit fish marketing boxes |
|
Ksh. 2,396,800.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction of 250m3 masonry water Tank at Madzimbani Mariakani Ward
|
|
Ksh. 5,689,100.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
CONSTRUCTION OF ICT LAB & 4NO. CUBICLE PIT LATRINE AT KAOYENI POLYTECHNIC
|
|
Ksh. 6,457,330.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
PROPOSED OF 2NO CLASSROOMS & 2NO CUBICLE PIT LATRINE AT KAKUYUNI VOCATIONAL TRAINING CENTRE
|
|
Ksh. 4,739,950.00 |
2016-06-30 |
2016-06-30 |
Completed |
County |
purchase of equipment for disease surveillance |
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Rehabilitation of Mariakani Dumpsite
|
|
Ksh. 7,192,060.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
ECD classrooms 3No. And 100 no. desks At Majivuni primary School (malindi town ward) Malindi
|
|
Ksh. 4,888,710.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation of Makange Dam
|
|
Ksh. 3,888,230.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 3no. ECD classrooms at Kasimbiji primary school (Malindi town ward) Malindi
|
|
Ksh. 4,408,670.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation cattle dips and construction of vaccination crushes |
|
Ksh. 3,338,550.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Construction of 3 No. ECD Classrooms at Central Pry
|
|
Ksh. 4,445,290.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rabbit promotion Purchase and distribution of rabbits-all wards |
|
Ksh. 1,337,000.00 |
2013-07-01 |
2014-06-30 |
N/A |
County |
CONSTRUCTION OF 2NO CLASSROOMS & ADMINISTRATION BLOCK AT KAOYENI VTC MALINDI TOWN
|
|
Ksh. 7,272,870.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Gotani-Pangayambo water project
|
|
Ksh. 7,400,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of kamukomani vented drift |
|
Ksh. 12,400,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
DEVELOPMENT OF BUMBI GWASENI IRRIGATION SCHEME PROJECT. |
|
Ksh. 2,500,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Equiping of Kitsamini borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
CONSTRUCTION OF 2NO CLASSROOMS AT ST ANDREW PRE SCHOOL
|
|
Ksh. 3,941,520.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of Kibaokiche-Kajongooni/Gotani water project
|
|
Ksh. 6,000,000.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
REPAIRS AND EMBARKMENT AND SPILLWAY FOR BUMBI-GWASENI WATER PAN |
|
Ksh. 1,197,900.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Rehabilitation of Mariakani Total station to Railway Road to Cabro Standard |
|
Ksh. 10,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2No. ECD Classrooms and 4no cubicle at Malindi HGM Pry
|
|
Ksh. 4,831,630.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
Sub County |
Supply and delivery of tractor drawn planter |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Installation of 4no. Plastic tanks with plinth for Pangayambo water project
|
|
Ksh. 2,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Rehabilitation of misufini village roads |
|
Ksh. 3,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF 2NO CLASSROOMS AT ST ANDREW PRE SCHOOL
|
|
Ksh. 3,941,520.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Kirumbi Girls Secondary borehole
|
|
Ksh. 5,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
PROPOSED REHABILITATION OF KAMKOMANI RD. |
|
Ksh. 15,100,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Construction of 2No. ECD Classrooms and 4no cubicle at Malindi HGM Pry
|
|
Ksh. 4,831,630.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Stocking of farmers ponds |
|
Ksh. 1,610,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Equiping of Kabororini borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
PROPOSED OPENING OF KADZONZO - DZIHOSHE LINK RD. |
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
CONSTRUCTION OF 2NO CLASSROOMS & ADMINISTRATION BLOCK AT KAOYENI VTC MALINDI TOWN
|
|
Ksh. 7,272,870.00 |
2018-07-01 |
2019-06-30 |
Completed |
Sub County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Proposed Routine Maintenance of Kirumbi-Barracks |
|
Ksh. 7,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Kibaokiche 250cum water storage tank
|
|
Ksh. 2,400,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of ECD 3no. Classrooms at Karima Primary school
|
|
Ksh. 4,796,890.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Proposed grading and gravelling of Kadzonzo B Road |
|
Ksh. 10,084,900.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Improvement of Waa dam water supply Phase I
|
|
Ksh. 2,400,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of ECD 3no. Classrooms at Airport primary school
|
|
Ksh. 4,796,890.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Ndatani borehole
|
|
Ksh. 6,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Grading and Murraming of Mtamboni – Kibadhi-Kadzitsoni- Kajionee Road |
|
Ksh. 6,300,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine
|
|
Ksh. 9,841,460.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Drilling and equipping of Kabororini borehole in Mariakani ward
|
|
Ksh. 3,928,840.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Guruguru to Mnazi Mmwenga Road |
|
Ksh. 3,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of a workshop at Muyeye Polytechnic (Shella Ward)
|
|
Ksh. 4,010,780.00 |
2015-07-01 |
2016-06-30 |
Completed |
Sub County |
Supply and delivery of tractor drawn planters |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Tsangatsinil/ Mnago wa Dola Road- 7km |
|
Ksh. 15,300,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Tsangatsini-Mkuluni dam water project
|
|
Ksh. 7,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 3 ECD classrooms
|
|
Ksh. 6,602,750.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
PROPOSED ROUTINE MAINTENANCE OF GOTANI TO BAMBA |
|
Ksh. 19,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Construction of 3no. Ecd classrooms at Upweoni ECD
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Barracks Booster pump station fencing, Mariakani ward
|
|
Ksh. 697,125.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Construction of 1No. Ecd Classroom at Kagombani Pre-School
|
|
Ksh. 2,399,800.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
PROPOSED REHABILITATION OF GOTANI -KIBAO KICHE-GOTANI.17 KM |
|
Ksh. 200,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Water pan at Tsangatsini
|
|
Ksh. 4,990,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
Sub County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Routine Maintenance of Gogo - Reruhe Road |
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Supply and delivery of big waste bins for collection in Mariakani
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Proposed Construction of 1No. Ecd Classroom at Mirihini Pre-School
|
|
Ksh. 2,397,910.00 |
2019-07-01 |
2020-06-30 |
N/A |
County |
PROPOSED CONSTRUCTION OF DISPENSARY BLOCK,TWIN ONE BEDROOM STAFF HOUSE AND 2NO.CUBICLE PIT LATRINE AT MWELE/SIMAKENI
|
|
Ksh. 29,805,700.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Kibaokiche Kaloleni water pipeline.
|
|
Ksh. 15,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION .OF 45 BED MATERNITY & TWIN OPERATING THEATRE AT RABAI.
|
|
Ksh. 63,528,500.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Proposed Routine Maintenance of Tsangatsini Mnago wa Dola |
|
Ksh. 10,084,900.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Construction of 1No. Ecd Classroom at Kombo Boma Pre-School
|
|
Ksh. 2,399,800.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of 1no. Water tank at Kanyumbuni
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF MATERNITY AT KOMBENI
|
|
Ksh. 8,499,340.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
PROPOSED CONSTRUCTION OF 2NO CLASSROOMS & 2NO. CUBICLE PIT LATRINE AT MIYANI PRE SCHOOL.
|
|
Ksh. 4,591,290.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Waa dam water distribution system phase II
|
|
Ksh. 5,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Routine Maintenance of Majengo Kirosa Road |
|
Ksh. 7,100,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
CONSTRUCTION OF A STAFF HOUSE IN MITSAJENI DISPENSARY
|
|
Ksh. 7,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Equipping of Kakongani-Kaembeni borehole in Mwanamwinga ward
|
|
Ksh. 3,999,180.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF 2NO CLASSROOMS & 2NO. CUBICLE PIT LATRINE AT MSOLO PRE SCHOOL
|
|
Ksh. 4,700,900.00 |
2018-07-01 |
2019-06-30 |
N/A |
Sub County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Kanyumbuni water pan
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Routine Maintenance of Kibao cha Ngo'mbe to Bomani |
|
Ksh. 8,300,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
"Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine at Mapimo pre- school "
|
|
Ksh. 10,972,700.00 |
2013-07-01 |
2014-06-30 |
Stalled |
County |
CONSTRUCTION OF 1 NO. MATERNITY WING IN KAMBE DISPENSARY
|
|
Ksh. 9,930,550.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Drilling and equiping of Kabatheni borehole
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
PROPOSED ROUTINE MAINTTENANCE OF A7 JUNCTION TO NGOMENI RD. |
|
Ksh. 20,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
"Construction of 2NO. Classroms at Majenjeni primary school "
|
|
Ksh. 2,955,460.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF A STAFF HOUSE IN LUTSANGA DISPENSARY
|
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Rehabilitation of Marafa Junction to Burangi road |
|
Ksh. 22,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Kirumbi water pan
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
Sub County |
cattle dips and crushes |
|
Ksh. 3,080,920.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Kahingoni-Mwamleka water pipeline
|
|
Ksh. 4,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
rehabilitation of mamburui to angels bay road |
|
Ksh. 3,100,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF 6 BED MATERNITY AT CHIFERI
|
|
Ksh. 7,940,800.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Improvement of county tree nursery
|
|
Ksh. 0.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Rebabilitation of Marafa to Makumba road |
|
Ksh. 11,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Mnazimwenga animal dam
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Rehabilitation cattle dips and construction of vaccination crushes |
|
Ksh. 3,462,140.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Rehabilitation of Chamari Danisa Road |
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Provision of garbage collection personal protective implements
|
|
Ksh. 0.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
CONSTRUCTION OF DISPENSARY & 2 NO CUBICLE PIT LATRINE AT KANYUMBUNI
|
|
Ksh. 15,992,800.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Chembe Kalama dam
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 1,400,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
upgrading of majengo kilulu road |
|
Ksh. 10,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF DISPENSARY BLOCK AND 2NO.CUBICLE TOILETS AT KWAJUAJE
|
|
Ksh. 17,528,900.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Procurement of casings, screens and gravel pack for borehole development
|
|
Ksh. 0.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Tsangatsini perimeter fence and toilet |
|
Ksh. 2,976,570.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Fencing of Magarini Youth stadium
|
|
Ksh. 5,600,310.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
rehabilitation of gongoni sosoni road. |
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction Bikidzaya borehole
|
|
Ksh. 4,500,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
CONSTRUCTION OF HEALTH CENTRE AT MWAWESA.
|
|
Ksh. 5,078,510.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
installation of solar street lights at mambrui |
|
Ksh. 5,300,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
"Construction of 1 No ECD classroom at Kotayo pre school "
|
|
Ksh. 199,900.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Cattle dips and crushes |
|
Ksh. 3,080,920.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
"Construction of 1No ECD classroom at Kikaangajeni pre school "
|
|
Ksh. 1,999,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
PROPOSED ROUTINE MAINTENANCE OF MAREKEBUNI VIA MAKUMBA MARAFA TRADING CENTRE 22 KM ROAD |
|
Ksh. 12,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Rehabilitation cattle dips and construction of vaccination crushes |
|
Ksh. 3,462,140.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
"Proposed Costruction of 1No. ECD classroom at G.I.S nursery school. "
|
|
Ksh. 1,657,050.00 |
2013-07-01 |
2014-06-30 |
N/A |
County |
PROPOSED ROUTINE MAINTENANCE OF MIZIJINI KAVUNYALALO ROAD |
|
Ksh. 15,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Construction of biogas digesters-Kaloleni, Kilifi North
|
|
Ksh. 3,500,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
PROPOSED CONSTRUCTION OF 2NO. ECD CLASSROOMS AT CHAMARI PRE-PRIMARY SCHOOL
|
|
Ksh. 3,974,210.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF VYAMBANI DISPENSARY
|
|
Ksh. 20,295,600.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
extension works of marafa-chamari road |
|
Ksh. 11,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Equiping of Mnyenzeni borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of Livestock sales yards - Tsangatsini |
|
Ksh. 2,976,570.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Supply of briquetting machine and charcoal Kiln-Kaloleni, Kilifi North
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Constructionof 2 No. ECD Classrooms at Tangini ECD
|
|
Ksh. 3,978,110.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation of marafa-waresa road |
|
Ksh. 9,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Hademu Nguluweni-Bikidzaya water pipeline
|
|
Ksh. 9,900,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
COMPLETION OF MATERNITY ROOM AT MIRIHINI DISPENSARY
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Proposed Routine Maintenance of Povuni-Majengo-Shomela Road |
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
Flagship |
Construction of biogas digesters-Kaloleni, Kilifi North
|
|
Ksh. 3,500,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Ikanga dam
|
|
Ksh. 2,998,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
CONSTRUCTION OF 2. ECD CLASSROOMS FOR ZIWANI PRE SCHOOL
|
|
Ksh. 3,984,300.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Supply of briquetting machine and charcoal Kiln-Kaloleni, Kilifi North
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 2 No. Classroom at Waresa ECD
|
|
Ksh. 3,953,480.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
construction of kwa kashombo water pan
|
|
Ksh. 7,999,370.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of biogas digesters-Kaloleni, Kilifi North
|
|
Ksh. 3,500,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Juhudi-Kinarani sec-Kakomani water pipeline
|
|
Ksh. 6,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed Routine Maintenance of Gongoni-Mapimo Road |
|
Ksh. 8,100,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 3no. ECD classrooms at Mekatilili Primary
|
|
Ksh. 5,977,930.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
CONSTRUCTION OF DISPENSARY MILALANI.
