Bomet Dashboard
|
Project Type | Project Name | Objective | Estimated Cost | Planned start date | Planned end date | Status |
---|---|---|---|---|---|---|
Project Type | Project Name | Objective | Estimated Cost | Planned start date | Planned end date | Status |
County | Procurement of Vocational Training Centre (VTC) Management System | Fast and efficient access to County services and information | Ksh. 2,000,000.00 | 2021-11-01 | 2022-05-02 | Pre Procurement |
County | Installation of client site masts | Improve and reliable communication between headquarters and sub counties | Ksh. 1,000,000.00 | 2021-11-01 | 2022-03-31 | Pre Procurement |
County | Development of ICT Network Infrastructure in at 3 completed Ward Offices - Ndanai/Abosi, Sigor and Kipsonoi | Installation of Local Area Networks (LAN) in buildings | Ksh. 4,000,000.00 | 2021-10-01 | 2022-03-31 | Pre Procurement |
County | Installation of Strategic Internet mast | Reliable communication | Ksh. 1,500,000.00 | 2021-10-22 | 2022-02-28 | Under Procurement |
Ward | Completion of Construction of jua kali shed - Kapset | Establishment of jua kali sheds | Ksh. 300,000.00 | 2021-02-19 | 2021-06-30 | Completed |
Ward | Completion of Construction of jua kali shed - Kembu | Establishment of jua kali sheds | Ksh. 716,818.00 | 2021-05-01 | 2021-11-01 | Completed |
Ward | Construction of a Jua Kali Shed in Chebunyo | Establishment of jua kali sheds | Ksh. 4,648,400.00 | 2020-07-01 | 2022-04-01 | Ongoing |
Sub County | Fencing of Chepalungu Forest | Formulate the development of tourism policy | Ksh. 1,460,000.00 | 2020-11-27 | 2021-05-27 | Completed |
County | Weights and Measures Equipment | Fair Trade and consumer protection | Ksh. 980,000.00 | 2021-01-20 | 2021-06-30 | Completed |
Ward | Construction of a shoe shiner shed | Establishment of jua kali sheds | Ksh. 798,323.00 | 2021-01-13 | 2021-06-30 | Completed |
Ward | Construction of a shoe shiner shed | Establishment of jua kali sheds | Ksh. 780,020.00 | 2021-03-01 | 2021-06-30 | Completed |
Ward | Construction of a shoe shiner shed | Establishment of shoe shiner sheds | Ksh. 764,847.00 | 2021-02-12 | 2021-06-30 | Completed |
Ward | Construction of a shoe shiner shed | Establishment of jua kali sheds | Ksh. 790,020.00 | 2021-01-08 | 2021-06-30 | Completed |
Ward | Construction of a shoe shiner shed | Establishment of jua kali sheds | Ksh. 800,000.00 | 2021-07-01 | 2022-02-28 | Ongoing |
Ward | Construction of a shoe shiner shed | Establishment of jua kali sheds | Ksh. 739,991.00 | 2021-02-12 | 2021-06-30 | Completed |
Ward | Construction of Market Shed | Establishment of jua kali sheds | Ksh. 4,967,010.00 | 2021-07-01 | 2022-02-28 | Ongoing |
Ward | Construction of Market Shed | Establishment of jua kali sheds | Ksh. 4,897,680.00 | 2021-07-01 | 2022-02-28 | Ongoing |
County | Enterprise development fund | To enhance value addition and market access in the County | Ksh. 40,000,000.00 | 2017-12-01 | 2022-11-01 | Planned |
County | Value addition and Marketing Development | To enhance value addition and market access in the County | Ksh. 7,300,000.00 | 2017-09-01 | 2022-08-01 | Ongoing |
County | Training and Capacity building on Cooperative management | To enhance value addition and market access in the County | Ksh. 6,000,000.00 | 2017-09-01 | 2022-08-01 | Ongoing |
County | Support to co-operatives | To enhance value addition and market access in the County | Ksh. 5,600,000.00 | 2018-01-18 | 2023-01-01 | Ongoing |
Ward | Leilatich Sweet potato processing plant | To enhance value addition and market access in the County | Ksh. 2,800,000.00 | 2020-01-01 | 2022-05-01 | Ongoing |
Ward | Fresh Produce Packhouse, Youth Farmers | To enhance value addition and market access in the County | Ksh. 5,300,000.00 | 2020-12-01 | 2022-06-30 | Ongoing |
Ward | Construction of ECDE classroom at Chebirir Primary School | Construction of ECD classrooms | Ksh. 1,148,500.00 | 2021-01-04 | 2021-09-30 | Completed |
Ward | Completion of ECDE classroom at Chebamban Primary School | Construction of ECD classrooms | Ksh. 747,760.00 | 2021-01-01 | 2021-11-01 | Completed |
Ward | CHEDA -Chebunyo, dairy processing | To enhance value addition and market access in the County | Ksh. 15,700,000.00 | 2021-01-01 | 2022-08-01 | Planned |
Ward | Construction of ECDE classroom and pit latrine at Agape Primary school | ECDE Infrastructure Development | Ksh. 1,660,850.00 | 2021-01-04 | 2021-09-30 | Completed |
County | Business development in cooperative societies | To enhance value addition and market access in the County | Ksh. 5,800,000.00 | 2021-07-01 | 2022-11-01 | Planned |
County | Environmental education and awareness | organize barazas and environmental education and awareness | Ksh. 200,000.00 | 2021-07-05 | 2021-09-30 | Under Procurement |
County | Public sensitization and engagement on climate change adaptation, mitigation and resilient measure | To Increase public awareness on environmental issues | Ksh. 2,000,000.00 | 2021-01-31 | 2021-06-30 | Completed |
Sub County | Installation of liter bins on Ndani and Sotik Towns | Acquisition of a solid waste management system | Ksh. 500,000.00 | 2021-03-01 | 2021-09-30 | Completed |
Ward | Construction of Chesambai forest office | To increase identification of unprotected and fragile ecosystems | Ksh. 3,000,000.00 | 2021-01-01 | 2021-10-31 | Completed |
Ward | Construction of gabions and check dams | Identify unprotected and fragile ecosystems | Ksh. 1,700,000.00 | 2021-07-01 | 2022-03-31 | Ongoing |
Ward | Tree Nursery/ Landscaping and installation of Water Tank | Establish woodlots and on-farm forests | Ksh. 800,000.00 | 2021-01-04 | 2021-11-01 | Completed |
County | Tree seedlings planting | To manage threats to environment quality and integrity and conserve, manage and ensure sustainably used county’s natural ecosystems | Ksh. 4,100,000.00 | 2021-01-04 | 2021-12-31 | Ongoing |
