Summary
Project Type No of Projects
Total Projects 353
Flagship Projects 71
National Projects 282
Ministry Specific Projects 0
County Specific Projects 0
Regional Wide Projects 0
International Projects 0
Flagship Projects by Pillar
Pillars No of Projects
Economic 0
Social 0
Political 0
Enablers and Macro 35
ICPD COMMITTMENTS 0
Bottom Up Economic Transformation Agenda Priorities 0
Infrastructure 0
Social 0
Environment and Natural Resources 0
Finance and Production 0
Governance and Public Administration 0
Flagship Projects by Departments
Departments No of Projects
Road Asset and Corridor Management 32
Urban Roads Development 38
Urban Roads Planning and Design 0
Policy, Strategy and Compliance 1
Director General Office 0
Corporate Services 0
Audit Services 0
Flagship Projects by Directorate
Directorate No of Projects
Road Asset Management 0
Regional Urban Roads Coordination -HQ 0
Construction 0
Special Projects 38
Structures 0
Planning and Design 0
Urban Traffic Management and Road Safety 0
Survey 0
Environmental and Social Safeguards 0
Strategy and Economic Planning 1
Enterprise Risk Management 0
Quality Assurance 0
Legal Services 0
Corporate Communication 0
Supply Chain Management 0
Research and Innovation 0
Finance and Accounts 0
Audit Services 0
Human Resource Management and Administration 0
Information and Communication Technology 0
Regional Urban Roads Cordination-Nyanza 0
Regional Urban Roads Cordination-Western 0
Regional Urban Roads Cordination-Coast 0
Regional Urban Roads Cordination-Central 0
Regional Urban Roads Cordination-Upper Eastern 0
Regional Urban Road Coordination-Lower Eastern 0
Regional Urban Road Coordination-Nairobi 0
Regional Urban Road Coordination-North Eastern 0
Regional Urban Road Coordination-South Rift 0
Regional Urban Road Coordination-North Rift 32
Flagship Projects by Project Status
Project Status No of Projects
Planned 0
Pre Procurement 0
Under Procurement 0
Ongoing 68
Terminated 0
N/A 0
National Projects by Pillar
Pillars No of Projects
Economic 0
Social 0
Political 0
Enablers and Macro 175
ICPD COMMITTMENTS 0
Bottom Up Economic Transformation Agenda Priorities 0
Infrastructure 0
Social 0
Environment and Natural Resources 0
Finance and Production 0
Governance and Public Administration 0
National Projects by Departments
Departments No of Projects
Road Asset and Corridor Management 247
Urban Roads Development 0
Urban Roads Planning and Design 34
Policy, Strategy and Compliance 1
Director General Office 0
Corporate Services 0
Audit Services 0
National Projects by Directorate
Directorate No of Projects
Road Asset Management 0
Regional Urban Roads Coordination -HQ 26
Construction 0
Special Projects 0
Structures 0
Planning and Design 34
Urban Traffic Management and Road Safety 0
Survey 0
Environmental and Social Safeguards 0
Strategy and Economic Planning 0
Enterprise Risk Management 0
Quality Assurance 1
Legal Services 0
Corporate Communication 0
Supply Chain Management 0
Research and Innovation 0
Finance and Accounts 0
Audit Services 0
Human Resource Management and Administration 0
Information and Communication Technology 0
Regional Urban Roads Cordination-Nyanza 30
Regional Urban Roads Cordination-Western 23
Regional Urban Roads Cordination-Coast 55
Regional Urban Roads Cordination-Central 30
Regional Urban Roads Cordination-Upper Eastern 18
Regional Urban Road Coordination-Lower Eastern 0
Regional Urban Road Coordination-Nairobi 22
Regional Urban Road Coordination-North Eastern 19
