Project Type | Project Name | Objective | Estimated Cost | Planned start date | Planned end date | Status |
---|---|---|---|---|---|---|
Project Type | Project Name | Objective | Estimated Cost | Planned start date | Planned end date | Status |
County | Sports tournament event facilitated | To enhance promotion and development of sports | Ksh. 3,000,000.00 | 2022-07-01 | 2023-06-30 | Completed |
County | Kenya Youth Inter-county Sport Association (KYISA) | create an enabling environment for development and management of sports and recreational activities | Ksh. 3,500,000.00 | 2021-07-01 | 2022-06-30 | Completed |
County | IRA , management systems development and digital revenue mapping | To enhance public financial management in the county | Ksh. 60,397,400.00 | 2022-07-01 | 2023-06-30 | Ongoing |
County | Drilling a borehole, equipping with a solar pumping system and construction of an elevated reservoir at Akibui construction of an elevated reservoir at Akiriamete | To mitigate andadapt to climate change | Ksh. 5,000,000.00 | 2023-07-17 | 2023-11-04 | Ongoing |
County | Repair of 100,000L elevated steel tank at Butula Dcc's Office, and pumps across Butula Sub-County. | To mitigate and adapt to climate change | Ksh. 4,000,000.00 | 2023-07-17 | 2023-11-04 | Ongoing |
County | Drilling a borehole, equipping with a solar pumping system and construction of an elevated reservoir at Akibui | To mitigate and adapt to climate change | Ksh. 5,000,000.00 | 2023-07-17 | 2023-11-04 | Ongoing |
County | Laying of the distribution mains, last mile connectivity and repair of the pumping system at Osieko Nambo Water Supply | To mitigate and adapt to climate change | Ksh. 5,000,000.00 | 2023-07-17 | 2023-11-04 | Ongoing |
County | supply and delivery of sports equipment for KICOSCA Games | create an enabling environment for development and management of sports and recreational activities | Ksh. 8,140,000.00 | 2022-07-01 | 2023-06-30 | Completed |
County | Construction of Kakapel community cultural center | create an enabling environment for development and management of sports and recreational activities | Ksh. 15,400,000.00 | 2022-07-01 | 2023-06-30 | Ongoing |
County | Supply, delivery, installation,testing and commissioning of 200KVA Standby generator. for BCRH | To enhance access to basic medical healthcare services | Ksh. 11,000,000.00 | 2023-07-07 | 2023-11-30 | Ongoing |
County | Proposed renovation of X-ray block at Alupe subcounty hospital | To enhance access to basic medical healthcare services | Ksh. 1,500,000.00 | 2013-07-07 | 2023-11-30 | Ongoing |
County | Completion of Amukura Level 4 Hospital Phase II | To enhance access to basic medical healthcare services | Ksh. 20,100,000.00 | 2023-07-07 | 2023-11-30 | Completed |
Ward | Maintenance of water projects and pipeline Extensions in Marachi West | To ensure that clean water is supplied for industrial and domestic use | Ksh. 2,000,000.00 | 2023-08-01 | 2023-11-30 | Planned |
county specific | Proposed construction and laying of cabros at Busia bus park | Well managed urban settlement | Ksh. 9,950,700.00 | 1899-12-31 | 1900-01-17 | Ongoing |
county specific | Proposed renovation of Malaba town Hall | Adequate, affordable and quality houses and buildings for county residents. | Ksh. 5,222,810.00 | 1899-12-31 | 1900-01-29 | Ongoing |
county specific | Proposed renovation of BCRH-senior staff quarters | Adequate, affordable and quality houses and buildings for county residents. | Ksh. 5,108,360.00 | 1900-01-29 | 1900-01-29 | Ongoing |
county specific | proposed construction of Malaba O.S.E.P Ablution block;winkers Malaba railway drainage,connection of Malaba bus park Ablution block to sewer | Well managed urban settlement | Ksh. 9,709,930.00 | 1900-01-29 | 1900-01-29 | Ongoing |
Ward specific | Purchase of land | To have sustainable land use within the county | Ksh. 5,500,000.00 | 1899-12-31 | 1900-01-29 | Ongoing |
county specific | Proposed upgrading of Alupe complex ring road to Bitumen standards (phase 1 and 2) | Well managed urban settlement | Ksh. 25,000,000.00 | 1899-12-31 | 1900-01-29 | Ongoing |
county specific | Proposed construction of designated parking areas( Laying of cabros-Busia Municipality) | Well managed urban settlement | Ksh. 100,000,000.00 | 1900-01-11 | 1900-01-29 | Ongoing |
county specific | Preparation of a spatial plan | To have sustainable land use within the county | Ksh. 20,000,000.00 | 1900-01-01 | 1900-01-29 | Ongoing |
Ward | Support sporting activities | create an enabling environment for development and management of sports and recreational activities | Ksh. 999,000.00 | 2022-07-01 | 2023-06-30 | Completed |
Flagship | Development county aggregation centers and industrial park | To improve the export promotion | Ksh. 250,000,000.00 | 2023-08-07 | 2024-06-30 | Ongoing |