Ward | Itare water supply- Chepkosa pipeline extension | Develop and upgrade water supply infrastructure | Ksh. 2,700,000.00 | 2021-07-01 | 2022-04-30 | Ongoing |
Ward | Kipngosos water project- rising main | Develop and upgrade water supply infrastructure | Ksh. 4,000,000.00 | 2021-07-01 | 2022-04-30 | Under Procurement |
Ward | Gelegele water supply- pipeline distributions | Develop and upgrade water supply infrastructure | Ksh. 1,500,000.00 | 2021-07-01 | 2022-04-30 | Ongoing |
Ward | Itare water supply- Kimawit storage tank | Develop and upgrade water supply infrastructure | Ksh. 2,320,000.00 | 2021-07-01 | 2022-04-30 | Ongoing |
Ward | Ndanai water supply- rising main and return line | Develop and upgrade water supply infrastructure | Ksh. 3,200,000.00 | 2021-07-01 | 2022-04-30 | Ongoing |
Ward | Chebaraa Irrigation Scheme - Maintenance works | Develop and upgrade water supply infrastructure | Ksh. 1,100,000.00 | 2021-05-07 | 2021-10-31 | Completed |
Sub County | Siongiroi water project- rising main that will supply water to Siongiroi, Sigor and Chebunyo wards | Develop and upgrade water supply infrastructure | Ksh. 30,000,000.00 | 2021-01-04 | 2022-01-03 | Ongoing |
Ward | Kapcheluch water supply- pipeline extension | Develop and upgrade water supply infrastructure | Ksh. 2,300,000.00 | 2021-07-01 | 2022-04-30 | Ongoing |
Ward | Sergutiet water supply- rising main | Develop and upgrade water supply infrastructure | Ksh. 2,300,000.00 | 2021-07-01 | 2022-04-30 | Ongoing |
Ward | Mogombet water supply- Tumoiyot pipeline extension | Develop and upgrade water supply infrastructure | Ksh. 2,300,000.00 | 2021-07-01 | 2022-04-30 | Ongoing |
Ward | Kiplekwet water pan | Develop and upgrade water supply infrastructure | Ksh. 2,900,000.00 | 2021-07-01 | 2021-12-31 | Ongoing |
Ward | Mogombet water supply- Kaptilolwo-Chepngaina pipeline extension | Develop and upgrade water supply infrastructure | Ksh. 3,900,000.00 | 2021-07-01 | 2021-12-31 | Ongoing |
Ward | Sot Technical water project | Develop and upgrade water supply infrastructure | Ksh. 3,500,000.00 | 2021-07-01 | 2021-12-31 | Ongoing |
Ward | Construction of 100 M3 tank at Kongotik Water Project | Develop and upgrade water supply infrastructure | Ksh. 1,800,000.00 | 2021-07-01 | 2022-04-30 | Ongoing |
Ward | Extension of Kiptulwa water pipelines - Longisa Water Project | Develop and upgrade water supply infrastructure | Ksh. 2,400,000.00 | 2021-07-01 | 2021-12-31 | Ongoing |
Ward | Operationalization of Tinet Water Project | Develop and upgrade water supply infrastructure | Ksh. 500,000.00 | 2021-07-01 | 2021-12-31 | Ongoing |
Ward | Laying of water distribution lines/pipes at Longisa Water Supply - Kap James | Develop and upgrade water supply infrastructure | Ksh. 1,600,000.00 | 2021-07-01 | 2021-12-31 | Ongoing |
Ward | Disilting and Wall repair of Chepkesem and Kugunoi water pans | Develop and upgrade water supply infrastructure | Ksh. 3,600,000.00 | 2021-07-01 | 2021-12-31 | Ongoing |
Ward | High Iron Bean | To Improve food nutrition and access of certified seeds. | Ksh. 500.00 | 2020-11-10 | 2021-02-22 | Under Procurement |
Flagship | Skills training for vulnerable groups on entrepreneurship, farming, life skills & AGPO | To Provide social assistance, security and protection to enhance the living standards | Ksh. 13,000.00 | 2020-10-01 | 2020-10-31 | |
County | Bomet Fish Seed Centre Establishment | To establish Bomet fish seed Centre for production of quality fingerlings | Ksh. 300,000.00 | 2020-11-01 | 2021-06-30 | Under Procurement |
Ward | Construction of Milk Cooling Plants | To increase milk production and productivity | Ksh. 3,000,000.00 | 2020-11-01 | 2021-06-30 | Under Procurement |
County | Establishment of Apiaries | Procure modern beehives and equipment | Ksh. 2,200,000.00 | 2020-11-01 | 2021-06-30 | Under Procurement |
County | Bomet Fish Seed Centre Establishment | To establish Bomet fish seed Center for production of quality fingerlings To supply a fish feed mill to the Sub-County model farms for production of quality formulated fish feeds | Ksh. 300,000.00 | 2020-11-01 | 2021-06-30 | Under Procurement |
Sub County | Fish pond Establishment | LIV: Establishment of model fish farms at the Sub-county and Ward level, equipped with ponds and inputs. | Ksh. 200,000.00 | 2020-11-01 | 2021-06-30 | Under Procurement |
County | Renovation of Land & Survey offices& washrooms-HQ | To ensure proper management of housing stock, offices and estate maintenance | Ksh. 1,831,550.00 | 2019-10-01 | 2020-06-30 | Completed |
County | House Maintenance and Offices | To ensure proper management of housing stock and estate maintenance | Ksh. 2,800,000.00 | 2021-01-01 | 2021-06-30 | Planned |
County | Kapthomas Transformer maximization | To Increase access to electricity | Ksh. 3,322,010.00 | 2019-07-01 | 2020-06-30 | Completed |
County | Kapkulumben Matching funds projects | To increase access to clean Energy | Ksh. 2,515,080.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Avocado production | To improve production of avocado | Ksh. 3,000.00 | 2021-02-15 | 2021-04-16 | Under Procurement |
County | Renovation of Sotik TMC Houses | To renovate County Government Buildings | Ksh. 1,291,200.00 | 2019-10-01 | 2020-06-30 | Completed |
County | Partitioning office at Education Department | To improve office space for better service delivery | Ksh. 962,432.00 | 2019-10-01 | 2019-12-31 | Completed |
County | Transformer maximization | To increase the access to electricity | Ksh. 10,000,000.00 | 2019-07-08 | 2020-06-30 | Ongoing |
Ward | Acquisition of equipment for milk plant | Enhanced bargaining power for members for improved incomes by Promoting Co-operative education, entrepreneurship and enterprise development | Ksh. 10,000,000.00 | 2019-11-25 | 2021-01-22 | Completed |
Ward | Tenwek Judea | To improve security | Ksh. 365,289.00 | 2021-01-04 | 2021-05-31 | Pre Procurement |
Ward | Kanusin Floodlight | To improve security and business environment | Ksh. 365,289.00 | 2021-01-04 | 2021-05-31 | Pre Procurement |