Regional Urban Road Coordination-South Rift 24
Regional Urban Road Coordination-North Rift 0
National Projects by Project Status
Project Status No of Projects
Planned 5
Pre Procurement 0
Under Procurement 1
Ongoing 238
Terminated 0
N/A 0
Ministry Specific Projects by Pillar
Pillars No of Projects
Economic 0
Social 0
Political 0
Enablers and Macro 0
ICPD COMMITTMENTS 0
Bottom Up Economic Transformation Agenda Priorities 0
Infrastructure 0
Social 0
Environment and Natural Resources 0
Finance and Production 0
Governance and Public Administration 0
Ministry Specific Projects by Departments
Departments No of Projects
Road Asset and Corridor Management 0
Urban Roads Development 0
Urban Roads Planning and Design 0
Policy, Strategy and Compliance 0
Director General Office 0
Corporate Services 0
Audit Services 0
Ministry Specific Projects by Directorate
Directorate No of Projects
Road Asset Management 0
Regional Urban Roads Coordination -HQ 0
Construction 0
Special Projects 0
Structures 0
Planning and Design 0
Urban Traffic Management and Road Safety 0
Survey 0
Environmental and Social Safeguards 0
Strategy and Economic Planning 0
Enterprise Risk Management 0
Quality Assurance 0
Legal Services 0
Corporate Communication 0
Supply Chain Management 0
Research and Innovation 0
Finance and Accounts 0
Audit Services 0
Human Resource Management and Administration 0
Information and Communication Technology 0
Regional Urban Roads Cordination-Nyanza 0
Regional Urban Roads Cordination-Western 0
Regional Urban Roads Cordination-Coast 0
Regional Urban Roads Cordination-Central 0
Regional Urban Roads Cordination-Upper Eastern 0
Regional Urban Road Coordination-Lower Eastern 0
Regional Urban Road Coordination-Nairobi 0
Regional Urban Road Coordination-North Eastern 0
Regional Urban Road Coordination-South Rift 0
Regional Urban Road Coordination-North Rift 0
Ministry Specific Projects by Project Status
Project Status No of Projects
Planned 0
Pre Procurement 0
Under Procurement 0
Ongoing 0
Terminated 0
N/A 0
County Specific Projects by Pillar
Pillars No of Projects
Economic 0
Social 0
Political 0
Enablers and Macro 0
ICPD COMMITTMENTS 0
Bottom Up Economic Transformation Agenda Priorities 0
Infrastructure 0
Social 0
Environment and Natural Resources 0
Finance and Production 0
Governance and Public Administration 0
Projects by County
Counties No of Projects
Baringo 15
Bomet 4
Bungoma 13
Busia 22
Elgeyo Marakwet 9
Embu 4
Garissa 11
Homabay 8
Isiolo 23
Kajiado 10
Kakamega 7
Kericho 4
Kiambu 10
Kilifi 82
Kirinyaga 7
Kisii 3
Kisumu 14
Kitui 4
Kwale 66
Laikipia 4
Lamu 45
Machakos 16
Makueni 2
Mandera 5
Marsabit 8
Meru 6
Migori 38
Mombasa 51
Muranga 2
Nairobi 28
Nakuru 9
Nandi 48
Narok 10
Nyamira 4
Nyandarua 5
Nyeri 6
Samburu 16
Siaya 4
Taita Taveta 6
Tana River 104
Tharaka Nithi 3
Trans Nzoia 3
Turkana 85
Uasin Gishu 6
Vihiga 1
Wajir 6
West Pokot 6
Project Budget by County
Counties Budget(KES)
Baringo
Bomet
Bungoma
Busia
Elgeyo Marakwet
Embu
Garissa
Homabay
Isiolo
Kajiado
Kakamega
Kericho
Kiambu
Kilifi
Kirinyaga
Kisii
Kisumu
Kitui
Kwale
Laikipia
Lamu
Machakos
Makueni
Mandera
Marsabit
Meru
Migori
Mombasa
Muranga
Nairobi
Nakuru
Nandi
Narok
Nyamira
Nyandarua
Nyeri
Samburu
Siaya
Taita Taveta
Tana River
Tharaka Nithi
Trans Nzoia
Turkana
Uasin Gishu
Vihiga
Wajir
West Pokot
County Specific Projects by Project Status
Project Status No of Projects
Planned 0
Pre Procurement 0
Under Procurement 0
Ongoing 0
Terminated 0
N/A 0