|
|
Ksh. 0.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Supply and delivery of tractor drawn planters |
|
Ksh. 996,480.00 |
2014-07-01 |
2015-07-01 |
Completed |
County |
Supply of briquetting machine and charcoal Kiln-Kaloleni, Kilifi North
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Construction of Mariakani-Tsangatsini phase I Water pipeline project in Kayafungo ward
|
|
Ksh. 14,704,900.00 |
2018-07-01 |
2019-06-30 |
Planned |
County |
Constructionof 2 No. ECD Classrooms at Mawazo ECD
|
|
Ksh. 31,688,900.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
installation of high mast lights at gongoni |
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Tsakathune-Kilonga-Mwamleka water pipeline
|
|
Ksh. 6,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
rehabilitation of gongoni-shomela road |
|
Ksh. 3,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of biogas digesters-Kaloleni, Kilifi North
|
|
Ksh. 3,500,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
"Construction of 2NO. Classroms at Danisa primary school "
|
|
Ksh. 3,319,690.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
CONSTRUCTION OF MIGUMO MIRI DISPENSARY
|
|
Ksh. 9,210,140.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Equipping of kavuka II borehole in Kayafungo ward
|
|
Ksh. 3,997,480.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
"Construction of Dei Kibojoni Water pan " |
|
Ksh. 3,446,000.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of 2n.Ecd at Kotayo ecd
|
|
Ksh. 3,999,880.00 |
2015-07-01 |
2017-06-30 |
Completed |
County |
Upgrading of Hademu Borehole
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Supply of briquetting machine and charcoal Kiln-Kaloleni, Kilifi North
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Rehabilitation of Gongoni chiefs -shomela roads. |
|
Ksh. 50,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
COMPLETION OF MATERNITY ROOM AT MIRIHINI DISPENSARY
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Equipping of Kavuka I borehole in kayafungo ward
|
|
Ksh. 3,899,800.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
"Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine at Vithunguni pre- school. "
|
|
Ksh. 8,436,660.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Renovation of Ngala phase 2 estate in Malindi
|
|
Ksh. 14,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Rehabilitation of Kibao Cha Fundisa Adu Road |
|
Ksh. 50,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Stocking of farmers ponds |
|
Ksh. 1,610,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Equiping of Bengoni borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
CONSTRUCTION OF STAFF HOUSE AT MIGODOMANI DISPENSARY
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Proposed Construction of 1No. Ecd Classroom at Mnagoni Pre-school
|
|
Ksh. 2,478,830.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
Equipping of Mnyenzeni borehole in Kayafungo ward
|
|
Ksh. 3,951,430.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Routine Maintenance of A7-Junction-Bora Imani-Kamale Road |
|
Ksh. 8,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Development of GIS laboratory and offices
|
|
Ksh. 18,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF TWIN ONE BEDROOM STAFFHOUSE AT JILA DISPENSARY
|
|
Ksh. 3,432,600.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Perimeter fence and toilet construction for Langobaya sales yard |
|
Ksh. 2,753,990.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction of 2 No. ECD Classrooms at Tangini Kwa Kagumba ECD Centre
|
|
Ksh. 2,953,230.00 |
2016-06-01 |
2017-06-30 |
Completed |
County |
Upgrading of Kiwandani shingila
|
|
Ksh. 7,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
PROPOSED ROUTINE MAINTENANCE OF MARAFA MAKUMBA & ADU KADZANDANI ROADS |
|
Ksh. 16,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Construction of 4no. Cubicle Pit Latrine at Kambi ya Waya ECD
|
|
Ksh. 1,437,500.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
COMPLETION OF STAFF HOUSE AT SOKOKE DISPENSARY(MISUFINI)
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
PROPOSED ROUTINE MAINTENANCE OF A7 JUNCTION KIBAO CHA FUNDISATO ADU TRADINNG CENTRE 22KM |
|
Ksh. 18,500,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Supply ,delivery and installation of a Charcoal briquetting machine and a charcoal kiln
|
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF 2 NO AND 4NO CUBICLE PIT LATRINE AT MWAEBA PRE-SCHOOL
|
|
Ksh. 2,183,480.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION AND EQUIPMENT OF LABORATORY AT DZIKUNZE, MALANGA AND MADAMANI DISPENSARIES
|
|
Ksh. 3,500,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Opening of 4km housing access roads at KKB in Kilifi
|
|
Ksh. 6,844,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
Sub County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of 2 No. ECD Classrooms at Bahari ya Kati Pry
|
|
Ksh. 3,958,550.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
PROPOSED ROUTINE MAINTENANCE OF MARERENI BORA IMANI KAOYENI KAMLE RD. |
|
Ksh. 6,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
CONSTRUCTION OF DISPENSARY WITH DELIVERY UNIT AT KWA DADU.
|
|
Ksh. 22,442,900.00 |
2018-07-01 |
2019-06-30 |
Completed |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 5,590,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Equiping of Tsakathune borehole (Badhili/Kajagi valley
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Proposed construction of 2No. classrooms, 2No. and 4No. Cubicle pit latrine for Kambi Ya Waya Youth Polytechnic
|
|
Ksh. 5,364,720.00 |
2016-06-01 |
2017-06-30 |
Completed |
County |
Rehabilitation of Adu sec to Kadzandani pry Road |
|
Ksh. 15,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Supply, delivery and installation of Kibaokiche Booster pump fencing in Kayafungo ward
|
|
Ksh. 698,500.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Proposed Construction of 2No. ECD Classrooms for Sosoni pre-school
|
|
Ksh. 3,959,770.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Supply of briquetting machine and charcoal Kiln
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
PROPOSED REHABILITATION OF KAYADAGAMRA ROAD 13 KM |
|
Ksh. 15,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
CONSTRUCTION OF MATERNITY & TWIN OPERATING THEATRE AT BAMBA.
|
|
Ksh. 32,528,800.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Equipping of Mwamleka borehole in Mwanamwinga Ward
|
|
Ksh. 3,949,220.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of ECD 2No. Classrooms with 40 No.desk at Sogorosa Nusery school.
|
|
Ksh. 3,446,860.00 |
2015-07-01 |
2019-06-30 |
Completed |
County |
Routine Maintenance of Goshi-Madunguni |
|
Ksh. 8,800,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Renovation of Oloitiptip market(KUSP)
|
|
Ksh. 96,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Equipping of Bengoni borehole in Mwanamwinga ward
|
|
Ksh. 3,949,220.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF MATERNITY WITH A THEATRE AT JIBANA
|
|
Ksh. 0.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Construction of biogas digesters
|
|
Ksh. 3,500,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1No.ECD classroom at Katsemerini ECD unit
|
|
Ksh. 2,200,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Construction Of Katikirieni €“Mwafusi Water Pipeline In Chasimba Ward
|
|
Ksh. 1,482,790.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
OFFICE PARTITIONING-KILIFI NORTH.
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF DISPENSARY & 2 NO CUBICLE TOILET AT MRIMA MKULU
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction Of Sub-County Office-Kilifi South.
|
|
Ksh. 32,242,900.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF KATSEMERINI-PAZIANI RD. |
|
Ksh. 25,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Stocking of farmers ponds |
|
Ksh. 1,610,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction Amoeba pre school
|
|
Ksh. 6,419,070.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Rehabilitation Of Mazuka NgOmbeni Water Pipeline In Chasimba Ward
|
|
Ksh. 3,988,700.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF KIBAOKICHE DISPENSARY
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Renovation of Mwangea Estate (completion)
|
|
Ksh. 3,400,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of subcounty office Kaloleni
|
|
Ksh. 34,728,100.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF KALIAPAPO MADUNGUNI RD. 5KM |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Kwa Jola Mafisisni Water Project
|
|
Ksh. 3,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
"Construction of 2 No ECD classrooms at Kanyaule pre school "
|
|
Ksh. 2,998,100.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Rehabilitation of cattle dips |
|
Ksh. 2,998,030.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
GRADING AND DRAINAGE WORKS GOSHI MADUNGUNI RD. |
|
Ksh. 10,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
REFURBISHMENT OF VISHAKANI DISPENSARY
|
|
Ksh. 23,331,600.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of 2 No. ECD Classrooms at Kambi ya Waya Pry
|
|
Ksh. 3,305,760.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
GRADING, GRAVELLING AND DRAINAGE WORKS OF KIJIWETANGA JACARANDA RD |
|
Ksh. 15,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Chasimba Mbomboni Phase Ii Water Project
|
|
Ksh. 9,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION .OF 45 BED MATERNITY & TWIN OPERATING THEATRE AT MARIAKANI.
|
|
Ksh. 63,528,700.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 1 No. ECD Classrooms at Borabora ECD Centre
|
|
Ksh. 2,185,210.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
COMPLETION OF BP - EDEN ROCK |
|
Ksh. 190,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Bundacho Pipeline Extension Water Project.
|
|
Ksh. 9,972,620.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
PROPOSED UPGRADING O PAVED STANDARD OF MALINDI TOWNSHIP RDS. LOT B 4KM. BITUMEN STD. |
|
Ksh. 230,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
CONSTRUCTION OF SUB-COUNTY OFFICE-GANZE.
|
|
Ksh. 32,551,900.00 |
2013-07-01 |
2014-06-30 |
Completed |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
PROPOSED CONSRUCTION OF64 BED GENERAL WARD FOR MARIAKANI HOSPITAL
|
|
Ksh. 0.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
PROPOSED UPGRADING TO PAVED STANDARD OF MALINDI TOWNSHIP RDS. TO CABRO STANDARDS |
|
Ksh. 190,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
CONSTRUCTION OF SUB-COUNTY OFFICE-MAGARINI.
|
|
Ksh. 32,616,100.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
"Construction of 2 No ECD classrooms at Kibaoni pre school "
|
|
Ksh. 2,997,160.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Fish ponds (Ganda Ward) |
|
Ksh. 1,796,100.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF SUB-COUNTY OFFICE-KILIFI NORTH.
|
|
Ksh. 30,320,600.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of drainage works-malindi roundabout |
|
Ksh. 400,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Porposed Construction of 1NO. Classroom & Administration block at Milalani Youth Polytechnic
|
|
Ksh. 4,202,490.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Purchase Of 2no. Water Tanks(5,000ltrs) And Pipes; Chasimba And Bungu
|
|
Ksh. 900,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF 6 BED MATERNITY AT KINARANI
|
|
Ksh. 11,363,600.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Water Connection From Mwamkura To Ngamani Primary School
|
|
Ksh. 900,000.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Rehabilitation of C103 / Mtangani road |
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF SUB-COUNTY OFFICE-RABAI |
|
Ksh. 33,422,700.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Reviving Of Water Wells; Chikonde, Godi, Madzimeruhe ,Ganda And Chimbule Water Wells
|
|
Ksh. 3,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Porposed Construction of 1NO. Classroom & Toilets at Milalani Youth Polytechnic
|
|
Ksh. 4,795,780.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Stocking of farmers ponds |
|
Ksh. 1,610,000.00 |
2015-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of mlangilangi-catholic road |
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Silala Pump House Fensing And Installation Of 10m3 Plastic Water Tank At Kizingo ,Mwarakaya Ward.
|
|
Ksh. 999,500.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
CONSTRUCTION OF KITENGWANI DISPENSARY
|
|
Ksh. 16,713,600.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction Of Mwarakaya-Mzambarauni Water Pipeline
|
|
Ksh. 1,499,750.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
GRADING AND MURAMING OF VARIOUS RDS IN SHELLA AT KWA FAMAU |
|
Ksh. 13,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Proposed 4no. Ecd Classrooms, 2blocks Of 2no. Cubicle Pit Latrine & 4no. Cubicle Pit At Kaole Primary School Latrine
|
|
Ksh. 9,694,260.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction Of 50m3 Ferrocement Water Tank At Mitulani In Mwarakaya Ward
|
|
Ksh. 998,184.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Equipping Of Mitulani Borehole In Mwarakaya Ward
|
|
Ksh. 3,797,640.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction Of 2no. Ecd Classrooms And 2 Door Toilet At Tsalu Ecd School
|
|
Ksh. 4,586,870.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Routine Maintenance Of Baya-Mose Road |
|
Ksh. 9,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction Of 1no. Water Storage Tank At Bokini In Mwarakaya Ward
|
|
Ksh. 1,499,640.00 |
2018-07-01 |
2019-06-30 |
Completed |
Sub County |
Procurrement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Routine Maintenance Of Mwarakaya/Kaloleni Road |
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction Of A Water Tank And Repair Of A Pump House At Vwevwesi In Mwarakaya Ward
|
|
Ksh. 598,730.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of Lutsangani-Bebungu Water Pipeline In Mwaraka Ward.