Ward | Fencing of jua kali shed | Establishment of jua kali sheds | Ksh. 500,000.00 | 2020-02-10 | 2021-05-10 | Completed |
County | Revenue automation | to strengthen financial management | Ksh. 34.00 | 2018-07-01 | 2021-06-30 | Completed |
Ward | Completion of Njerian dispensary laboratory | Improve efficiency in health service delivery | Ksh. 1,000,000.00 | 2021-01-19 | 2021-06-30 | Ongoing |
County | COUNTY SPATIAL PLAN FOR BOMET COUNTY | Development control and land reforms | Ksh. 0.00 | 2018-02-05 | 2021-06-21 | Ongoing |
County | public financial management | Accounting and financial reporting | Ksh. 1.00 | 2020-07-01 | 2021-06-30 | Ongoing |
Ward | CHEBOLE MARKET LOCAL PHYSICAL AND LAND USE DEVELOPMENT PLAN | Development control and land reforms | Ksh. 2,998,890.00 | 2019-04-15 | 2019-08-05 | Ongoing |
Ward | MOGOGOSIEK MARKET LOCAL PHYSICAL AND LAND USE DEVELOPMENT PLAN | Development control and land reforms | Ksh. 1,906,810.00 | 2019-04-15 | 2019-08-05 | Ongoing |
Ward | Construction of Tagaruto dispensary toilets | Increase access to quality health care | Ksh. 350,000.00 | 2021-01-19 | 2021-06-30 | Completed |
Ward | Construction of a shoe shiner shed at Silibwet market ( 001) | To construct a shoe shiner shed | Ksh. 810,971.00 | 2019-07-22 | 2019-12-23 | Completed |
Ward | NDANAI MARKET LOCAL PHYSICAL AND LAND USE DEVELOPMENT PLAN | Development control and land reforms | Ksh. 1,995,500.00 | 2019-04-15 | 2019-08-05 | Ongoing |
County | Farm Mechanization | Agriculture: To improve farm mechanization | Ksh. 2,500.00 | 2020-10-08 | 2020-11-30 | Under Procurement |
Ward | CHEBUNYO MARKET LOCAL PHYSICAL AND LAND USE DEVELOPMENT PLAN | Development control and land reforms | Ksh. 2,998,890.00 | 2019-04-08 | 2019-08-05 | Ongoing |
Sub County | Kaptebengwet storm water drains | Improvement of urban drainage | Ksh. 4,000,000.00 | 2020-03-10 | 2020-06-16 | Completed |
County | Renovation of HR offices | To develop housing and estate management plans | Ksh. 899,550.00 | 2019-10-01 | 2020-06-30 | Completed |
Ward | MULOT TOWN LOCAL PHYSICAL DEVELOPMENT PLAN | Development control and land reforms | Ksh. 10,000,000.00 | 2019-04-15 | 2019-12-26 | Completed |
County | SVTCSG Capitation to VTCs | National Government Capitation to VTCs | Ksh. 57,875,000.00 | 2021-01-01 | 2021-06-30 | Pre Procurement |
County | Construction of Tailoring Workshop at Siwot VTC | To improve Infrastructural Facilities in VTCs | Ksh. 12,549,900.00 | 2021-01-01 | 2021-06-30 | Pre Procurement |
County | Leveraging on Co-operative Automation services | Linked information at the County Co-operatives and improve management and operations | Ksh. 3,800.00 | 2021-03-15 | 2021-06-30 | Planned |
County | BUSINESS DEVELOPMENT | Enhanced bargaining power for members for improved incomes by Promoting Co-operative education, entrepreneurship and enterprise development | Ksh. 5,800.00 | 2021-03-11 | 2021-04-30 | Planned |
Ward | Construction of a shoe shiner shed at Sigor | To construct a shoe shiner shed for traders | Ksh. 865,000.00 | 2020-01-20 | 2020-04-07 | Completed |
County | Training and capacity building of Cooperative societies | Train Cooperative societies management committees on good governance and leadership in cooperative societies | Ksh. 7,500.00 | 2021-03-09 | 2021-06-08 | Planned |
County | Aluminium partitioning of procurement store | To renovate County Government Buildings | Ksh. 948,919.00 | 2019-10-01 | 2020-06-30 | Completed |
Sub County | Mapping & assessment of PWDs | To assess 1250 PWDs across the county | Ksh. 500,000.00 | 2021-07-30 | 2021-07-30 | Ongoing |
Ward | Supply of Jua Kali Equipment | Promote vibrant industrial activities | Ksh. 2,000,000.00 | 2019-11-04 | 2020-04-06 | Completed |
Ward | Construction of Market Stalls/Shed at Ndanai Market | Construct market stall/shed at Ndanai for traders | Ksh. 4,879,680.00 | 2021-02-15 | 2021-05-20 | Planned |
County | enterprise development | Increase access to finance and affordable credit | Ksh. 5,000,000.00 | 2021-02-03 | 2022-06-30 | Planned |
Sub County | Sensitization against Gender-Based Violence | To sensitize pronvincial admnistrators, chiefs, village elders and nyumba kuni on GBV | Ksh. 500,000.00 | 2020-07-02 | 2021-06-30 | Ongoing |
Ward | Construction of Market Stalls/Shed at Longisa Market | Construction to completion of a market stall/ shed | Ksh. 4,879,680.00 | 2021-01-25 | 2021-05-20 | Planned |
County | Renovation of HQ Health Offices | Maintenance of Buildings and Stations -- Non-Residential | Ksh. 853,664.00 | 2019-10-01 | 2020-06-30 | Completed |
Ward | Construction of jua kali shades | Promote vibrant industrial activities | Ksh. 8,160,000.00 | 2019-11-15 | 2020-02-14 | Completed |
County | Quality Assessment in ECDE | Enhance quality learning and teaching in ECDE Centres | Ksh. 1,000,000.00 | 2021-01-04 | 2021-10-29 | Planned |
County | Trade Awards | Promote job creation and wealth generation | Ksh. 1,000,000.00 | 2021-02-19 | 2021-02-19 | Planned |
Sub County | Mugeni Cultural centre | To establish one cultural center in every sub-county across the county in each financial year. | Ksh. 2,000,000.00 | 2019-07-01 | 2021-06-30 | Ongoing |
County | Capacity Building | To facilitate effective teaching and learning of the new curriculum | Ksh. 800,000.00 | 2021-01-04 | 2021-10-29 | Ongoing |
County | Sotik sub county office | Administrative services | Ksh. 5,000,000.00 | 2020-07-25 | 2021-06-30 | Under Procurement |
County | Embomos ward office | Administrative services | Ksh. 7,000,000.00 | 2020-07-15 | 2021-06-10 | Under Procurement |
County | Kapletundo ward office | Administrative services | Ksh. 7,000,000.00 | 2020-07-15 | 2021-06-10 | Under Procurement |
Ward | LAN Networking of Mogogosiek Ward Office | ICT: Increased number of networked buildings | Ksh. 1,500,000.00 | 2020-03-31 | 2020-06-30 | Under Procurement |