Ward | Support sporting activities/tournaments | create an enabling environment for development and management of sports and recreational activities | Ksh. 1,071,000.00 | 2022-07-01 | 2023-06-30 | Completed |
Ward | Support of sporting activities / tournaments | create an enabling environment for development and management of sports and recreational activities | Ksh. 2,483,000.00 | 2022-07-01 | 2023-06-30 | Completed |
Ward | Supply and delivery of sports kits | create an enabling environment for development and management of sports and recreational activities | Ksh. 1,796,000.00 | 2022-07-01 | 2023-06-30 | Completed |
Ward | Sporting activities | create an enabling environment for development and management of sports and recreational activities | Ksh. 4,000,000.00 | 2022-07-01 | 2023-06-30 | Completed |
County | Supply of sports equipment for KICOSCA games | create an enabling environment for development and management of sports and recreational activities | Ksh. 8,140,000.00 | 2022-07-01 | 2023-06-30 | Completed |
County | Purchase of sporting equipment | create an enabling environment for development and management of sports and recreational activities | Ksh. 11,474,200.00 | 2022-07-01 | 2023-06-30 | Completed |
County | Stadia management | create an enabling environment for development and management of sports and recreational activities | Ksh. 5,000,000.00 | 2022-07-01 | 2023-06-30 | Planned |
County | Grants to groups | improve the society wellbeing | Ksh. 1,210,000.00 | 2022-07-01 | 2023-06-01 | Completed |
County | Liquor licensing board | health promotion | Ksh. 961,281.00 | 2022-07-01 | 2023-06-01 | Completed |
County | youth entrepreneurship and employability program | To promote Co ordinate and Enhance Youth Participation in Development Initiatives | Ksh. 1,000,000.00 | 2023-06-02 | 2023-07-01 | Ongoing |
County | purchase of sports equipment | create an enabling environment for development and management of sports and recreational activities | Ksh. 5,000,000.00 | 2022-07-01 | 2023-06-30 | Ongoing |
County | KICOSCA/EALASCA | create an enabling environment for development and management of sports and recreational activities | Ksh. 23,000,000.00 | 2022-08-01 | 2022-12-01 | Completed |
County | miss tourism | To promote increase in awareness of tourism potential of Busia county | Ksh. 3,500,000.00 | 2023-06-01 | 2023-06-30 | Completed |
County | KYISA | create an enabling environment for development and management of sports and recreational activities | Ksh. 1,161,600.00 | 2023-05-22 | 2023-06-01 | Completed |
County | Rehabilitation of degraded land across the County. | To rehabilitate degraded areas | Ksh. 2,187,600.00 | 2023-06-01 | 2023-06-30 | Pre Procurement |
County | Formulation of County irrigation policy | To Enhance irrigation governance and management | Ksh. 2,000,000.00 | 2023-06-01 | 2023-06-30 | Pre Procurement |
County | Rehabilitation of Ludacho small holder Irrigation Scheme | To enhance Sustainable Small Holder Irrigation and Drainage Systems | Ksh. 2,000,000.00 | 2023-07-17 | 2023-11-04 | Ongoing |
County | Development of ATC irrigation infrastructure | To enhance access to irrigation infrastructure | Ksh. 3,000,000.00 | 2023-07-10 | 2023-11-04 | Ongoing |
County | Rehabilitation of storage tower, replacement of tank at Mungatsi Water project | To increase access to clean and safe water | Ksh. 700,000.00 | 2023-07-05 | 2023-10-31 | Planned |
County | Maintenance of County headquarter borehole | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,600,000.00 | 2023-07-01 | 2023-10-31 | Planned |
Ward | Repair and maintenance of existing boreholes, repair of pipeline and pipe extension | To ensure that clean water is supplied for industrial and domestic use | Ksh. 3,500,000.00 | 2023-08-05 | 2023-11-30 | Planned |
Ward | Erection of water tank and installation of solar system at Emakina water project | To ensure that clean water is supplied for industrial and domestic use | Ksh. 2,000,000.00 | 2023-06-01 | 2023-06-30 | Planned |
Ward | Repair of boreholes ward wide | To ensure that clean water is supplied for industrial and domestic use | Ksh. 500,000.00 | 2023-07-01 | 2023-11-30 | Planned |
Ward | Repair and maintenance of water sources ward wide | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,500,000.00 | 2023-08-01 | 2023-11-30 | Planned |
Ward | Maintenance of water projects and pipeline extension | To ensure that clean water is supplied for industrial and domestic use | Ksh. 2,000,000.00 | 2023-07-05 | 2023-11-30 | Planned |
Ward | Repair of existing of boreholes and natural springs ward wide | To ensure that clean water is supplied for industrial and domestic use | Ksh. 700,000.00 | 2023-06-01 | 2023-06-30 | Planned |