|
|
Ksh. 1,465,760.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of water pan (Mayumbuni) |
|
Ksh. 7,980,000.00 |
2015-07-01 |
2019-06-30 |
Completed |
County |
Equipping Of Mugumoni Borehole In Mwarakaya Ward
|
|
Ksh. 3,944,560.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Equipping Of Mitulani Borehole
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Equipping Of Mafisini Borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Equipping Of Mugumoni Borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Equipping Of Kizingo Borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Chije Water Pipeline Project
|
|
Ksh. 1,300,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Mubuyuni Pipeline Water Project
|
|
Ksh. 1,200,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Mwarakaya Kizingo Water Pipeline Project
|
|
Ksh. 21,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Chengoni-Vitsangalewini Water Project
|
|
Ksh. 9,800,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Laying Water Pipes At Vwevwesi Kizingo Pipeline And 5no. Water Tanks.
|
|
Ksh. 10,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Water Tanks And Pipes At Bokini And Kasidi
|
|
Ksh. 1,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Mkwajuni Pipeline Water Project
|
|
Ksh. 1,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of 50m3 Ferro-cement Water Tank At Mandiri( Giri) In Mwarakaya Ward
|
|
Ksh. 995,614.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
ELECTRICAL INSTALLATION OF HELLS KITCHEN IN MARAFA
|
|
Ksh. 425,697.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
UPGRADING OF BOMANI STADIUM
|
|
Ksh. 8,000,000.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
CONSTRUCTION OF A SOCIAL HALL AT BOMANI, PHASE 1
|
|
Ksh. 11,953,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction Of 2no. Pit Latrine For Chasimba Youth Group
|
|
Ksh. 500,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Chonyi Cultural Centre Chain Link Fencing
|
|
Ksh. 3,897,200.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction Of Mwarakaya social hall
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
Construction Of Chonyi Amphitheatre
|
|
Ksh. 23,054,500.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of A Dias And 2.No Pit Latrines At Vipingo Community Sports Ground
|
|
Ksh. 26,457,900.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Levelling And Grading Of Majengo Community Grounds
|
|
Ksh. 6,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
CONSTRUCTION OF RABAI KISURUTINI SOCIAL HALL
|
|
Ksh. 9,816,200.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
CONSTRUCTION OF MULTI PURPOSE SOCIAL HALL AT RIBE
|
|
Ksh. 9,828,540.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
LEVELLING AND GRADING OF MSABAHA PLAY GROUNDS
|
|
Ksh. 6,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF SOCIAL HALL AT MALINDI TOWN
|
|
Ksh. 9,140,660.00 |
2015-07-01 |
2016-06-30 |
Terminated |
County |
Construction of Marafa Social
|
|
Ksh. 9,616,090.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
Construction Of Muembe Tsungu-Mirima Minne Water Pipeline In Junju Ward
|
|
Ksh. 5,983,300.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction Of Mgandini- Vipingo Water Pipeline In Junju Ward
|
|
Ksh. 1,990,250.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Drilling And Equipping Of Chodari Borehole In Junju Ward
|
|
Ksh. 461,334.00 |
2018-06-30 |
2019-06-30 |
Planned |
County |
Construction Of Kolewa Junju Water Pipeline
|
|
Ksh. 4,966,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Drilling Of 3no. Boreholes
|
|
Ksh. 1,500,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
3no. Purchase Of 10,000ltr Water Tanks.
|
|
Ksh. 960,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Mapawa-Kolewa Water Project
|
|
Ksh. 9,265,500.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Mapawa-Kolewa Phase Ii Water Supply Project
|
|
Ksh. 9,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Mtepeni-Majengo Phase Ii Water Supply Project
|
|
Ksh. 16,000,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Purchase Of Land For Solid Waste Dump Site For Mtwapa Zone
|
|
Ksh. 14,000,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Panga Moshi Water Project
|
|
Ksh. 15,000,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Mtepeni Pipeline Extension
|
|
Ksh. 2,984,800.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Mtwapa Scheme-Mtomodoni Water Supply Pipeline
|
|
Ksh. 20,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Waste Bins For Solid Waste Management
|
|
Ksh. 0.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction Of Kwa Mwavitsa Barani And Bengoma Village Water Project
|
|
Ksh. 4,982,600.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction Of Kwa Mwavitsa-Barani And Bengoma Village Water Project With Water Kiosks
|
|
Ksh. 5,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Fencing Of Mtwapa Solid Waste Management Facility Site
|
|
Ksh. 3,500,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
PROPOSED CONSTRUCTION OF A SOCIAL HALL AT KAKUYUNI
|
|
Ksh. 11,803,800.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
CONSTRUCTION OF A SOCIAL HALL AT MPIRANI
|
|
Ksh. 9,616,280.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
CONSTRUCTION OF 4 CUBICAL TOILET AT SABAKI BRIDGE
|
|
Ksh. 2,489,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
CONSTRUCTION OF DABASO SOCIAL HALL
|
|
Ksh. 9,597,120.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Construction of Gede Social Hall
|
|
Ksh. 11,753,600.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
ELECTRICAL INSTALLATION OF MNARANI YOUTH EMPOWEREMENT CENTRE
|
|
Ksh. 372,602.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
CONSTRUCTION OF SOCIAL HALLAT ROKA MAENDELEO YA WANAWAKE
|
|
Ksh. 9,016,150.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Shimola Tewa Pipe Water Project
|
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation Of B8 To Shariani Sec School |
|
Ksh. 2,000,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
CONSTRUCTION OF EZAMOYO SOCIAL HALL
|
|
Ksh. 11,995,700.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Mtwapa Scheme-Mtomodoni Water Supply Pipeline
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Stocking of farmers ponds |
|
Ksh. 1,610,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Rehabilation Of Bodoi Road |
|
Ksh. 3,500,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction of Kazuri water pan in Jilore ward
|
|
Ksh. 3,981,240.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of vaccination crushes |
|
Ksh. 3,692,700.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
ARCHITECTURAL DESIGN AND CONSTRUCTION OF KILIFI STADIUM
|
|
Ksh. 50,000,000.00 |
2018-07-31 |
2019-06-30 |
Stalled |
County |
Proposed Routine Maintenance Of Sun N Sand Sultan Palace Road 1.7 Km |
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of Kiparamoto water pipeline in Jilore ward
|
|
Ksh. 2,989,780.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Routine Maintenance Of Kizingitini Road 3 Km |
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
3 NO. plastic water storage tanks for emergency
|
|
Ksh. 1,348,860.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Girimacha dam
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Proposed Routine Maintenance Of Kwakajole-Bendago-Bekambutu |
|
Ksh. 25,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Pendukiani water pipeline
|
|
Ksh. 9,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed Routine Maintenance Of A7 Junction Kwa Kadzengo North Coast- Medical Training School |
|
Ksh. 4,100,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
CONSTRUCTION OF MATERNITY THEATRE AT MARAFA
|
|
Ksh. 28,277,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
CONSTRUCTION OF 4 CUBICAL TOILET AT KILIFI LIBRARY
|
|
Ksh. 2,491,260.00 |
2016-07-31 |
2017-06-30 |
Completed |
County |
Proposed construction of 4No. ECD classrooms at kibokoni ecde
|
|
Ksh. 9,592,970.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Sosobora-Katsuhanzala water project.
|
|
Ksh. 3,800,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Completion Of Mtwapa Bus Park |
|
Ksh. 95,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Rehabilitation of Khombeni pipeline
|
|
Ksh. 2,800,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
CONSTRUCTION OF SOCIAL HALL AT KIBAONI
|
|
Ksh. 4,506,220.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Installation Of Solar Street Lights At Mtwapa Town |
|
Ksh. 16,200,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2No Ecd Classrooms at Thulu Pre-school
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,999,360.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Pishimwenga-Baolala pipeline
|
|
Ksh. 9,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Installation Of Solar Street Lights At Mtwapa Town |
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Mirorini-Mambosasa
|
|
Ksh. 2,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation Of Burnoff To Mtwapa Health Centre And Kanamai |
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
1no. Plastic water storage tanks of 10m3 for emergency
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF DISPENSARY TWIN ONE BEDROOM STAFF HOUSE & 2 CUBICLE PIT LATRINE AT GARITHE DISPENSARY
|
|
Ksh. 26,598,500.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF PUBLIC TOILET AT KIBAONI
|
|
Ksh. 4,461,090.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 2No. & 4No. Door cubicle pit latrine at Shakhahola VTC
|
|
Ksh. 2,299,140.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
rehabilitation of coral rocks /watamu to jacaranda. |
|
Ksh. 10,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF DISPENSARY BLOCK ,TWIN ONE BEDROOM STAFF HOUSE AT MUYUWAKAYE,
|
|
Ksh. 29,971,600.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Mzizima water project
|
|
Ksh. 200,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF 2. ECD CLASSROOMS AT KANYUMBUNI PRE SCHOOL
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Jilore B water project
|
|
Ksh. 2,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
opening of access road to watamu market |
|
Ksh. 7,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF 2.NO. ECD CLASSROOMS AT MASA PRE SCHOOL
|
|
Ksh. 4,161,020.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
upgrading of watamu road to cabro standards 0.5 KM |
|
Ksh. 14,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Drilling and equipping of Goshi and Baguo Boreholes in Kakuyuni ward
|
|
Ksh. 9,212,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF 2. NO ECD CLASSROOMS AT DZITSUHE PRE SCHOOL
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF DISPENSARY, STAFF QUARTERS WITH 2 NO DOOR PIT LATRINE AT SHAKAHOLA
|
|
Ksh. 23,987,300.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Kazungu-Kithoweo water pipeline project
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction storm water drain kilifi &watamu |
|
Ksh. 18,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Mavutano water project
|
|
Ksh. 1,047,530.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Supply and delivery of tractor drawn planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF 2. ECD CLASSROOMS AT KANYUMBUNI PRE SCHOOL
|
|
Ksh. 4,103,600.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF DISPENSARY BLOCK.TWIN ONE BEDROOM STAFF HOUSE AND 2NO,CUBICLE PIT LATRINE AT CHAKAMA
|
|
Ksh. 24,029,400.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
rehabilitation of kizingo to jacaranda road road- 5KM |
|
Ksh. 10,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF 2NO CLASSROOMS AT KALONGONI PRE-PRY SCHOOL
|
|
Ksh. 4,161,020.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Goshi 1km-Rehabiliation
|
|
Ksh. 2,000,000.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
CONSTRUCTION OF DISPENSARY, TWIN ONE BEDROOM STAFF HOUSE & TWO PIT LATRINE AT KAMALE DISPENSARY
|
|
Ksh. 26,203,900.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Opening access road to watamu market-1km |
|
Ksh. 6,600,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF 2. ECD CLASSROOMS AT BANDACHO PRE SCHOOL
|
|
Ksh. 3,962,080.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Kaliapapo water project phase II
|
|
Ksh. 5,000,000.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Installation of high mast-mnarani |
|
Ksh. 9,400,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF 2. NO ECD CLASSROOMS AT DZITSUHE PRE SCHOOL
|
|
Ksh. 4,089,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF DISPENSARY, TWIN ONE BEDROOM & TWO PIT LATRINE AT MARIKANO
|
|
Ksh. 24,923,900.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
rehabilitation of mnarani roads.3km |
|
Ksh. 3,600,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Kijiwetanga-Jongooni water pipeline in Ganda Ward
|
|
Ksh. 3,992,800.00 |
2018-07-01 |
2019-06-23 |
Ongoing |
County |
CONSTRUCTION OF 2. ECD CLASSROOMS AT MKONO WA JONGOO PRE SCHOOL
|
|
Ksh. 3,888,230.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of Chumani roka to matsangani road-10km |
|
Ksh. 9,400,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Drilling of 5No.Boreholes with Hand Pumps in Ganda Ward
|
|
Ksh. 5,991,550.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2 No. ECD Classrooms at Vuga Pry
|
|
Ksh. 2,188,960.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
CONSTRUCTION OF DISPENSARY BLOCK & 2 NO CUBICLE PIT LATRINE AT KAVUNYALALO
|
|
Ksh. 19,980,400.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Opening ,grading and graveling of ROJOROJO/KONJORA 7.3km |
|
Ksh. 5,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 1Km pipeline from Fundi Hamisi to Kadzitsoni
|
|
Ksh. 2,250,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
CONSTRUCTION OF 2NO. CUBICLE PIT LATRINE FOR ADU YOUTH POLYTECHNIC
|
|
Ksh. 1,432,020.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
RENOVATION AND FENCING OF MSHONGOLENI DISPENSARY
|
|
Ksh. 2,870,190.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of water pipeline extension to chembe mashamba sokomoko project
|
|
Ksh. 5,415,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Proposed Routine Maintenance of Kituoni Ngala Primary School Road |
|
Ksh. 10,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction os 1 No. ECD Classrooms at Nyamalasinene Pry
|
|
Ksh. 2,483,410.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF MKAOMOTO MODERN DISPENSARY
|
|
Ksh. 23,248,200.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
rehabilitation of kiwandani roads.-3km |
|
Ksh. 3,500,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
COMPLETION OF GANDA DISPENSARY
|
|
Ksh. 13,516,800.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Extension of water pipeline from Mkunguni to Chembe-Mashamba-Sokomoko
|
|
Ksh. 5,415,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
CONSTRUCTION OF DISPENSARY AT MTANGANI (SABAKI WARD)
|
|
Ksh. 17,510,700.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Installation of high mast-mnarani |
|
Ksh. 5,100,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF DISPENSARY TWIN ONE BEDROOM STAFF HOUSE & 2 CUBICLE PIT LATRINE AT KAUYENI
|
|
Ksh. 25,468,100.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 2No ECD classrooms at Kulalu primary School
|
|
Ksh. 3,990,290.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
RENOVATION OF PUBLIC HEALTH OFFICE IN MALINDI.