Ward | LAN Networking of Kipsonoi Ward Office | ICT: Increased number of networked buildings | Ksh. 1,500,000.00 | 2020-03-01 | 2020-06-30 | Under Procurement |
Ward | LAN Networking of Sigor Ward office | ICT: Increased number of networked buildings | Ksh. 1,500,000.00 | 2020-03-01 | 2020-06-30 | Under Procurement |
Ward | LAN Networking of Kipreres Ward Office | ICT: Increased number of networked buildings | Ksh. 1,500,000.00 | 2020-03-01 | 2020-06-30 | Under Procurement |
Ward | LAN Networking of Ndarawetta Ward Office | ICT: Increased number of networked buildings | Ksh. 1,500,000.00 | 2020-03-01 | 2020-06-30 | Under Procurement |
County | Construction of Network Strategic Mast | ICT: Increased County wide bandwidth connectivity | Ksh. 150,000.00 | 2020-03-01 | 2020-06-30 | Under Procurement |
County | PROCUREMENT AND IMPLEMENTATION OF THE COUNTY HEALTH MANAGEMENT SYSTEM | ICT: Increased Automation of Government services | Ksh. 8,500,000.00 | 2020-03-02 | 2020-06-30 | Ongoing |
County | Licensing and renewal of liquor licenses. | Enforcing compliance to provisions of liquor control county acts. | Ksh. 643,000.00 | 2019-10-05 | 2019-12-31 | Ongoing |
National | Housing Developement - Under the BIG 4 Agenda | Develop housing and estate management plans | Ksh. 0.00 | 2020-01-01 | 2020-06-30 | N/A |
County | Water Bill and Policy | Develop relevant legislation and policies | Ksh. 2,000,000.00 | 2019-09-01 | 2019-10-31 | Planned |
County | Construction of Mother & child Memorial Wellness centre | To improve maternal, newborn and child health services | Ksh. 400,000,000.00 | 2018-07-02 | 2022-07-02 | Pre Procurement |
County | repair and maintenance of cattle dips | management and control of livestock tick borne diseases | Ksh. 3,600,000.00 | 2019-07-09 | 2020-06-25 | Under Procurement |
County | charging and replenishing of plunge dips | to manage and control livestock vector borne diseases | Ksh. 3,000,000.00 | 2019-07-03 | 2020-03-10 | Under Procurement |
County | acquisition of veterinary kits and equipment | improve quality and efficiency of veterinary service delivery | Ksh. 901,500.00 | 2019-07-01 | 2019-12-23 | Under Procurement |
County | subsidized artificial insemination services | to provide subsidized artificial insemination services to dairy farmers | Ksh. 6,000,000.00 | 2019-07-01 | 2020-06-30 | Under Procurement |
County | Assessment of VTC Centers | Provide Quality skilled training and increased access to VTC services | Ksh. 0.00 | 2019-09-16 | 2019-12-20 | Planned |
County | livestock vaccination | to control and manage priority notifiable livestock disease | Ksh. 9,000,000.00 | 2019-07-01 | 2020-06-30 | Under Procurement |
County | Assessment of ECD Centers | Provide Quality Education and increased access to ECDE services | Ksh. 0.00 | 2019-09-09 | 2019-12-31 | Planned |
Ward | kapcherany abattoir | improvement of hygiene and safety of food from animal origin | Ksh. 3,400,000.00 | 2019-01-02 | 2019-06-04 | Completed |
Ward | singorwet abattoir | improvement of hygiene and safety of food from animal origin | Ksh. 2,886,610.00 | 2019-01-01 | 2019-06-03 | Completed |
Ward | kipleljin abattoir | improvement of of hygiene and safety of food of animal origin | Ksh. 396,980.00 | 2019-01-01 | 2019-06-01 | Completed |
Ward | ndanai abattoir | improve hygiene and safety in food of animal origin | Ksh. 2,750,980.00 | 2019-01-03 | 2019-06-18 | Completed |
County | Construction of training Halls | Improvement of training facilities | Ksh. 4,900,000.00 | 2019-11-04 | 2020-06-30 | Terminated |
County | Green house technology | promote new agricultural technologies | Ksh. 4,900,000.00 | 2019-10-07 | 2020-05-04 | Under Procurement |
Ward | itembe cattle dip | to control livestock tick borne diseases | Ksh. 1,980,960.00 | 2019-02-03 | 2019-04-26 | Completed |
Ward | kapamban cattle dip | to control livestock tick borne diseases | Ksh. 1,980,960.00 | 2019-01-01 | 2019-03-06 | Completed |
County | E-government Services | ICT: Increased bandwidth size according to demand | Ksh. 10,000,000.00 | 2019-10-14 | 2020-05-29 | Ongoing |
County | Budget Implementation | Budget Preparation Coordination | Ksh. 3,000,000.00 | 2018-10-01 | 2019-07-10 | Completed |
County | Health policy development | To establish a fully functional health system at all levels | Ksh. 2,400,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | Capacity Development | Equip officers with skills for handling public complaints | Ksh. 3,000,000.00 | 2019-01-01 | 2019-12-31 | Ongoing |
County | Budget circular | Budget Preparation Coordination | Ksh. 3,000,000.00 | 2019-08-01 | 2019-08-30 | Completed |
County | County Fiscal and Strategy Paper | Budget Preparation Coordination | Ksh. 5,000,000.00 | 2019-01-01 | 2019-02-28 | Completed |
Ward | Singoiwek cattle dip | to control livestock tick borne diseases | Ksh. 2,587,040.00 | 2019-01-03 | 2019-04-15 | Ongoing |
County | County Budget Review and Outlook Paper | Budget Preparation Coordination | Ksh. 5,000,000.00 | 2019-08-20 | 2019-10-21 | Completed |
County | Public Complaints and Access to Information | To ensure timely resolution of public complaints and availability of information | Ksh. 3,000,000.00 | 2019-01-01 | 2019-12-31 | Ongoing |
Ward | lelechonic cattle dip | to control livestock tick borne diseases | Ksh. 1,980,960.00 | 2019-01-07 | 2019-04-02 | Completed |
County | Budget Estimates | Budget Preparation Coordination | Ksh. 50,000,000.00 | 2018-08-30 | 2019-04-30 | Completed |
County | Bomet Universal health care | Identification and registration of chronically ill patients and children with congenital disorders into NHIF scheme and updating the list. | Ksh. 60,000,000.00 | 2019-07-01 | 2020-05-29 | Ongoing |
Ward | Citizen's Role in Public Participation | Empower citizens to participate in budgeting and decision making | Ksh. 535,000.00 | 2019-11-01 | 2019-11-19 | Completed |
County | Annual development plan | to develop annual progress plan and policies | Ksh. 2,000,000.00 | 2019-11-10 | 2020-02-04 | Ongoing |