Success Stories

Improvement of Access in Informal Settlement

Date : 2022-10-26 03:10:53

Most of Informal Settlements in Nairobi had poor road network and drainages. This led to insecurity challenges, poor drainage, health concerns, delayed emergency response and inadequate access to social amenities. To address these challenges, the Governement through Kenya Urban Roads Authority constructed a total of 408KMs of roads in Mukuru, Dandora, Kangemi, Kawangware, Kibera, Korogocho, Roysambu, Mathare, Githurai, Waithaka, Riruta, Dagoretti and Kasarani. The project has led to improved access, improved livelihood, improved housing conditions, improved access to basic utilities and social amenities. 





Performance Based Routine Maintenence of Lot 9 Roads In Murang’a Municipality

Date : 2022-10-27 11:10:10

The project involved linking Makuyu Market with the residents of Mumbi. The road was improved from earth to all weather road.





Periodic Maintenanace of Lot 11 Roads in Thika Municipality (Magoko Road)

Date : 2022-10-27 11:10:08

The road was rehabilitated from eathworks to the black top and acccessibility to the SACDEP institution and its environs was improved





UPGRADING TO BITUMEN STANDARDS OF BORDER POINT (1A)

Date : 2022-10-27 11:10:30

PROJECT CONSISTED OF UPGRADING OF 0.5KM  TO BITUMEN STANDARDS.

THIS HAS IMPROVED MOBILITY AND ACCESSABLITY  AND ALSO SECURITYWITH THE VICINITY.

THE KDF CAMP IS SERVED BY THIS ROAD ALSO. 





Rehabilitation of Kileleshwa roads

Date : 2022-10-27 11:10:28

Roads in kileleshwa area were in poor condition and they lacked Non Motorised Transport  facilities.The Government of Kenya through Kenya Urban Roads Authority rehabilitated 7.8km of  kileleshwa roads to bitumen standards and constructed  walkways to enhance mobility, road safety and accessibility.





Upgrading To Bitumen Standards Of Wang`uru Girls - Wang`uru Stadium Road

Date : 2022-10-27 11:10:06

The project linked the Wanguru Girls access road to Wanguru stadium. The route serves other key users like the rice millers, private learning institutions, faith-based organizations, and businesses.





PROVISION OF NON MOTORIZED TRANSPORT FACILITIES IN NAIROBI

Date : 2022-10-27 11:10:42

Kenya Urban Roads Authority in enhancing urban mobility for all constructed 5km of of non-motorized transport facilitie in nairobi along Dunga road, James Gichuru Road, Naivasha road and Mwangeka roads. This is made up of 3m walkway and 2.5m cycle track. 

The provision of NMT has enabled may pedestrians and cyclists to access social amenities as well as opportunities for employment in several areas and enhance safety by provision of safe crossing points. The NMT facilities has ramps for PLWDs.  





Upgrading to Bitumen Standards of Kirinyaga Town Roads Phase 1

Date : 2022-10-27 11:10:08

The project entailed construction of 13km length of road, 1.5m NMT and lined drains. The main challenge was the black cotton soils in the area, where deep excavations of up to 1.5 m were done and rock fill was used to stabilize the ground prior to construction of the pavement layers.





Upgrading To Bitumen Standards of Nice Millers-Ack Church-B6 Junction Roads In Kirinyaga County

Date : 2022-10-27 11:10:56

The project entailed construction of 1.2 km length of road, 1.5m NMT and lined drains. The main challenge was the black cotton soils in the area, where deep excavations of up to 1.8 m were done and rock fill was used to stabilize the ground prior to construction of the pavement layers.





Supporting the Government's Big Four (4) agenda

Date : 2022-10-27 11:10:25

The Government of Kenya's Big Four(4) transformative agenda identified four priority initiatives. Kenya Urban Roads Authority (KURA) implemented several projects geared at supporting the agenda by providing access to several affordable housing schemes and manufacturing zones.

These included construction of 43.1Km in Starehe, Shauri Moyo, Ruai, Mariguini, Stoni Athi and East Africa Portlands Schemes in Nairobi and Machakos counties and 25Km to provide access to Kinanie Leather Industrial Park in Mavoko.