|
|
Ksh. 2,825,670.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
CONSTRUCTION OF 2NO CLASSROOMS AT MATOLANI PRE-PRY SCHOOL
|
|
Ksh. 3,990,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of the degraded lake ChemChem
|
|
Ksh. 3,500,000.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of "Timboni pre-school "
|
|
Ksh. 9,813,810.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Rehabilitation of KPLC street lights for 5 no. existing metre boxes |
|
Ksh. 700,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
COMPLETION OF BLOOD BANK AT MALINDI
|
|
Ksh. 30,270,300.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Instalation of 15 no. streets lights for Mnarani township in Mnarani ward |
|
Ksh. 4,200,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Instalation of new solar streets lights to access road to state house. |
|
Ksh. 4,200,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Classrooms 3No. Ecd classrooms and 2no cubicle pit latrine Muyuwakae
|
|
Ksh. 5,985,640.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction Of Ziani Dispensary Maternity Wing & Purchase Of 10,000 Ltrs Water Tank(Phase 1)
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Installation of high mast lights. |
|
Ksh. 5,100,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 2NO. Classroomsand 4NO. Door toilet at Mtoroni primary school
|
|
Ksh. 4,173,330.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of Ziani Dispensary Maternity Wing & Purchase Of 10,000 Ltrs Water Tank(Phase 1)
|
|
Ksh. 22,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Msumarini Polytechnic and 4No. classrooms 4No. door toilets.
|
|
Ksh. 7,999,700.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation of street lights in tuskys-mnarani |
|
Ksh. 3,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of Kizingo Health Centre And Equipping(Laboratory)
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction os 1 No. ECD Classrooms at Kadzuyuni Pry
|
|
Ksh. 1,841,110.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
installation of solar street lights in kilifi town. |
|
Ksh. 9,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction. Of Maternity At Pingilikani Dispensary
|
|
Ksh. 8,726,820.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction os 1 No. ECD Classrooms at Adimaye Pry
|
|
Ksh. 2,577,450.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Mwangani ecd
|
|
Ksh. 3,022,900.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction Of A Dispensary At Barani Primary (Kanamai Sub-Location)
|
|
Ksh. 25,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Ganda18No.Boreholes:Musoloni(2),Gahaleni(2),
Mashamba(1),Msabaha(2),Pendukiani(2),Mkaomoto(2),
Mshongoleni(1),Ganda(2),Miwani(1),Mere(1),Kwa Upanga(1)
|
|
Ksh. 10,480,300.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of ECD 2No. Classrooms and 4No. Door toilet at Mtoroni Primary School.
|
|
Ksh. 5,063,800.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Upgrading to bitumen of kilifi rds-5.8km |
|
Ksh. 252,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Completion Of Staff House Quarters At Mtepeni Dispensary
|
|
Ksh. 5,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
Sub County |
Procurement of 10 farm Tractors |
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of fire stns. |
|
Ksh. 170,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 3 No. Classrooms and Cubical Pitlatrine at Mbaraka Jembe ECD
|
|
Ksh. 5,998,040.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Maziwani-kwa Fundi Hamisi
|
|
Ksh. 5,000,000.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
"Construction of 2no. Ecd & door toilets at Marereni pre-school "
|
|
Ksh. 1,800,070.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Opening of kiwandani roads-2km |
|
Ksh. 2,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Proposed Refurbishment And Completion Of Mtwapa Dispensary.
|
|
Ksh. 9,437,710.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Supply and delivery of tractor drawn planters |
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction os 2 No. ECD Classrooms at Kadzandani Pry
|
|
Ksh. 3,647,970.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Opening &upgrading to gravel of mabirikani estate rds 8km. |
|
Ksh. 14,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Mtwapa Dispensary Staff house
|
|
Ksh. 9,287,880.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Mashamba kwa Aboud pipeline 6
|
|
Ksh. 100,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of 2 No. ECD Classrooms at Chambuu Pry
|
|
Ksh. 3,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation of st. Thomas road to gravel.-1.2km |
|
Ksh. 4,600,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Kijiwetanga water project
|
|
Ksh. 8,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
"Construction of 2No. ECD classrooms at Balaga ecd "
|
|
Ksh. 3,855,270.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
CONSTRUCTION OF SOYOSOYO DISPENSARY
|
|
Ksh. 22,073,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
rehabilitation of kiwandani roads.-3km |
|
Ksh. 3,500,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
"Construction of 2No. ECD classrooms at Changoto ecd "
|
|
Ksh. 3,120,050.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of 2No. ECD classrooms at Dodosa ECD
|
|
Ksh. 2,518,290.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of 2No. ECD classrooms at Chumba cha Tsuwi ECD
|
|
Ksh. 2,236,540.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 2No. ECD classrooms at Mugumoni feeder ECD
|
|
Ksh. 3,207,250.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Proposed Rehabilitation of 2No. Classrooms, Store and Office for Makumba pre-school
|
|
Ksh. 4,900,820.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of ECD 2No. Classrooms with desk at Kata primary school.and 2No.pit latrine
|
|
Ksh. 2,477,300.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 2No. Toilets at Kaguguta ECD
|
|
Ksh. 998,516.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of 2No. ECD classrooms at Dhololo ECD
|
|
Ksh. 3,206,300.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of workshop at Dagamra youth polytechnic
|
|
Ksh. 4,264,070.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction of 2No. Toilets at Bore- Kakuhani ECD
|
|
Ksh. 992,345.00 |
2016-06-01 |
2017-06-30 |
Ongoing |
County |
Construction of 3No. Classrooms at Bate ECD
|
|
Ksh. 4,885,460.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of ECD 2No. Classrooms with desk at Baricho primary school.
|
|
Ksh. 342,287.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Beautification of Malindi Town and improvement of Roundabouts phase I
|
|
Ksh. 1,998,500.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Drilling of a Hand driven pump borehole at Sun Park Village in Malindi Town Ward
|
|
Ksh. 1,839,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Drilling of 8No. Boreholes with hand pumps in Malindi Town Ward
|
|
Ksh. 7,202,710.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of quarry roads - kilifi-3km |
|
Ksh. 4,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Kazuri water pipeline project in Jilore ward Malindi sub-county
|
|
Ksh. 5,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
CONSTRUCTION OF MODERN MATERNITY WING,PAEDIATRIC WARD, LABORATORY, STAFF HOUSES AND FUNISHING THE WHOLE FACILITY OF COWDRY DISPENSARY AT CHEMBE KIBABAMCHE
|
|
Ksh. 22,412,200.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Malindi Central borehole
|
|
Ksh. 1,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 2No. Toilets at Zhongwani ECD
|
|
Ksh. 995,245.00 |
2016-06-30 |
2016-06-30 |
Ongoing |
County |
Upgrading of pwani university bus stage to bitumen standards |
|
Ksh. 25,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Malindi Town ward 4no. Boreholes
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
COMPLETION OF MDZONGOLONI DISPENSERY
|
|
Ksh. 10,680,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Maboromokoni water kioski connection in Sabaki ward
|
|
Ksh. 1,499,200.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Pothole patching of Bofa to Hospital and CBD roads.1.4km |
|
Ksh. 81,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
COMPLETION OF DONGO KUNDU DISPENSARY AND CONSTRUCTION OF 2 NO. TOILETS
|
|
Ksh. 1,700,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Drainage, manhole covers |
|
Ksh. 2,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 2no ECD Classroom at Sosoni pre-school
|
|
Ksh. 3,959,770.00 |
2016-06-01 |
2017-06-30 |
Completed |
County |
Takaye-Marafiki water pipeline
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
POWER INSTALLATION AT: ZOWERANI DISPENSARY,MTONDIA DISPENSARY AND NGERENYA DISPENSARY
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF NEW BORN UNIT AT KCH
|
|
Ksh. 51,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF KILIFI HOSPITAL COMPLEX PHASE II
|
|
Ksh. 344,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Opening access and clearing of Kilifi Dumpsite.2km |
|
Ksh. 3,000,000.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
"Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine Mikuyuni Pre-School "
|
|
Ksh. 7,730,540.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF KILIFI HOSPITAL COMPLEX PHASE I
|
|
Ksh. 402,788,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Keresha water project
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
rehabilation of diamond kiteko-kaya road.1.5km |
|
Ksh. 5,500,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of ECD 2No. Classrooms at Lukole nursery school
|
|
Ksh. 348,012.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Marafiki water project
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
RENOVATION OF PHYSIOTHERAPY BUILDING AT KILIFI COUNTY HOSPITAL
|
|
Ksh. 11,824,300.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
"Construction of 2 No ECD classrooms at Kundeni pre school "
|
|
Ksh. 2,990,250.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Bumps Installation |
|
Ksh. 4,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Kayadagamra pre-primary school
|
|
Ksh. 3,099,290.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
CONSTRUCTION OF KILIFI COUNTY MEDICAL WAREHOUSE
|
|
Ksh. 16,445,400.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Kata pre-primary school
|
|
Ksh. 3,041,420.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Supply and delivery of 5000litres plastic water Storage Tanks for Magarini Sub County
|
|
Ksh. 499,275.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
"Construction of 2 No ECD classrooms at Karimboni pre school "
|
|
Ksh. 2,992,170.00 |
2013-07-01 |
2014-06-30 |
Stalled |
County |
CONSTRUCTION OF MORTUARY IN KILIFI
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Refurbishment of ex-education store (new lands headquarters building) |
|
Ksh. 14,297,400.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
"Construction of 2 No ECD classrooms at Kaguguta pre school "
|
|
Ksh. 2,991,650.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Upgrading of Makao informal settlement |
|
Ksh. 7,313,420.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
"Construction of 2 No ECD classrooms at Garashi pre school "
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
"Construction of 2No. ECD classrooms at Gadini pre-primary school "
|
|
Ksh. 2,997,150.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Upgrading of ukombozi informal settlement |
|
Ksh. 7,313,420.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Supply ,delivery and branding of 500l plastic water storage tanks in Magarini Sub County
|
|
Ksh. 1,458,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2no ecd classroom at Bodoi
|
|
Ksh. 3,905,730.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2no ECD at Masindeni
|
|
Ksh. 3,989,250.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction Of Sub-County Office-Kilifi South.
|
|
Ksh. 32,242,900.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction Of 2no Ecd Classrooms At Mwangaza Pre School
|
|
Ksh. 372,490.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of Ecd 2no. Classrooms At Ng'ombeni Primary School
|
|
Ksh. 32,080,400.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Perimeter fence and toilet construction for Kanagoni livestock sales yard |
|
Ksh. 2,225,370.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
Supply and delivery of Mawasco Standby water pump and Kambicha Generator Repair in Adu Ward
|
|
Ksh. 1,170,000.00 |
2018-07-01 |
2019-06-30 |
Planned |
County |
Construction of 250m3 blue scope Water Storage tank including water supply pipeline to Bora Imani Dispensary
|
|
Ksh. 19,948,600.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Magarini Tanks-Kaembeni water pipeline in Magariniward
|
|
Ksh. 1,632,250.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Kagombani-Milano Majengo water pipeline in Magarini ward
|
|
Ksh. 2,999,400.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Mambrui junction-Milimani water pipeline project in Magarini ward
|
|
Ksh. 1,999,050.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Baricho-Magarini Rising Main water pipeline in Magarini ward
|
|
Ksh. 24,749,200.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Marekebuni- bomani water pipeline in magarini ward
|
|
Ksh. 2,999,400.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of magarini tanks to kaembeni water pipeline in magarini ward
|
|
Ksh. 3,998,800.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Kambicha borehole site enhancement project in Adu ward Magarini sub-county
|
|
Ksh. 6,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
construction of danisa-ziwani pipelie project in magarini
|
|
Ksh. 6,965,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
construction of magarini to sosoni water pipeline
|
|
Ksh. 3,997,250.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Rehabilitation of kisima cha kufa to shomela junction water pipeline
|
|
Ksh. 4,945,550.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Magarini trading centre to Sosoni water pipeline
|
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
"MagariMabomu to Madzayani water pipeline(3.5km) "
|
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of Bridge to Masheheni water pipeline
|
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Stalled |
County |
Mambrui water supply pipeline
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Rehabilitation cattle dips and construction of vaccination crushes |
|
Ksh. 2,596,040.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
Waste bins for solid waste management
|
|
Ksh. 6,900,000.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Proposed Construction Of 2no. Classrooms And 2no. Door Cubicle Pit Latrine At Mtundani Pre School
|
|
Ksh. 5,305,940.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of Livestock sales yards - Kanagoni |
|
Ksh. 3,631,410.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
Repair of Borehole pump to replace of motor for GIMMADA water project
|
|
Ksh. 304,430.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Construction Of 2 No Ecd Classroom And 2 Door Toilets At Tsalu Ecd Centre
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Magarini-Bungale 2No. Pump operators houses(grade 9)
|
|
Ksh. 2,846,630.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Construction Of 2no. Ecd Classrooms And 2no. Door Cubicle Pit Latrine Kariboni Pre School
|
|
Ksh. 4,988,200.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Proposed 4no. Ecd Classrooms, 2blocks Of 2no. Cubicle Pit Latrine & 4no. Cubicle Pit Latrine At Bemba Pre School
|
|
Ksh. 10,498,600.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
GIS-Magarini Hill pipeline Extension water project.