Ward | Capacity Building | Enhanced citizen engagement in decision making | Ksh. 35,000.00 | 2019-09-02 | 2019-12-30 | Completed |
County | construction of jua kali sheds | Establishment of jua kali sheds | Ksh. 13,000,000.00 | 2019-12-02 | 2020-03-30 | Planned |
Sub County | Construction of ndanai sub- county hospital toilets | Improvement of quality of health care service delivery | Ksh. 858,311.00 | 2019-12-05 | 2020-06-08 | Pre Procurement |
Ward | bemjat cattle dip | To control livestock tick borne diseases | Ksh. 2,386,170.00 | 2019-01-03 | 2019-05-16 | Ongoing |
County | Establishing and equipping E-centres | Reduced digital divide | Ksh. 4,000,000.00 | 2019-07-01 | 2020-07-31 | Planned |
Ward | Governor's Barazas | Citizen Participation and involvement in county governance | Ksh. 50,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Sub County | Construction of Merigi Access Road | Ksh. 2,000,000.00 | 2020-01-09 | 2020-03-09 | Under Procurement | |
County | Bomet Fish Seed Center establishment. | To establish Bomet fish seed Center for production of quality fingerlings To supply a fish feed mill to the Sub-County model farms for production of quality formulated fish feeds | Ksh. 500,000.00 | 2019-11-01 | 2020-06-30 | Under Procurement |
County | Bomet Intgrated Development Plan | Proper planning,development control and land reforms | Ksh. 10,000,000.00 | 2019-10-04 | 2019-12-05 | Ongoing |
County | Internet Related Services | Increased bandwidth size according to demand | Ksh. 4,800,000.00 | 2019-01-01 | 2019-12-31 | Ongoing |
Ward | Besiobei new dispensary | Increase access to quality health care | Ksh. 858,311.00 | 2019-12-05 | 2020-06-08 | Pre Procurement |
Ward | construction of kaplong dispensary | Improvement of quality of health care service delivery | Ksh. 858,311.00 | 2019-12-05 | 2020-06-08 | Pre Procurement |
Ward | New dispensary at Sitotwet | Increase access to quality health care | Ksh. 858,311.00 | 2019-12-05 | 2020-06-08 | Pre Procurement |
Ward | construction of koimeret/kamabwai | Improvement of quality of health care service delivery | Ksh. 858,311.00 | 2019-12-05 | 2020-06-08 | Pre Procurement |
Flagship | Chebunyo dairy processing plant | Improve milk prices and market access for County dairy products | Ksh. 15,000,000.00 | 2019-07-01 | 2020-12-01 | Ongoing |
County | Feeding programme in ECD | Feeding programme in ECD | Ksh. 5,000,000.00 | 2020-01-06 | 2020-05-25 | Planned |
County | Departmental training | To enhance their capacity in management of Revene collection | Ksh. 10,760,000.00 | 2020-05-26 | 2020-06-30 | Planned |
Flagship | FIRE STATION | ACQUISITION OF DISASTER MITIGATION EQUIPMENT | Ksh. 0.00 | 2020-02-03 | 2020-09-01 | Planned |
County | Indigenous poultry processing plant | To improve price and market access for County poultry farmers | Ksh. 5,000,000.00 | 2016-07-01 | 2017-07-31 | Ongoing |
Ward | construction of new dispensary at Areiyet | Increase access to quality health care | Ksh. 4,000,000.00 | 2019-12-05 | 2020-12-08 | Ongoing |
County | Teaching and learning materials in ECD | Provision of teaching learning materials | Ksh. 700,000.00 | 2019-12-31 | 2020-12-08 | Planned |
County | training on procurement procedures | Accounting and financial reporting | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | FIRE ENGINE | ACQUISITION OF DISASTER MITIGATION EQUIPMENT | Ksh. 50,000,000.00 | 2019-07-01 | 2020-06-30 | Pre Procurement |
County | Milk market outlets | To improve milk price and market access for County dairy farmers | Ksh. 6,000,000.00 | 2019-07-01 | 2020-12-31 | Planned |
County | Construction of ECD classrooms | construction of ECD classrooms | Ksh. 112,500,000.00 | 2019-09-02 | 2020-01-08 | Under Procurement |
County | Oldabach Coffee Pulping Unit | To improve prices and market access for County coffee farmers | Ksh. 4,500,000.00 | 2015-07-01 | 2018-07-31 | Ongoing |
County | Capacity Building of MSMES | Skills upgrading programmes | Ksh. 2,000,000.00 | 2021-03-08 | 2021-05-14 | Planned |
County | Fodder Establishment | Introduction of new livestock feed varieties and training of farmers on forage establishment and conservation. | Ksh. 2,700,000.00 | 2019-11-01 | 2020-06-30 | Under Procurement |
County | Furniture in ECD | Provision of furniture | Ksh. 4,050,000.00 | 2019-09-02 | 2020-01-06 | Ongoing |
County | automation of procurement | Accounting and financial reporting | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Revenue Automation | To strengthen financial Management | Ksh. 100,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | ICT Infrastructure for Cooperative Societies | To link all Cooperative Societies in the County into one common information platform | Ksh. 9,700,000.00 | 2019-07-01 | 2020-07-31 | Planned |
County | Support of tea buying centers | To improve post harvest handling of tea | Ksh. 300,000.00 | 2019-10-14 | 2020-06-30 | Under Procurement |
County | Horticultural Fresh produce Pack house | Competitive prices for horticultural farm produce | Ksh. 15,000,000.00 | 2017-07-03 | 2018-07-31 | Ongoing |
County | Establishment of Coffee nurseries | improve coffee productivity and farm income | Ksh. 3,000,000.00 | 2019-10-07 | 2020-06-30 | Ongoing |
County | Capacity building and training of HRH staff | To establish a fully functional health system at all levels | Ksh. 2,000,000.00 | 2019-07-01 | 2020-05-31 | Ongoing |
County | Counterpart funding (Matching Funds to REREC) | To Increase access to energysources | Ksh. 10,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Lelaitich Sweet potatoes processing plant | Competitive sweet potatoes prices | Ksh. 12,000,000.00 | 2018-07-02 | 2020-03-31 | Ongoing |
County | Irish potatoes processing plant | Value add sweet potatoes in the County | Ksh. 6,500,000.00 | 2018-07-02 | 2020-07-01 | Ongoing |
Sub County | Production of High iron Beans | Improve food and nutrition security | Ksh. 1,100.00 | 2019-11-14 | 2020-03-31 | Completed |