NAIROBI INTELLIGENT TRANSPORT SYSTEM AND JUNCTION IMPROVEMENT PROJECT

Date : 2022-10-27 11:10:36

The project involved establishment of fully intelligent and actuated systems and establishment of a Traffic Management Centre based in Barabara Plaza where the17 junctions in Nairobi are monitored from. This has helped reduce traffic delays at the junctions.





Improvement of roads into and within Gusii Stadium

Date : 2022-10-27 11:10:26

The government has been key in supporting sports talent development in kenya. One of the ways to do is through  construction of stadiums and  infrastructure into and within them.

Kenya Urban Roads Authority undertook a project costing Kshs. 82 million in Kisii town to improve accesiblity into and within the stadium. This was done by upgrading the road network and parking facilities.

Before the improvement, access to the stadium was not easy. there was alot of mud and vehicles ferrying those using the facility got stuck. the was also a problem of parking.

After the improvement, there was ease access and improved parking facilities within the stadium.

 





Upgrading of Kiandutu Estate road in Thika Municipality

Date : 2022-10-27 11:10:45

The project entailed construction of 0.5 km length of road with 80mm thick concrete paving blocks. The road was key in improving the lively hood of the local community through employment.





Upgrading of Shituhumi - Lukoye Road in Mumias

Date : 2022-10-27 11:10:11

The project involved upgrading of Shituhumi - Lukoye Road in Mumias. The road surface was earth with condition poor and certain sections rendered impassable due to deep gullys as a result of erosion. The area also experiences high water table with springs all over. The road acts as a bypass from Mumias town to Mumias - Bungoma Road. It also offers access to residents leaving along the road as well as institutions and social ammenities.

The project was able to upgrade the road thereby making it motorable. The project also harvested the spring water and intorduced points where over 200 households are now able to access clean water.





Upgrading To Bitumen Standards Of Baraton-Kamobo Road(Baraton Market) Nandi County

Date : 2022-10-27 12:10:07

Baraton-Kamobo Road fanally has tarmac!

The project has been undertaken by Kenya Urban Roads Authority.

The developed road will spur economic growth in the area as well as improve mobility

 





Periodic Maintenance of Gede Watamu road in Kilifi County

Date : 2022-10-27 12:10:10

Watamu is a tourism destination town in Kilifi County.Due to rapid  unplanned urbanization the natural storm water wayleaves have been affected by developments.This has led to flooding during the rainy season,resulting into transport  and communication cut -offs, accidents and waterborne diseases.During these times movement of people and goods are adversely affected including access to schools and hospitals.

It's for these reasons that the Authority proposed and implemented a storm water drainage project.The completion of this has greatly improve the livelihoods of  the Watamu residents and Kenyans at large.





CROSSING KIBERA SLUM IN TWO MINUTES

Date : 2022-10-27 03:10:31

Before construction of Mutuini Bridge

After construction of Lindi overpass and Mutuini Bridge

 

The construction to Bitumen Standard of Missing Link between Kibera and Langata  (ML12) has improved the livelihood in the Kibera slum and reduced travel time from Langata to the CBD by half. Initially it used to take up to two hours during peak hours to travel from Langata through the Langata Road to Community and the CBD. With the completion of the Missing Link it now takes less than five minutes to travel from Otiende in Langata to Ngong Road junction. The insecurity within the slum has reduced because of improved lighting as a result of installation of street lighting and increased traffic speeds. The residents do not have to fear heavy rains because the road is all weather and the Mutuini Bridge has high clearance hence there will be no possibility of flooding any more. The road is accessible at all times hence residents of Langata and Kibera can engage in 24 hour economy.

 

 

 





Upgrading to Bitumen Standards of Gatimene - Kienderu road in Meru Urban Centre

Date : 2022-11-04 04:11:40

The Gatimene to Kienderu road in Meru Urban centre was in a very poor state. The government of Kenya through Kenya Urban Roads Authority constructed 3.5km of the road complete with non-motorised facilities such as walkways.