|
|
Ksh. 10,467,600.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
5No. Water pans(Magego,Mpirani,Mapimo,Bkebuku and Marekebuni)
|
|
Ksh. 10,830,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Magarini Hill 250CUM masonry water storage tank.
|
|
Ksh. 6,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Equipping of watala borehole in marafa ward
|
|
Ksh. 3,977,880.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Construction of Jatropha-Mulungun Dispensary-Jirikokole Kaskini Water Pipeline in Marafa Ward
|
|
Ksh. 14,606,400.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Equiping of Duke borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Stalled |
County |
Construction Of Ict Lab Dzitsoni Youth Polytechnic
|
|
Ksh. 4,984,760.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
2no. Ecd Classrooms, Staff Room And 2 Door Toilet At Chasimba Central Pri
|
|
Ksh. 5,169,050.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction Of 2no Ecd At Bungu Pre-School
|
|
Ksh. 3,210,990.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed 4no. Ecd Classrooms, 2blocks Of 2no. Cubicle Pit Latrine & 4no. Cubicle Pit At Kaole Primary School Latrine
|
|
Ksh. 9,694,260.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction Of 2no. Ecd Classrooms And 2 Door Toilet At Tsalu Ecd School
|
|
Ksh. 4,586,870.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction Of 2no Ecd Classroom At Mafisini-Pre-Pry School
|
|
Ksh. 3,998,530.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of 2no Classrooms At Lubondo Pre-Pry School
|
|
Ksh. 3,991,170.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
2no. Ecd Classrooms,1no. Staff Room And 2 Door Toilet At Katikirieni Pri.
|
|
Ksh. 4,556,140.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction Of 2no. Electrical Classrooms At Dzitsoni Yp
|
|
Ksh. 4,006,780.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction Of 2no. Ecd & 2no. Door Pit Latrine At Kaswakini Village Pre-Pry Sch
|
|
Ksh. 4,504,080.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
2no. Ecd Classrooms, Staff Room And 2 Door Toilet At Kolongoni Primary
|
|
Ksh. 0.00 |
2015-07-01 |
2017-06-30 |
Completed |
County |
Propose Construction Of 2no. Ecd Classrooms For Mbomboni Pre-School
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
Equiping of Kilulu borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Stalled |
County |
Dharako water dam
|
|
Ksh. 7,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Wathala water project
|
|
Ksh. 8,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Magarini-Bungale 2No. Pump operators houses(grade 9)
|
|
Ksh. 2,846,630.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Kirosa-Danicha water project
|
|
Ksh. 10,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Kambi ya waya tc to kambi ya wayadispensary water extension project in Gongoni ward
|
|
Ksh. 999,804.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Completion of Fundisa-Kibao Cha Fundisa water pipeline in Gongoni ward
|
|
Ksh. 2,998,250.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of 2no. Ecd Classrooms At Dindiri Primary School
|
|
Ksh. 3,199,420.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of kambi ya wayaTC –kambi ya waya dispensary water project, Gongoni ward
|
|
Ksh. 999,910.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Construction of Mjanaheri Posta Water pipeline in Magarini Sub County
|
|
Ksh. 3,999,450.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of sogorosa village water distribution project in gongoni ward
|
|
Ksh. 1,499,750.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Propose Construction Of 2no. Ecd Classrooms For Mbomboni Pre-School
|
|
Ksh. 3,197,740.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Equiping of Kinyaule borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Stalled |
County |
Rehabilitation of Shomela-Majengo pipeline
|
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Equiping of Kibao cha Fundisa borehole
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
2no. Ecd Classrooms, Staff Room And 2 Door Toilet At Kolongoni Primary
|
|
Ksh. 6,363,150.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation of Shomela-Majengo water pipeline project in Gongoni ward Magarini Sub-countty
|
|
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Rehabilitation of Shomela-Boyani water pipeline
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction Of Ict Lab Pingilikani Youth Polytechnic
|
|
Ksh. 4,985,220.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
"Mjanaheri to Mapimo Water pipeline (3km) "
|
|
Ksh. 4,000,000.00 |
2017-07-01 |
2018-06-30 |
Stalled |
County |
Gongoni water pipeline extension project
|
|
Ksh. 15,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Construction Of Toilets At Mwazang'ombe Ecd
|
|
Ksh. 872,830.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Fundisa to Sogorosa 250CUM water staorage tank
|
|
Ksh. 6,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed Construction Of 4no. Ecd Classroom,2 Cubicle Pit Latrine And One 4 Cubicle Pit Latrine At Mwarakaya Pre Primary School
|
|
Ksh. 9,580,130.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Fundisa to Sogorosa water pipeline
|
|
Ksh. 5,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Sogorosa-Kambi ya Waya water pipeline
|
|
Ksh. 4,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Proposed Construction Of 4no. Edc Classrooms, 2no. And 4no. Cubicle Pit Latrine At Mitulani Pre-School
|
|
Ksh. 8,802,790.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Mjanaheri-Timboni water pipeline in Magarini ward
|
|
Ksh. 3,999,950.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Extension of water reticulation system at Sabaki Veterinary area
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction Of 2 No. Classrooms At Mbuyuni Ecd
|
|
Ksh. 3,928,170.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
4no. Sabaki-Maboromokoni water kiosk
|
|
Ksh. 2,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of Maboromokoni-Shella water pipeline.
|
|
Ksh. 7,600,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of 2no Ecd Classrooms And 2no Toilets At Kidutani Pre-Pry School
|
|
Ksh. 4,749,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Maboromokoni water kioski connection in Sabaki ward
|
|
Ksh. 1,499,200.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Kamale Water pipeline EXtesion project, Adu ward.
|
|
Ksh. 2,494,160.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of 2no Ecd Classroom At Gandini Pre-Pry School
|
|
Ksh. 4,001,210.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Msumarini –Kanagoni-Vibao Viwili water pipeline in Adu ward
|
|
Ksh. 9,221,550.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Supply and installation of Kambicha standby borehole pump
|
|
Ksh. 2,200,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Kadzandani pump house
|
|
Ksh. 1,600,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Ramada-Kwa Mboya pipeline rehabilitation
|
|
Ksh. 4,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Drilling and Equipping of Shakahola borehole
|
|
Ksh. 5,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Drilling and Equipping of Hawewanje borehole
|
|
Ksh. 5,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Drilling and Equiping of Matolani borehole
|
|
Ksh. 5,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Drilling and equiping of Bombi borehole
|
|
Ksh. 5,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Kambicha-Marereni water supply pipeline project
|
|
Ksh. 12,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Kadzandani Kisima cha Kufa Kaoyeni water pipeline rehabilitation project
|
|
Ksh. 5,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of Faraji dam
|
|
Ksh. 11,890,700.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Balagha Irrigation project - Infrastructure |
|
Ksh. 1,495,150.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Mwangani Waterpan |
|
Ksh. 4,759,800.00 |
2013-07-01 |
2014-06-30 |
Stalled |
County |
Supply and Delivery of Tractor Drawn Planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Proposed Routine Maintenance of A7-Junction - Ngomeni Road |
|
Ksh. 7,200,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Routine Maintenance of Misufini-Masheheni Road |
|
Ksh. 8,200,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction works of fish depots-mayungu |
|
Ksh. 9,485,380.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
Construction of a cassava solar drying shed |
|
Ksh. 704,900.00 |
2015-07-01 |
2019-06-30 |
Stalled |
County |
Proposed Rehabilitation of fish depot-Kilifi Central BMU |
|
Ksh. 5,937,210.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Kathama-Chakama pipeline Extension water project
|
|
Ksh. 16,979,800.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of Toilets At Kidutani Ecd
|
|
Ksh. 1,074,510.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Kadzandani Borehole.
|
|
Ksh. 13,740,000.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
Proposed completion of an Ablution Toilet for the Department of Agriculture Livestock Development and Fisheries |
|
Ksh. 1,523,370.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of 4 No Ecd Classrooms & 4 Door Pit Latrines & 2 Door Pit Latrines-Pingilikani Pre-primary school
|
|
Ksh. 8,382,440.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of 2 No. Classrooms And Toilets At Mwazang'ombe Ecde
|
|
Ksh. 3,938,630.00 |
2016-06-01 |
2017-06-30 |
Completed |
County |
Proposed Construction Of 2no. Cubicle Pit Latrine At Mwarakaya Polytechnic
|
|
Ksh. 1,493,620.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Construction Of 2no. Cubicle Pit Latrine At Kizingo Pre-School
|
|
Ksh. 886,780.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
250m3 Blue scope water tank at Kadzandani wellfield.
|
|
Ksh. 6,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Fence construction - fisheries office |
|
Ksh. 2,900,000.00 |
2015-07-01 |
2019-06-30 |
Terminated |
County |
Proposed Construction Of 2no. Cubicle Pit Latrine At Kizingo Pre-School
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Completion of Chain Links Fencing at Kilifi Fisheries Office |
|
Ksh. 1,611,530.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction Of 4 No Ecd Classrooms & 4 Door Pit Latrines & 2 Door Pit Latrines At Junju Ecd Centre
|
|
Ksh. 9,442,580.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Refurbishment Of Zero Grazing Units ATC |
|
Ksh. 3,904,630.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction Of 2no. Ecde Classrooms At Sirini Pry School
|
|
Ksh. 3,133,300.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Kadzandani-Adu-Kamale water pipeline
|
|
Ksh. 36,000,000.00 |
2014-07-01 |
0000-00-00 |
Completed |
County |
Construction Of 2no. Classrooms At Sirini Nursery School.
|
|
Ksh. 3,338,850.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Excavation of water pans-Magarini(Kwa Mboya & Kwa Chembe)
|
|
Ksh. 5,300,000.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Construction Of 2 No Ecd Classrooms At Bodoi Primary School
|
|
Ksh. 1,708,960.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Standby Generator for Kambicha pumping station
|
|
Ksh. 2,300,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of 1no. Ecd At Mafisini Pre School
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,708,960.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Standby Generator for Adu pumping station
|
|
Ksh. 2,300,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction Of Aquaculture Lab At Mtwapa ATC |
|
Ksh. 11,062,700.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Kanyumbuni borehole
|
|
Ksh. 5,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Marereni-Kanagoni phase I water project
|
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Construction Of 4 No Ecd Classrooms & 4 Door Pit Latrines & 2 Door Pit Latrines At Vipingo Central Pre School
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 7,844,370.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Baricho-Dhololo Water Pipeline in Garashi ward
|
|
Ksh. 5,378,350.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction Of 1no. Ecd At Bungu Pre School
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,708,960.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of Ecd Classrooms At Kisiwani Nursery School
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Karimboni-Pumuani-Makumba water pipeline in Garashi Ward
|
|
Ksh. 14,622,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of Ecde Classrooms At Bodoi Pry School
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,222,560.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Development Of ATC Irrigation |
|
Ksh. 1,990,130.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Garashi-Karimboni pipeline
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction Of Toilets At Mirimamine Ecd
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 993,169.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of Garashi-Bore pipeline
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Rehabilitation of bungale Marafa pipeline
|
|
Ksh. 10,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of Ecd At Bureni Nursery
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,437,010.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Equipping of Karimboni borehole in Garashi ward
|
|
Ksh. 3,949,850.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of A Two Door Pit Latrine At Mtwapa ATC |
|
Ksh. 797,059.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of 2no Toilets At Bomani Kireme Ecd
|
|
Ksh. 993,169.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Upgrading of water pipeline at Sita One
|
|
Ksh. 3,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Watamu-Kanani pipeline water project
|
|
Ksh. 11,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Jacaranda-Mayungu phase II pipeline
|
|
Ksh. 12,000,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction Of 2no. Ecde Classrooms At Mto Mkuu Pry School
|
|
Ksh. 3,989,270.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Mkenga water project with 1no. Water tank.