County | Development of Somorio Mini hydro-power project | To increase access to affordable and reliable energy sources | Ksh. 10,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Maintenance of street and floodlights | Installation of flood/street lights | Ksh. 5,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Banana production | Improve farm income food and nutrition security | Ksh. 400,000.00 | 2019-11-14 | 2020-06-30 | Planned |
Sub County | Fish pond establishment | LIV: Establishment of model fish farms at the Sub-county and Ward level, equipped with ponds and inputs. | Ksh. 400,000.00 | 2020-01-01 | 2020-06-30 | Under Procurement |
County | Health care financing | Improvement of quality health care service delivery | Ksh. 2,000,000.00 | 2019-07-01 | 2020-05-30 | Ongoing |
County | GOVERNORS RESIDENCE | EFFECTIVE AND EFFICIENT SERVICE DELIVERY | Ksh. 40,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Mango production | Agriculture; strengthen horticulture development | Ksh. 3,600,000.00 | 2019-11-14 | 2020-05-04 | Planned |
County | County Annual Progress Report(CAPR) | Develop County annual progress report | Ksh. 2,000,000.00 | 2019-12-03 | 2019-12-30 | Planned |
Ward | Construction of Milk Cooling Plants | To increase milk production and productivity | Ksh. 3,000,000.00 | 2019-11-01 | 2020-06-30 | Under Procurement |
County | Boreholes | Develop and upgrade water supply infrastructure | Ksh. 23,000,000.00 | 2019-08-01 | 2019-10-31 | Under Procurement |
Sub County | Chebaraa Irrigation Scheme | Lay irrigation infrastructure | Ksh. 4,000,000.00 | 2020-01-01 | 2020-03-31 | Ongoing |
County | Chebangang BIDP project | Develop and upgrade water supply infrastructure | Ksh. 35,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Electricity reticulation to public facilities/institution in the county | Installation of flood/street lights | Ksh. 5,000,000.00 | 2019-08-01 | 2020-05-29 | Ongoing |
County | Purchase of Youth Empowerment facilities and equipment | Empowerment and enhancement of talent among the youth | Ksh. 3,000,000.00 | 2020-01-01 | 2020-06-30 | Completed |
County | Youth Internship programme | Empowerment and enhancement of talent among the youth | Ksh. 27,000,000.00 | 2019-07-01 | 2020-03-31 | Completed |
County | Springs | Develop and upgrade water supply infrastructure | Ksh. 22,680,000.00 | 2019-12-01 | 2020-03-31 | Pre Procurement |
County | Storage Facilities | Develop and upgrade water supply infrastructure | Ksh. 5,000,000.00 | 2019-09-01 | 2020-03-31 | Planned |
County | Water Pans | Develop and upgrade water supply infrastructure | Ksh. 75,420,000.00 | 2019-12-31 | 2020-03-31 | Planned |
Sub County | Chebunyo Water Project | Develop and upgrade water supply infrastructure | Ksh. 1,000,000.00 | 2019-12-31 | 2020-02-29 | Planned |
Sub County | Taboino Water Project | Develop and upgrade water supply infrastructure | Ksh. 500,000.00 | 2019-09-01 | 2019-11-30 | Ongoing |
County | Climate Change Awareness | Training and public sensitization | Ksh. 4,000,000.00 | 2019-01-14 | 2020-04-16 | Planned |
Sub County | Kipngosos Water Project | Develop and upgrade water supply infrastructure | Ksh. 500,000.00 | 2019-09-01 | 2019-11-30 | Ongoing |
Sub County | Manaret Water Project | Develop and upgrade water supply infrastructure | Ksh. 2,000,000.00 | 2020-01-01 | 2020-02-29 | Planned |
Sub County | Kaptebengwet Water Project | Develop and upgrade water supply infrastructure | Ksh. 9,900,000.00 | 2019-07-01 | 2020-02-29 | Ongoing |
Inter County | Itare Water Supply | Develop and upgrade water supply infrastructure | Ksh. 60,840,000.00 | 2019-08-01 | 2020-01-31 | Under Procurement |
County | Installation of Litter bins | Establish waste collection points | Ksh. 500,000.00 | 2020-01-20 | 2020-04-10 | Planned |
Sub County | Kamureito Water Supply | Develop and upgrade water supply infrastructure | Ksh. 5,500,000.00 | 2019-09-01 | 2019-12-31 | Ongoing |
Sub County | Yaganek Water Project | Develop and upgrade water supply infrastructure | Ksh. 1,813,400.00 | 2019-08-01 | 2019-09-30 | Ongoing |
Sub County | Gelegele Water Project | Develop and upgrade water supply infrastructure | Ksh. 500,000.00 | 2019-08-01 | 2019-10-31 | Ongoing |
County | Construction of Check dams and gabions | Rehabilitate degraded landscapes | Ksh. 4,300,000.00 | 2019-09-02 | 2019-11-15 | Completed |
Sub County | Ndanai Water Supply | Develop and upgrade water supply infrastructure | Ksh. 4,000,000.00 | 2019-08-01 | 2020-02-29 | Ongoing |
Sub County | Sotik Water Supply | Develop and upgrade water supply infrastructure | Ksh. 3,500,000.00 | 2010-01-01 | 2020-03-31 | Ongoing |
Sub County | Chepalungu Water Supply | Develop and upgrade water supply infrastructure | Ksh. 2,000,000.00 | 2019-08-01 | 2019-10-31 | Ongoing |
County | Agroforestry | Establish woodlots and on-farm forests | Ksh. 15,000,000.00 | 2019-09-02 | 2020-05-18 | Ongoing |
Sub County | Siongiroi Water Project | Develop and upgrade water supply infrastructure | Ksh. 14,000,000.00 | 2019-08-01 | 2020-01-31 | Under Procurement |
Ward | Chemaner/Injerian Water Project | Develop and upgrade water supply infrastructure | Ksh. 500,000.00 | 2019-08-01 | 2019-10-31 | Ongoing |
Sub County | Sigor Water Supply | Develop and upgrade water supply infrastructure | Ksh. 4,200,000.00 | 2019-08-01 | 2019-12-31 | Ongoing |
County | Riparian Protection | Identify unprotected and fragile ecosystems | Ksh. 2,000,000.00 | 2020-01-06 | 2020-04-10 | Planned |
County | Environment Education and Awareness | organize barazas and environmental education and awareness | Ksh. 6,000,000.00 | 2019-12-09 | 2020-03-13 | Under Procurement |
Ward | Kongotik Water Project | Develop and upgrade water supply infrastructure | Ksh. 5,000,000.00 | 2019-08-01 | 2019-09-30 | Planned |
County | Skills training on entrepreneurship | to impart relevant skills to disadvantaged groups | Ksh. 2,000,000.00 | 2019-10-01 | 2019-12-31 | Ongoing |