|
|
Ksh. 6,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction Of 2no. Ecde Classrooms At Mapawa Pry School
|
|
Ksh. 3,312,550.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction Of 2no Classrooms At Chodari Pre School
|
|
Ksh. 39,161,200.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of Ng'ombeni Water Pan |
|
Ksh. 2,998,380.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Construction Of 2no Ecd Classrooms For Gongoni Pre-Primary School
|
|
Ksh. 3,850,880.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of Fish Depot-Kuruitu |
|
Ksh. 8,962,520.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
Construction Of 2n0. Ecd, Administration Block & 4no. Cubicle Pit Latrine At Junju Polytechnic
|
|
Ksh. 1,492,060.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Vipingo Slaughter House Fencing |
|
Ksh. 3,545,770.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Construction Of 2no. Classrooms At Bomani Kireme Pre School
|
|
Ksh. 2,980,200.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of 4no. Door Cubicle Pit Latrine At Bureni Pre School
|
|
Ksh. 1,492,060.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Construction Of 2n0. Ecd, Administration Block & 4no. Cubicle Pit Latrine At Junju Polytechnic
|
|
Ksh. 8,621,900.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction Of 2no. Classrooms At Bureni Nursery School
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Marriculture Ponds Construction |
|
Ksh. 1,002,740.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction Of 2no Ecd Classrooms For Gongoni Pre-Primary School
|
|
Ksh. 0.00 |
2015-07-01 |
2017-06-30 |
Ongoing |
County |
Proposed 4no. Ecd Classrooms, 2blocks Of 2no. Cubicle Pit Latrine & 4no. Cubicle Pit Latrine- Baharini pre- school.
|
|
Ksh. 9,730,740.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Supply and Delivery of Tractor Drawn Planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction Of 2no. Ecd Classrooms At Tunzanani Pre-Pry School
|
|
Ksh. 3,952,120.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Procurement of 10 farm Tractors |
To increase crop production |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Construction Of 2 No Ecd Classrooms At Mtepeni Ecd
|
|
Ksh. 0.00 |
2014-07-01 |
2015-06-30 |
Stalled |
County |
Construction Of 2no. Ecd Classrooms At Ushindi Mtepeni Pre School
|
|
Ksh. 3,849,030.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction Of 2 & 4no. Cubicle Pit Latrine At Matandale Pre Pry School.
|
|
Ksh. 2,988,270.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction Of Mtepeni Polytechnic
|
|
Ksh. 11,897,200.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Mida Mitsajeni water project
|
|
Ksh. 2,500,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Ngala Girls water project.
|
|
Ksh. 3,300,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Mijomboni-Kizingo pipeline Extension water project
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
Mkenge pipeline extension
|
|
Ksh. 4,830,840.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Dama Iha yard tap and Storage Tank.
|
|
Ksh. 489,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Dongokundu-Kisiwani water project phase II
|
|
Ksh. 1,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Reserve water pipeline in Mnarani ward
|
|
Ksh. 988,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of tank and water pipeline mnarani ward
|
|
Ksh. 966,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction 50m3 ferrocement water tank at Mwakuhenga in mwarani ward Kilifi south sub county
|
|
Ksh. 998,942.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction 50m3 ferrocement water tank at Mavueni Msikitini Kilifi north subcounty
|
|
Ksh. 999,005.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Construction of 50m3 ferrocement water tank at Co-operartive Mnarani ward
|
|
Ksh. 998,942.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 50m3 ferrocement water tank at Katana Ngari in Mnarani ward
|
|
Ksh. 999,460.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Supply and installation of 10m3 water tanks at Mavueni Midzimitsano
|
|
Ksh. 1,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 50m3 ferrocement water tank at ACK Mitangoni in Mnarani Ward
|
|
Ksh. 999,294.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Supply and installation of 10m3 water tanks at Takaungu Maweni
|
|
Ksh. 1,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
supply and installation of plastic tank at takaungu maweni and construction of plinth and yard tap
|
|
Ksh. 980,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Construction of 50m3 ferro cement water storage tanks at mavueni ya kati
|
|
Ksh. 995,438.00 |
2017-07-01 |
2018-06-30 |
Stalled |
County |
Construction of 50m3 ferro cement water tank
|
|
Ksh. 980,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Supply and installation of 10m3 water tanks at Mavueni ya kati
|
|
Ksh. 1,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Drilling of 1no. Borehole at Majajani
|
|
Ksh. 600,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
drilling of 1no. Borehole at Kadzinuni
|
|
Ksh. 600,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Drilling of 1no. Borehole at Kayanda
|
|
Ksh. 600,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Drilling of 1no. Borehole at Reserve
|
|
Ksh. 600,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Drilling of 1No. Borehole at Katsuhanzala
|
|
Ksh. 600,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Makonde-Katana Ngari water supply pipeline
|
|
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Mnarani boreholess
|
|
Ksh. 800,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Mnarani water tanks 3no.
|
|
Ksh. 3,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Mnarani water project
|
|
Ksh. 4,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of 1no. Water tank at Reserve
|
|
Ksh. 1,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1no. Water tank at Majajani
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1no. Water tank at Majajani
|
|
Ksh. 1,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1No. Water tank at Kiriba
|
|
Ksh. 994,700.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1No. Water tank at Mbogolo
|
|
Ksh. 994,700.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Drilling of 1no. Borehole at Madevu
|
|
Ksh. 600,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Purchase of 1No. Water tank at kidunda.
|
|
Ksh. 1,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 50m3 ferrocement water tank at Madevu in Mnarani Ward
|
|
Ksh. 999,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Extension of Madeteni-Kwa Nyauli –Khairut water project in Matsangoni ward,Kilifi North Sub County
|
|
Ksh. 2,580,020.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Extension of Mikanjeni Kairati water project in Matsangoni ward
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
1 no. Borehole with a pump and a plastic tank 5000L at chumani social hall
|
|
Ksh. 1,285,280.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Supplyf tanks and construction of plinths for 4no tanks in schools (kanani primary watamu,uyombo girl secondsry Matsangoni ) Bahati primary Tezo and Mavueni Mnarani
|
|
Ksh. 2,600,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 1 No. Ferro-cement water tank at Roka Maweni dispensary
|
|
Ksh. 1,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
"Construction of 1.no. 50m3 Ferro -Cement water tanks at Mpendakula Mkongani Matsangoni ward Kilifi north sub-county "
|
|
Ksh. 1,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Drilling of a borehole,equiping and installation of 5m3 plastic tank
|
|
Ksh. 1,285,280.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Roka water supply project
|
|
Ksh. 6,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Supply and installation of 12no. 10m3 plastic tanks
|
|
Ksh. 6,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Equiping of Mrima wa kuku Borehole kibarani ward Kilifi north subcounty
|
|
Ksh. 3,997,280.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Equipping of Cassava Borehole in Kibarani ward
|
|
Ksh. 3,918,510.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Drilling of 1no. Borehole at Mafumbini
|
|
Ksh. 600,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Mrima wa Kuku-Madeteni water pipeline project.
|
|
Ksh. 14,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Mtsanganyiko pipeline Extension water project
|
|
Ksh. 15,946,100.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Majaoni Water Pipeline Project in Tezo ward in Kilifi North Sub County
|
|
Ksh. 3,485,100.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Construction of Mikingirini water pipeline in Tezo ward
|
|
Ksh. 3,499,020.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Establishment of hybrid Eucalyptus demonstration woodlots
|
|
Ksh. 7,327,760.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Support greening school program-in Ganze ward
|
|
Ksh. 5,395,040.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Reforestation of degraded woodlands and forests
|
|
Ksh. 9,311,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Dungicha-Vimbirini pipeline
|
|
Ksh. 4,000,000.00 |
2018-07-01 |
2019-06-30 |
Stalled |
County |
Songea water project
|
|
Ksh. 2,048,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Malanga-Ndugu Mnani Water pipeline in Sokoke Ward
|
|
Ksh. 9,984,790.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Kitengwani-Danicha-Dzunguni Water Pipeline extension and upgrading of Phase I
|
|
Ksh. 5,444,630.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Ngamani Dam in Sokoke Ward
|
|
Ksh. 9,496,100.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of cassava shibe water project
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Drilling and equiping of Ndingiria borehole
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Mitsedzini-Mihirini water pipeline project
|
|
Ksh. 20,990,900.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Waste bins for solid waste management-All major towns
|
|
Ksh. 6,900,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Sabasaba-Mitsedzini pipeline Extension water project
|
|
Ksh. 14,813,300.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Matanomane-Kafuloni water pipeline project
|
|
Ksh. 15,947,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Malanga Primary and Mekatilili Secondary school water Connection
|
|
Ksh. 499,500.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Equipping of Rima Ra Pera borehole in Bamba ward
|
|
Ksh. 3,992,780.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Equipping of Maryango borehole in Bamba ward
|
|
Ksh. 3,979,060.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of Chira Dam in Bamba Ward
|
|
Ksh. 6,936,820.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Mwavumbo Dam in Bamba Ward
|
|
Ksh. 6,265,650.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
10no. Plastic water storage tanks of 10m3 each for emergency
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Water pipeline block 10 and water tank
|
|
Ksh. 1,500,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Kadzandani-Ngamani water project
|
|
Ksh. 7,000,000.00 |
2016-07-01 |
2017-06-30 |
Stalled |
County |
Ganze-Bamba risisng main pipeline
|
|
Ksh. 55,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Rehabilitation of Bamba-Kadzangani pipeline
|
|
Ksh. 5,300,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Support greening school program
|
|
Ksh. 5,395,040.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction Of 2no. Ecd Classrooms At Ushindi Mtepeni Pre School
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed 4no. Ecd Classrooms, 2blocks Of 2no. Cubicle Pit Latrine & 4no. Cubicle Pit Latrine At Mtwapa Maweni Primary School
|
|
Ksh. 9,338,540.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction Of 2no Ecd Classrooms And Toilets At Kizingitini Nursery School)
|
|
Ksh. 2,538,340.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine at Arabuko pre-primary school
|
|
Ksh. 10,432,300.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of 2 No ECD classrooms at Kirepwe in mzizima
|
|
Ksh. 3,266,870.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Renovation of Gede Polytechnic plus 2 classes
|
|
Ksh. 9,850,760.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
ECD 2No .Classroom Nzombere primary.
|
|
Ksh. 3,212,390.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Youth Empowerment centre at mnarani
|
|
Ksh. 2,147,380.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of 1No ECD classroom at Lamwembe(done at mkwajuni)
|
|
Ksh. 2,200,020.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of 1No ECD classroom at Mkomani
|
|
Ksh. 2,200,020.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Proposed construction 4No. ECD classrooms, 2 Cubicle pit latrine & one 4 Cubicle pit latrine
|
|
Ksh. 10,486,300.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Construction of 3no classrooms & 4 cubicle pit latrine(done upto SoyoSoyo) baraka chembe
|
|
Ksh. 518,984.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine at kanani Model centre
|
|
Ksh. 8,437,680.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 2NO. Classroms(Mkongani Nursery School)
|
|
Ksh. 0.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of ECD 2NO. Classroom at Matsangoni Primary School(Changed to Madeteni)
|
|
Ksh. 2,905,680.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of Sidzeni nursery school
|
|
Ksh. 1,646,740.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed construction of 4No. EDC classrooms, 2No. and 4No. Cubicle pit latrine
|
|
Ksh. 7,858,610.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 1no ecd at Matsangoni pre-school(done at Kiringi)
|
|
Ksh. 1,658,170.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed construction of 2No. Cubicle toilets for Youth Polytechnic
|
|
Ksh. 1,078,410.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Purchase of 5no. Water tanks(10,000lta)
|
|
Ksh. 1,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed Construction of Youth Polytechnic at Mdzongoloni
|
|
Ksh. 8,232,230.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Mwabogo pan
|
|
Ksh. 6,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTUCTION OF 2NO ECDE CLASSROOMS & 2NO. CUBICLE PIT LATRINE AT TUMAINI DERA
|
|
Ksh. 4,807,890.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Proposed Construction of 6No.Cess Shops in Gongoni,Gede,Kaloleni kwa Madaba,Mariakani Dam view,Ondoraf Trading Centre and Kakanjuni( Phase II) - Kilifi County
|
|
Ksh. 14,934,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Proposed Construction of 6No.Cess Shops in Gongoni,Gede,Kaloleni kwa Madaba,Mariakani Dam view,Ondoraf Trading Centre and Kakanjuni( Phase II) - Kilifi County
|
|
Ksh. 10,493,400.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed storage ground level and elevated steel tanks, booster pumps and general water reticulation at kilifi county treasury
|
|
Ksh. 9,993,190.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
CONSTRUCTIONOF 2NO ECD CLASSROOMS FOR CHANDO MAKOPANI
|
|
Ksh. 3,942,670.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed Office Extension, Refurbishment,Perimeter Wall and Paving Works
|
|
Ksh. 9,722,310.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 4No. 2 No. door toilets at EzaMoyoo ECD
|
|
Ksh. 1,960,450.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed Renovation of the County Treasury Hall - Kilifi County
|
|
Ksh. 4,541,400.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
CONSTRUCTIONOF 2NO ECD CLASSROOMS FOR CHANDO MAKOPANI
|
|
Ksh. 0.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
CONSTRUCTION OF 1NO ECD CLASSROOM AT MUHONI PRE PRY SCHOOL
|
|
Ksh. 21,292,400.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1 No classroom at Sosomakumba ECDE
|
|
Ksh. 2,189,020.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Proposed Renovations and Rehabilitation works of Planning Unit Block and Offices
|
|
Ksh. 4,186,440.00 |
2015-07-01 |
2016-06-30 |
Stalled |
County |
Construction of Water Tower at Kilifi County Treasury
|
|
Ksh. 1,590,500.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of County Central Store and offices in Kilifi Township
|
|
Ksh. 24,800,500.00 |
2014-07-01 |
0000-00-00 |
Completed |
County |
Construction of 1 No classroom at Pendeza ECDE
|
|
Ksh. 0.00 |
2016-07-01 |
2021-07-01 |
Ongoing |
County |
Construction of 1 No classroom at Ngamani ECDE
|
|
Ksh. 0.00 |
2016-07-01 |
0000-00-00 |
Ongoing |
County |
Construction of 1 No classroom at Mbaoni ECDE
|
|
Ksh. 0.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
CONSTRUCTION OF 1NO ECD CLASSROOM AT MANGORORO-PRE-PRY SCHOOL
|
|
Ksh. 0.00 |
2018-07-01 |
2021-03-06 |
Completed |
County |
Construction of 1 No. ECDE Classroom at Manganga
|
|
Ksh. 0.00 |
2015-07-01 |
0000-00-00 |
Ongoing |
County |
Construction of Sabaki Bridge Water Pipeline Magarini Ward |
|
Ksh. 3,000,000.00 |
2021-11-17 |
2022-06-30 |
Completed |
County |
Development of environmental policies |
To sustainably manage and conserve the environment |
Ksh. 15,000,000.00 |
2018-07-01 |
2022-06-30 |
Ongoing |
County |
Construction of 2No. Classrooms and 2 No. Door Toilets at Jaribuni polytechnic
|
|
Ksh. 0.00 |
2016-06-01 |
2017-06-30 |
Completed |
County |
Construction of 2No ECD classrooms and 2No. toilets at Korosho primary school
|
|
Ksh. 48,023,900.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine
|
|
Ksh. 0.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Proposed construction of 2No. ECD classrooms (done at Tezo Maweni)
|
|
Ksh. 2,893,760.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of 4no. Cubicle pit latrine at Zowerani ECD
|
|
Ksh. 1,444,320.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
Construction of 4no. Cubicle pit latrine at Zowerani ECD
|
|
Ksh. 1,444,320.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
Construction of 1no ecd at Mikingirini
|
|
Ksh. 1,748,930.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
Proposed construction of 2No. ECD classrooms at Tezo mwambeni
|
|
Ksh. 0.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
Construction of ECD toilets mwamba mtondia
|
|
Ksh. 138,650.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
2No. ECD Classrooms at Ngamani ECD
|
|
Ksh. 23,999,300.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of ECD toilets mwamba mtondia
|
|
Ksh. 1,386,350.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
Construction of Mtondia –Co-operative to Maweni Water pipeline in Tezo ward
|
|
Ksh. 3,998,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine at Mtondia Model centre
|
|
Ksh. 7,730,540.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Majivuni water pipeline in Tezo Ward
|
|
Ksh. 1,745,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1 No. Classroom at Ngerenya YP
|
|
Ksh. 1,930,990.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Proposed construction of 2No. ECD classrooms at kilifi primary school
|
|
Ksh. 3,742,910.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Construction of Tupendane Road water pipeline in Tezo Ward
|
|
Ksh. 2,995,800.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2NO. Classroms and 2NO. Toilets at ST.Thomas prymary
|
|
Ksh. 3,742,910.00 |
2014-07-01 |
2015-07-30 |
Terminated |
County |
Construction of Kokotoni water pipeline in Tezo Ward
|
|
Ksh. 4,502,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Mwambani water storage tank
|
|
Ksh. 1,500,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of modern youth polytechnic (to be in phase )-4classrooms
|
|
Ksh. 0.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
Tupendane Road water pipeline
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of modern youth polytechnic (to be in phase )-4classrooms
|
|
Ksh. 8,513,720.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
Construction of Kaereni water supply pipeline
|
|
Ksh. 1,999,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of water pipeline at kitsao nzai
|
|
Ksh. 1,495,500.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Proposed Construction of 1No. Ecd Classroom at Bodoi pre-school
|
|
Ksh. 2,368,880.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Kwa KitsaoNzai water pipeline
|
|
Ksh. 1,500,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 4No. Door cubicle pit latrine at Pendeza pre school
|
|
Ksh. 1,497,320.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Construction of 1 No. ECDE Classroom at Baraka ECD
|
|
Ksh. 1,997,680.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 1 No. ECDE Classroom at Ngoi |
|
Ksh. 1,799,020.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1 No. ECDE Classroom at Boponi Pry
|
|
Ksh. 1,649,200.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 1 No. ECDE Classroom at Chinyume Pry
|
|
Ksh. 1,684,360.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
"Construction of 2 No ECD classrooms at Matolani pre school "
|
|
Ksh. 0.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Provision of garbage collection personal protective implements
|
|
Ksh. 5,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Bisulubu-Majivuni water pipeline
|
|
Ksh. 4,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
"CONSTRUCTION OF 4NO. CUBICLE PIT LATRINE AT MBAONI PRE SCHOOL "
|
|
Ksh. 1,445,480.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Purchase of 2no. Water tanks at Ngerenya trading centre
|
|
Ksh. 700,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Supply and installation of 3no. 10m3 plastic tank
|
|
Ksh. 1,600,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1 No classroom at Mariani ECDE
|
|
Ksh. 2,091,910.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Kwa Kazungu Kashuru line 7 water project.
|
|
Ksh. 3,500,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Tezo-Ngala pipeline Extension water project
|
|
Ksh. 6,453,550.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
CONSTRUCTION OF 1NO ECD CLASSROOM AT MUHONI PRE PRY SCHOOL
|
|
Ksh. 2,292,370.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of Mtondia Dumpsite
|
|
Ksh. 3,600,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
3no. 10m3 plastic storage tanks(Soyosoyo)
|
|
Ksh. 1,600,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1 No classroom at Sosomakumba ECDE
|
|
Ksh. 2,189,020.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of Tezo Ngala water pipeline Phase II
|
|
Ksh. 7,000,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of an office with shade and chain link fencing with gates for nursery improvement and establishment in Tezo Ward
|
|
Ksh. 4,737,060.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 1 No classroom at Pendeza ECDE
|
|
Ksh. 2,200,850.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Drilling of borehole with hand pump at Kisumu ndogo
|
|
Ksh. 994,468.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 1 No classroom at Ngamani ECDE
|
|
Ksh. 2,399,260.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
supply of test pumping unit
|
|
Ksh. 13,805,500.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of 1 No classroom at Mbaoni ECDE
|
|
Ksh. 2,197,310.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
supply of casings and screens for borehole development
|
|
Ksh. 16,912,800.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Purchase and delivery of 5no plastic water storage tanks of 10m3 capacity
|
|
Ksh. 745,500.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
CONSTRUCTION OF 1NO ECD CLASSROOM AT MANGORORO-PRE-PRY SCHOOL
|
|
Ksh. 2,299,330.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Provision of garbage collection personal protective implements
|
|
Ksh. 5,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 1 No. ECDE Classroom at Manganga
|
|
Ksh. 2,260,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 2No. Classrooms and 2 No. Door Toilets at Jaribuni polytechnic
|
|
Ksh. 4,839,480.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Kilifi Town water reticulation upgrding project.
|
|
Ksh. 10,000,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Construction of 1 No classroom at Chivara ECDE
|
|
Ksh. 2,188,970.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of 1 No. ECDE Classroom at Vitsapuni
|
|
Ksh. 260,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of 1 No. ECDE Classroom at Mitangani Pry
|
|
Ksh. 1,669,130.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Greening and beautification of Kilifi town phase I |
|
Ksh. 10,000,000.00 |
2018-06-30 |
2018-06-30 |
Completed |
County |
2No. ECD Classrooms at Ngamani ECD
|
|
Ksh. 23,992,700.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
"Construction of 1no ecd at Mbonga pre-primary school(Done at Mdangarani) "
|
|
Ksh. 1,435,270.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
Construction of 3no ecd classrooms at Mbonga pre-primary school.
|
|
Ksh. 3,996,010.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
Construction of 1 No. ECDE Classroom at Maya
|
|
Ksh. 1,846,380.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
"Construction of 2No classrooms at Mdangarini primary school "
|
|
Ksh. 2,992,300.00 |
2014-07-01 |
2015-07-30 |
Completed |
County |
Construction of 1 No. ECDE Classroom at Dunguni Pry
|
|
Ksh. 1,828,110.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Proposed Construction of cubicle Pit latrine at Tandia Pre-school
|
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 987,902.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
Construction of 4No. door pit latrine at Sokoke pre-school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,426,920.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
Proposed Construction of a Door cubicle Pit latrine at Midzimitsano Pre-school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,358,990.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
Construction of 2 No ECD classrooms - Mido pre-school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 2,707,760.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Classroom at Mgamboni ECD |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 2,462,010.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
construction of 2 No. Classrooms at Kagomban |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,705,990.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of 1No.classrooms at Fudumulo ECD |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,705,990.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Procurrement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Supply and delivery of tractor drawn planters
|
Crop diversification |
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF 4NO. CUBICLE PIT LATRINE AT MAPOTEA |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,689,120.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of water supply system in the Governor's office block
|
|
Ksh. 1,966,220.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Proposed Construction of 2No.ECD classrooms at Tandia primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,286,340.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
2No. Sokoni borehole project.
|
|
Ksh. 993,192.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Development of irrigation infrastructure for Gandini Kwandezi irrigation scheme (Pipes and fittings)
|
Crop diversification |
Ksh. 3,408,200.00 |
2015-07-01 |
2017-06-30 |
Ongoing |
County |
Development of irrigation infrastructure for Burangi irrigation scheme (pumps and Pipes)
|
Crop diversification |
Ksh. 9,548,090.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Rehabilitation of Mwapula-Magogoni pipeline and extension to Mdangarani primary school water pipeline project
|
|
Ksh. 2,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Construction of 2No. Toilets(added to 10no. Toilets)at Sokoke pre-school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 2,472,790.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Drilling and Equipping of Ngamani Borehole in Jaribuni ward
|
|
Ksh. 3,982,990.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of 4No. Toilets at Neema pre-school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,404,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Kwa Mramba Katsangani Water pipeline in Jaribuni ward
|
|
Ksh. 2,998,060.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2 No ECD classrooms at Maojo Pre-school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,219,400.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Mbudzi Chivara water pipeline in Jaribuni ward
|
|
Ksh. 3,996,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Rehabilitation of Bibitole water pan
|
Crop diversification |
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of Mvuro water pipeline extension water pipeline in Jaribuni ward
|
|
Ksh. 3,998,650.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of 2 No. Classrooms at Muhoni ECD |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,533,580.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Mwapula Cattle Dip-Boyani ECD Phase I water pipeline in Jaribuni Ward
|
|
Ksh. 13,814,600.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Supply and delivery of tractor drawn planters
|
Crop diversification |
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Rehabilitation of Maya Water project in Jaribuni ward-Ganze sub-county
|
|
Ksh. 7,000,000.00 |
2017-07-01 |
2018-06-30 |
Ongoing |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of Wakala water pan
|
Crop diversification |
Ksh. 7,946,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Improvement of county tree nursery-All wards
|
|
Ksh. 2,500,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Supply and delivery of tractor drawn planters
|
Crop diversification |
Ksh. 1,400,000.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Mbonga-Katofeni water project
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Rehabilitation of Mbumachi water project.
|
|
Ksh. 3,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Waste bins for solid waste management-All wards
|
|
Ksh. 6,900,000.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Supply and delivery of tractor drawn planters
|
Crop diversification |
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Support greening school program-All wards
|
|
Ksh. 5,395,040.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Supply and delivery of water pumps for Kache Kajole
|
Crop diversification |
Ksh. 797,200.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Maboromokoni-Shela water project
|
|
Ksh. 7,600,000.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Palakumi pipeline extension
|
|
Ksh. 4,197,730.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed Routine Maintenance Of Kwakajole-Bendago-Bekambutu
|
|
Ksh. 25,000,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Proposed Routine Maintenance Of A7 Junction Kwa Kadzengo North Coast- Medical Training School
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 4,100,000.00 |
2017-07-01 |
2018-06-30 |
N/A |
County |
Supply and delivery of tractor drawn planters
|
Crop diversification |
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Marere-Jaribuni pipeline Extension
|
|
Ksh. 5,140,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Rehabilitation Of Burnoff To Mtwapa Health Centre And Kanamai
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 4,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
rehabilitation of coral rocks /watamu to jacaranda.