County | Empower cultural practitioners with empowerment facilities | to preserve cultural heritage | Ksh. 2,000,000.00 | 2019-07-01 | 2019-12-31 | Ongoing |
County | Capacity building for groups for elders, nyumba kumi initiatives | To preserve cultural Heritage | Ksh. 2,000,000.00 | 2019-07-01 | 2019-12-31 | Ongoing |
County | Development of cultural policy | Cultural Developme nt | Ksh. 2,000,000.00 | 2019-10-01 | 2020-06-30 | Planned |
County | Cultural heritage site | promote cultural tourism | Ksh. 1,000,000.00 | 2019-07-01 | 2019-12-31 | Terminated |
County | PURCHASE OF BOOKS | to promote cultural heritage | Ksh. 2,000,000.00 | 2019-10-01 | 2020-06-30 | Planned |
County | Establishment of a library in Bomet Town | Cultural Developme nt | Ksh. 3,000,000.00 | 2019-10-01 | 2020-03-31 | Terminated |
County | Rescue Centre | to improve the welfare of Children | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | Capacity building for persons with disabilities in self-help groups on financial literacy and group dynamics | impart relevant skills to disadvantaged groups | Ksh. 1,500,000.00 | 2019-07-01 | 2019-12-31 | Ongoing |
County | Support Korara special school as community contribution of the completion of the dining hall | to improve welfare of Children | Ksh. 387,000.00 | 2019-07-01 | 2019-09-30 | Completed |
County | Support to children in children charitable institutions and special needs institutions with food stuff/ Christmas tree fund | to improve the welfare of Children | Ksh. 3,313,000.00 | 2019-11-01 | 2020-12-01 | Planned |
County | Avocado production. | Agriculture; strengthen horticulture development | Ksh. 8,000,000.00 | 2019-12-02 | 2020-06-30 | Pre Procurement |
County | County Development Fund | To promote the growth and development of investments | Ksh. 42,000,000.00 | 2020-02-10 | 2020-10-12 | Planned |
County | Public Education and Awareness Campaigns. | Public Education and Awareness campaigns. | Ksh. 0.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | KICOSCA Games | Development of sporting facilities | Ksh. 1,000,000.00 | 2019-07-01 | 2019-09-30 | Completed |
County | Center for Devolved Governance. | Organizing and implementing training programs. | Ksh. 0.00 | 2018-09-03 | 2019-06-30 | Ongoing |
Ward | Tinet Water Project | Develop and upgrade water supply infrastructure | Ksh. 1,500,000.00 | 2019-08-01 | 2019-09-30 | Ongoing |
County | Ballgames | Empowerment and enhancement of talent among the youth | Ksh. 2,500,000.00 | 2020-01-01 | 2020-06-30 | Completed |
Ward | MOGOGOSIEK WARD OFFICE | EFFECTIVE AND EFFICIENT SERVICE DELIVERY | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Terminated |
County | Gender mainstreaming on human resources, gender rights, ownership, gender roles. | to carry out effective gender mainstreaming | Ksh. 2,000,000.00 | 2020-01-01 | 2020-03-31 | Planned |
Ward | MERIGI WARD OFFICE | EFFECTIVE AND EFFICIENT SERVICE DELIVERY | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Terminated |
Sub County | Longisa Water Supply | Develop and upgrade water supply infrastructure | Ksh. 13,900,000.00 | 2019-08-01 | 2019-10-31 | Ongoing |
County | Land use policy | Effective use of land | Ksh. 2,000,000.00 | 2019-12-04 | 2023-12-04 | Ongoing |
County | Skills training on entrepreneurship | impart relevant skills to disadvantaged groups | Ksh. 2,000,000.00 | 2019-10-01 | 2019-12-31 | Planned |
Ward | CHEMANER WARD OFFICE | EFFECTIVE AND EFFICIENT SERVICE DELIVERY | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Terminated |
Sub County | Kapset/Muriasi Water Project | Develop and upgrade water supply infrastructure | Ksh. 500,000.00 | 2020-01-01 | 2020-03-31 | Ongoing |
County | ECDE Training of Teachers | Provide Quality Education and increased access to ECDE services | Ksh. 900,000.00 | 2019-12-15 | 2019-12-31 | Under Procurement |
County | Recruitment of HRH technical staff | MS-Improvement of quality health service delivery | Ksh. 8,359,590.00 | 2019-02-01 | 2020-06-30 | Planned |
Ward | Mogombet Water Supply | Develop and upgrade water supply infrastructure | Ksh. 3,500,000.00 | 2019-07-01 | 2019-10-31 | Ongoing |
Ward | CHESOEN WARD OFFICE | EFFECTIVE SERVICE DELIVERY | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Terminated |
County | Sports for special population | Talent identification and nurturing | Ksh. 600,000.00 | 2019-09-01 | 2019-12-31 | Completed |
Ward | Kaposirir Water Project | Develop and upgrade water supply infrastructure | Ksh. 4,000,000.00 | 2019-08-01 | 2019-10-31 | Ongoing |
Ward | SIGOR WARD OFFICE | ENSURE EFFECTIVE SERVICE DELIVERY | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Completed |
Ward | Sogoet Water Project | Develop and upgrade water supply infrastructure | Ksh. 1,000,000.00 | 2019-01-01 | 2020-02-29 | Ongoing |
County | Purchase of Sporting equipment | Talent identification and nurturing | Ksh. 3,800,000.00 | 2019-12-01 | 2020-06-30 | Completed |
Ward | KONGASIS WARD OFFICE | ENSURE EFFECTIVE SERVICE DELIVERY TO THE BOMET RESIDENTS | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Terminated |
County | Health Products and Technologies | Improvement of quality health service delivery | Ksh. 42,500,000.00 | 2019-09-01 | 2019-10-31 | Completed |
Ward | Kapsimbiri Water Project | Develop and upgrade water supply infrastructure | Ksh. 500,000.00 | 2019-08-01 | 2019-12-31 | Ongoing |
County | Support to alternative rite of passage(Tumdo Ne Lel) | improve welfare of children | Ksh. 700,000.00 | 2019-11-25 | 2019-12-10 | Ongoing |
Ward | RONGENA/MANARET WARD OFFICE | Ensure effective service delivery to Bomet residents | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Terminated |
County | Kapcheluch Water Supply | Develop and upgrade water supply infrastructure | Ksh. 750,000.00 | 2019-08-01 | 2019-10-31 | Ongoing |