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 10,000,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
opening of access road to watamu market
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 7,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
rehabilitation of kizingo to jacaranda road road- 5KM
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 10,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Balagha Irrigation project - infrastructure
|
Crop diversification |
Ksh. 1,495,150.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Opening access road to watamu market-1km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 6,600,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
rehabilitation of mnarani roads.3km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 3,600,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Mwangani waterpan
|
Crop diversification |
Ksh. 4,759,800.00 |
2013-07-01 |
2014-06-30 |
Ongoing |
County |
Rehabilitation of Chumani roka to matsangani road-10km
|
|
Ksh. 9,400,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Supply and delivery of tractor drawn planters
|
Crop diversification |
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Opening ,grading and graveling of ROJOROJO/KONJORA 7.3km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 5,000,000.00 |
2014-07-31 |
2015-06-30 |
Completed |
County |
Development of Gandini Lukole Irrigation scheme
|
Crop diversification |
Ksh. 2,991,200.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Proposed Routine Maintenance of Kituoni Ngala Primary School Road
|
|
Ksh. 10,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
rehabilitation of kiwandani roads.-3km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 3,500,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Upgrading to bitumen of Kilifi rds-5.8km
|
|
Ksh. 252,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Completion of 4classrooms at Mpirani pre-schoo |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,194,300.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Opening of Kiwandani roads-2km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 2,000,000.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Proposed construction of 4No. EDC classrooms, 2No. and 4No. Cubicle pit latrine at baraka pre school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 7,972,420.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
construction of Classrooms at Kafuloni primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,626,120.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Establishment of tree nurseries project for Ganze ward
|
|
Ksh. 1,980,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of ECD 2no. Classrooms at ndugumnani primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,900,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Supply ,delivery and branding of 500l plastic water storage tanks in Ganze Sub County
|
|
Ksh. 499,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Supply ,delivery and branding of 500l plastic water storage tanks in Ganze Sub County
|
|
Ksh. 5,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF MWARAKAYA SOCIAL HALL |
|
Ksh. 9,593,250.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Supply ,delivery and branding of 500l plastic water storage tanks in Ganze Sub County
|
|
Ksh. 497,500.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Supply ,delivery and branding of 500l plastic water storage tanks in Ganze Sub County
|
|
Ksh. 999,800.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Procurement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
construction of classrooms at Maghudho primary school (Sokoke ward) |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,356,430.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction of a cassava solar drying shed
|
Crop diversification |
Ksh. 704,900.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Rehabilitation of Songea Water pipeline in Ganze Ward
|
|
Ksh. 3,995,000.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Ecd Classroom at Kwa Dadu |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,993,940.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed completion of an Ablution Toilet for the Department of Agriculture Livestock Development and Fisheries
|
Crop diversification |
Ksh. 1,523,370.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Classrooms at ndugumnani primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,900,000.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Procurrement of 10 farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Purchase of 5m3 tank with plinth at Mabirikani in Ganze Ward
|
|
Ksh. 299,670.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
ELECTRICAL INSTALLATION OF HELLS KITCHEN IN MARAFA
|
|
Ksh. 425,697.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Piping And Fittings For The ATC Pipe Water Connection.
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of Bale-Rare Water pipeline in Ganze Ward
|
|
Ksh. 6,328,170.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
UPGRADING OF BOMANI STADIUM
|
|
Ksh. 8,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
construction of ECD 2no. Classrooms at Kafuloni primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,626,120.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Development Of ATC Irrigation
|
|
Ksh. 1,990,130.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF A SOCIAL HALL AT BOMANI, PHASE 1
|
|
Ksh. 11,953,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Ganze camp-Baraka ECD water pipeline project
|
|
Ksh. 4,985,680.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
construction of ECD 2no. classrooms atMbwana primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,416,620.00 |
2015-07-01 |
2020-06-30 |
Completed |
County |
Construction Of A Two Door Pit Latrine At Mtwapa ATC
|
|
Ksh. 797,059.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction Of 2no. Pit Latrine For Chasimba Youth Group
|
|
Ksh. 500,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction Of Fencing At ATC
|
|
Ksh. 3,807,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Proposed construction of Dungicha water pan project
|
|
Ksh. 7,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
construction of classrooms at Maghudho primary school . |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,356,430.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Construction Of A New Hostel Building At The Agricultural Training Centre(ATC) In Mtwapa
|
|
Ksh. 3,807,000.00 |
2020-07-01 |
2021-06-30 |
Completed |
County |
Chonyi Cultural Centre Chain Link Fencing
|
|
Ksh. 3,897,200.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Provision of garbage collection personal protective implements
|
|
Ksh. 5,000,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Procurement Of 10 Farm Tractors
|
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction Of Chonyi Amphitheatre
|
|
Ksh. 23,054,500.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of 2no. Ecd at Kwa Dadu |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,993,940.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Supply And Delivery Of Tractor Drawn Planters
|
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
construction of Classrooms at Bungale Primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,583,760.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Procurement Of 10 Farm Tractors
|
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Rehabilitation Of Ng’Ombeni Water Pan
|
|
Ksh. 2,998,380.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Improvement of county tree nursery-All wards
|
|
Ksh. 2,500,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Construction Of A Dias And 2.No Pit Latrines At Vipingo Community Sports Ground
|
|
Ksh. 2,645,780.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Procurement Of 10 Farm Tractors
|
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Mariakani-Shangia-Katolani water project.
|
|
Ksh. 9,800,000.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Supply And Delivery Of Tractor Drawn Planters |
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Waste bins for solid waste management-All wards
|
|
Ksh. 6,900,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Levelling And Grading Of Majengo Community Grounds
|
|
Ksh. 6,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Establishment of hybrid Eucalyptus demonstration woodlots
|
|
Ksh. 7,327,760.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
CONSTRUCTION OF RABAI KISURUTINI SOCIAL HALL
|
|
Ksh. 9,816,200.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
classrooms, Cubicle pit latrine & Cubicle pit latrine at Maekani pre- school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 9,886,200.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
CONSTRUCTION OF MULTI PURPOSE SOCIAL HALL AT RIBE
|
|
Ksh. 9,828,540.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Support greening school program-All wards
|
|
Ksh. 5,395,040.00 |
2014-07-01 |
2015-06-30 |
N/A |
County |
Construction of 2No. classrooms at Bamba VTC |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,923,590.00 |
2019-07-01 |
2020-06-30 |
Completed |
County |
CONSTRUCTION OF SOCIAL HALL AT MALINDI TOWN
|
|
Ksh. 6,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Procurement Of 10 Farm Tractors
|
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Construction of classroom at Chamamba Pre-primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 4,088,500.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF SOCIAL HALL AT MALINDI TOWN
|
|
Ksh. 9,140,660.00 |
2015-07-01 |
2016-06-30 |
N/A |
County |
Supply And Delivery Of Tractor Drawn Planters
|
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Procurement Of 10 Farm Tractors
|
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of Classrooms at Mnagoni primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,196,620.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
PROPOSED CONSTRUCTION OF A SOCIAL HALL AT KAKUYUNI
|
|
Ksh. 11,803,800.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Supply And Delivery Of Tractor Drawn Planters
|
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF A SOCIAL HALL AT MPIRANI
|
|
Ksh. 9,616,280.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
CONSTRUCTION OF ECD & CUBICLE PIT LATRINE AT MENGO PRE-PRY SCHOOL |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 4,988,660.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Procurement Of 10 Farm Tractors
|
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Construction of Marafa Social
|
|
Ksh. 9,616,090.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
Construction of Classrooms at Keresa primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,097,680.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Malanga-Ndugu Mnani Water pipeline in Sokoke Ward
|
|
Ksh. 9,984,790.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF 4 CUBICAL TOILET AT SABAKI BRIDGE
|
|
Ksh. 2,489,000.00 |
2016-07-01 |
2017-06-30 |
N/A |
County |
Supply And Delivery Of Tractor Drawn Planters
|
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of Classrooms at Kabelengani primary school " |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 1,483,800.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of Kitengwani-Danicha-Dzunguni Water Pipeline extension and upgrading of Phase I
|
|
Ksh. 5,444,630.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
CONSTRUCTION OF DABASO SOCIAL HALL
|
|
Ksh. 9,597,120.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
Sub County |
Procurement Of 10 Farm Tractors
|
|
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
2.No. Baada Nursery school classrooms |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 3,100,050.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Construction of Ngamani Dam in Sokoke Ward
|
|
Ksh. 9,496,100.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Gede Social Hall
|
|
Ksh. 11,753,600.00 |
2014-07-01 |
2015-06-30 |
Ongoing |
County |
"Proposed 4No. ECD classrooms, 2blocks of 2No. Cubicle pit latrine & 4No. Cubicle pit latrine for Maereni pre- school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 9,382,170.00 |
2013-07-01 |
2014-06-30 |
Completed |
County |
Rehabilitation of cassava shibe water project
|
|
Ksh. 3,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Supply And Delivery Of Tractor Drawn Planters
|
|
Ksh. 1,400,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
ELECTRICAL INSTALLATION OF MNARANI YOUTH EMPOWEREMENT CENTRE
|
|
Ksh. 372,602.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Drilling and equiping of Ndingiria borehole
|
|
Ksh. 10,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
RENOVATION OF MUDHIR HOUSE
|
|
Ksh. 4,000,000.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
classrooms and 1adminstarion block and Cubicle pit latrine at Godoma Polytechnic |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 7,080,300.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF SOCIAL HALLAT ROKA MAENDELEO YA WANAWAKE
|
|
Ksh. 9,016,150.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Mitsedzini-Mihirini water pipeline project
|
|
Ksh. 20,990,900.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF EZAMOYO SOCIAL HALL
|
|
Ksh. 11,995,700.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Waste bins for solid waste management-All major towns
|
|
Ksh. 6,900,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Construction of ECD Classrooms and 40 desks at biyubu primary school |
To enhance access, equity and quality of Early Childhood Development and Education (ECDE) so as to nurture every learner’s potential. |
Ksh. 4,369,010.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Equipping of Rima Ra Pera borehole in Bamba ward
|
|
Ksh. 3,992,780.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
CONSTRUCTION OF A SOCIAL HALL AT KIBARANI, PHASE 1.
|
|
Ksh. 11,377,300.00 |
2015-07-01 |
2016-06-30 |
Ongoing |
County |
Equipping of Maryango borehole in Bamba ward
|
|
Ksh. 3,979,060.00 |
2018-07-01 |
2019-06-30 |
N/A |
County |
Construction of Chira Dam in Bamba Ward
|
|
Ksh. 6,936,820.00 |
2018-07-01 |
2019-06-30 |
Completed |
County |
Construction of Mwavumbo Dam in Bamba Ward
|
|
Ksh. 6,265,650.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
10no. Plastic water storage tanks of 10m3 each for emergency
|
|
Ksh. 3,000,000.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
ARCHITECTURAL DESIGN AND CONSTRUCTION OF KILIFI STADIUM
|
|
Ksh. 5,000,000.00 |
2018-07-01 |
2019-06-30 |
Ongoing |
County |
Water pipeline block 10 and water tank
|
|
Ksh. 1,500,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
Ganze-Bamba risisng main pipeline
|
|
Ksh. 55,000,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF 4 CUBICAL TOILET AT KILIFI LIBRARY
|
|
Ksh. 2,491,260.00 |
2016-07-01 |
2017-06-30 |
Completed |
County |
Kadzandani-Ngamaniwater project
|
|
Ksh. 7,000,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
CONSTRUCTION OF SOCIAL HALL AT KIBAONI
|
|
Ksh. 4,506,220.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
CONSTRUCTION OF PUBLIC TOILET AT KIBAONI
|
|
Ksh. 4,461,090.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Opening &upgrading to gravel of mabirikani estate rds 8km.
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 14,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Rehabilitation of Bamba-Kadzangani pipeline
|
|
Ksh. 5,300,000.00 |
2015-07-01 |
2016-06-30 |
Completed |
County |
Procurement Of 10 Farm Tractors
|
Crop diversification |
Ksh. 55,900,000.00 |
2016-07-01 |
2017-06-30 |
Ongoing |
County |
rehabilitation of kiwandani roads.-3km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 3,500,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Rehabilitation of quarry roads - kilifi-3km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 4,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Pothole patching of Bofa to Hospital and CBD roads.1.4km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 81,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
rehabilltation of diamond kiteko-kaya road.1.5km
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 5,500,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Support greening school program
|
|
Ksh. 5,395,040.00 |
2014-07-01 |
2015-06-30 |
Completed |
County |
Bumps Installation
|
Increase Km of roads rehabilitated and maintained to motorable status |
Ksh. 4,000,000.00 |
2014-07-01 |
2015-06-30 |
Completed |
Flagship |
Capacity building |
To enhance skills |
Ksh. 500,000.00 |
1986-07-18 |
1986-07-18 |
Under Procurement |
County |
Lugwe Dispensary |
To increase no of health facilities |
Ksh. 3.00 |
2018-01-15 |
2018-07-26 |
Pre Procurement |
County |
Public Participation |
To involve the public in the county budgeting process |
Ksh. 20.00 |
2017-11-07 |
2017-12-29 |
Planned |
Sub County |
mwelel |
to broaden communication network in the County |
Ksh. 15.00 |
2017-11-30 |
2018-11-20 |
Ongoing |