County | Formation and registration of CBOs | impart relevant skills to disadvantages group | Ksh. 6,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | Equipment of jua kali sheds | Provide county Enterprise development Fund | Ksh. 4,000,000.00 | 2019-11-29 | 2020-03-29 | Planned |
Sub County | Marinyin Water Project | Improve access to safe and clean water | Ksh. 1,450,000.00 | 2019-08-01 | 2020-12-31 | Ongoing |
County | Renovation of examination rooms | MS-Introduction of specialised medical services | Ksh. 6,452,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | Installation of floodlights | Installation of flood/street lights | Ksh. 25,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Fencing of Eco-tourism site(sanctuary) identified and prioritized. | To protect and enhance conservation of natural resources. | Ksh. 16,100.00 | 2020-01-15 | 2022-01-20 | Planned |
Ward | KIPSONOI WARD OFFICE | provision of adequate administrative offices | Ksh. 3,610,000.00 | 2019-07-01 | 2020-06-30 | Completed |
Sub County | Bomet County Treatment and Rehabilitation Facility- Koiwa. | Construction and operationalization of Treatment and Rehabilitation Facility. | Ksh. 8,147,160.00 | 2017-09-04 | 2018-05-04 | Ongoing |
Ward | Construction works at Tegat Talent Academy | Development of sporting facilities | Ksh. 10,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of Dias | Development of sporting facilities | Ksh. 2,000,000.00 | 2020-01-01 | 2020-06-30 | Completed |
County | Merigi Water Project | Develop and upgrade water supply infrastructure | Ksh. 3,982,690.00 | 2019-08-01 | 2020-03-31 | Planned |
County | Psychosocial education/mentorship for children | improve welfare of children | Ksh. 2,000,000.00 | 2019-11-25 | 2019-12-10 | Ongoing |
Ward | Fencing of Sports stadia | Development of sporting facilities | Ksh. 2,000,000.00 | 2020-01-01 | 2020-01-31 | Completed |
Sub County | BOMET EAST SUB COUNTY AND LONGISA WARD OFFICE | provision of adequate administrative offices | Ksh. 5,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Community Health Units | To establish 20 new Community Units | Ksh. 8,000,000.00 | 2020-02-06 | 2020-04-06 | Planned |
Sub County | Aonet Water Project | Develop and upgrade water supply infrastructure | Ksh. 24,200,000.00 | 2019-07-01 | 2020-03-31 | Ongoing |
Ward | Levelling of fields | Development of sporting facilities | Ksh. 3,000,000.00 | 2020-01-01 | 2020-01-01 | Completed |
County | cultural training center/Museum in Bomet Town. | construct and equip cultural center | Ksh. 3,000,000.00 | 2019-10-01 | 2020-03-31 | Planned |
County | Bomet Water Supply | Develop and upgrade water supply infrastructure | Ksh. 8,150,000.00 | 2019-08-01 | 2020-03-31 | Planned |
County | Bomet IAAF Stadium | Development of sporting facilities | Ksh. 18,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Development of CAPR | TO develop a five year plan document | Ksh. 2,000,000.00 | 2019-12-04 | 2022-08-10 | Planned |
Flagship Project | Programme | Objective | Planned start date | Planned end date |
---|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
![]() |
|
Sigor Water Supply |
Date : 2019-12-05 11:12:51 |
Upgrading of the project complete with new intake works, treatment plant and distribution network. A hybrid system (solar and electricity) installed to reduce cost of pumping. 55,000 people served. Project implemented jointly with Kenya Red Cross and County government through BIDP. |
|
![]() |
|
Protection of springs |
Date : 2019-12-05 11:12:45 |
Over 60 springs have been protected across the County since 2017 thus improving access to safe and clean water. |
|
![]() |
|
Installation of Floodlights |
Date : 2019-12-05 12:12:08 |
Installed and fully functional floodlight at Bomet town main stage |
|
![]() |
|
Lelaitich Sweet potatoes processing plant |
Date : 2019-12-05 01:12:33 |
The factory is funded by County government of Bomet at a cost of 12 million Sweet potato is the most important security food crop in the County. Despite sweet potato’s potential to address universal goals including poverty eradication, food security and wealth creation, consistent market of the commodity has been a challenge rendering Many farmers in County cultivating sweet potato as a subsistence crop. County government of Bomet in collaboration with World vision is putting up a multi-million modern sweet potato processing factory at Lelaitich in Sigor Ward. The plant has the capacity to mill about 100 tonnes per day and will employ more than 300 people. |
|
|
|
Development of County annual development |
Date : 2019-12-05 02:12:28 |
the department has managed to developed; 1. CAPR 2. ADP 3.Monitong and evaluation reports 4. |
|
![]() |
|
Recarpeting of roads in Bomet Town |
Date : 2019-12-05 02:12:48 |
Recarpeting of roads Bomet Town |
|
![]() |
|
Construction of Storm water drainage in Bomet Town |
Date : 2019-12-05 03:12:51 |
Construction of Storm water drainage in Bomet Town |
|
![]() |
|
Governor's Public Barazas |
Date : 2019-12-05 03:12:35 |
Inspection and Commissioning of projects such as Muryaisi Bridge, Tembwet ECDE, Boito VTC & Boito Market |
|
![]() |
|
Civic Education |
Date : 2019-12-05 03:12:30 |
Capacity building of departmental directors on coordination of public paarticipation activities |
|
![]() |
|
The new modern fresh produce market in Bomet Town |
Date : 2019-12-05 04:12:20 |
The strategically located Modern market in Bomet Town where all the vendors including Mama mbogas trade their produce in a conducive, hygienic and sanitized environment |
|
![]() |
|
Sensitization |
Date : 2019-12-05 04:12:45 |
Sentisization of citizens in Merigi, Ndaraweta, Embomos, Rongena Manaret and Kongasis wards on their roles in public participation & budgeting. |
|
![]() |
|
Construction and completion of Chebole Public Toilet |
Date : 2019-12-06 12:12:41 |
A public toilet constructed and completed at Chebole Urban centre serving market vendors,businessmen,Clients and patrons thus improving sanitation within the centre.O |