Ward | Repair and maintenance of buyayi water project, installation of solar power system, construction of water kiosks and pipe extension to community / school. | To ensure that clean water is supplied for industrial and domestic use | Ksh. 3,250,000.00 | 2023-08-01 | 2023-11-30 | Planned |
Ward | Maintenance of water points and pipeline Extensions | To ensure that clean water is supplied for industrial and domestic use | Ksh. 700,000.00 | 2023-08-01 | 2023-11-30 | Planned |
Ward | Repair and maintenance of water pumps at kengatuny, amosing water project and apijan | To ensure that clean water is supplied for industrial and domestic use | Ksh. 3,000,000.00 | 2023-07-15 | 2023-10-31 | Planned |
Ward | Repair and maintenance of boreholes at mlimani, kwa mzee Ajuku, Kasukuba, Koomojong, Kwa mzee Amokoba, kwa mzee Kafu osajai chief office and IPC osajai | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,000,000.00 | 2023-07-05 | 2023-10-18 | Planned |
Ward | Repair of boreholes and water points( NB: BUDGETED UNDER PUBLIC WORKS BY MISTAKE.) | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,500,000.00 | 2023-07-15 | 2023-10-31 | Planned |
Ward | Water points repair at Atapar, Ongariama and Otimong | To ensure that clean water is supplied for industrial and domestic use | Ksh. 2,400,000.00 | 2023-07-10 | 2023-10-31 | Planned |
County | Maintenance of Apokor Water scheme | To ensure that clean water is supplied for industrial and domestic use | Ksh. 700,000.00 | 2023-07-20 | 2023-10-20 | Planned |
Ward | Repair of boreholes ward wide | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,000,000.00 | 2023-07-05 | 2023-10-31 | Planned |
Ward | Repair of Abai spring | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,000,000.00 | 2023-07-05 | 2023-11-15 | Planned |
Ward | Repair and Maintenance of boreholes ward wide | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,000,000.00 | 2023-07-06 | 2023-10-30 | Planned |
Ward | Repair/Maintenance and purchase of water accessories at Port Victoria water supply station | To ensure that clean water is supplied for industrial and domestic use | Ksh. 2,500,000.00 | 2023-07-06 | 2023-10-31 | Planned |
Ward | Repair of Boreholes ward wide and replacement of water tanks | To ensure that clean water is supplied for industrial and domestic use | Ksh. 800,000.00 | 2023-07-05 | 2023-10-31 | Planned |
Ward | Repair of shallow wells | To ensure that clean water is supplied for industrial and domestic use | Ksh. 500,000.00 | 2023-07-10 | 2023-10-31 | Planned |
Ward | Repairing of boreholes ward wide | To ensure that clean water is supplied for industrial and domestic use | Ksh. 500,000.00 | 2023-07-05 | 2023-10-31 | Planned |
Ward | Repairing and improvement of water system at Bukadanyi market | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,000,000.00 | 2023-07-31 | 2023-11-30 | Planned |
Ward | Repair and maintenance of boreholes ward-wide | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,000,000.00 | 2023-07-06 | 2023-10-31 | Planned |
Ward | Repair and maintenance of airstrip primary water works | To ensure that clean water is supplied for industrial and domestic use | Ksh. 3,500,000.00 | 2023-06-01 | 2023-06-30 | Planned |
Ward | Repair of Akudep Borehole | To ensure that clean water is supplied for industrial and domestic use | Ksh. 2,000,000.00 | 2023-06-01 | 2023-06-30 | Planned |
Ward | Repair and maintenance of boreholes (NB: BUDGETED UNDER PUBLIC WORKS BY MISTAKE) | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,000,000.00 | 2023-07-05 | 2023-10-31 | Planned |
Ward | Repair and installation of solar pumping system and pipe extension at Lukolis model health centre | To ensure that clean water is supplied for industrial and domestic use | Ksh. 600,000.00 | 2023-07-05 | 2023-10-31 | Planned |
Ward | Supply and installation of 10,000 litres cubic water tank and pipe extension at paratere | To ensure that clean water is supplied for industrial and domestic use | Ksh. 300,000.00 | 2023-06-01 | 2023-06-30 | Planned |
Ward | Repair and maintenance of water points and pipeline extension ward wide | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,000,000.00 | 2023-07-01 | 2023-10-31 | Planned |
Ward | Repair and maintenance of water pump and solar powered system at Mufumu ECDE | To ensure that clean water is supplied for industrial and domestic use | Ksh. 3,000,000.00 | 2023-06-01 | 2023-06-30 | Planned |
County | Pipeline extension-Magombe pipeline- Bunyala | To ensure that clean water is supplied for industrial and domestic use | Ksh. 3,000,000.00 | 2023-07-05 | 2023-11-15 | Planned |
County | Pipeline extension across the County (Malaba) | To ensure that clean water is supplied for industrial and domestic use | Ksh. 3,000,000.00 | 2023-07-05 | 2023-11-01 | Planned |
County | Installation of hybrid pumping system at Port Victoria | To increase access to Clean and safe water | Ksh. 4,900,000.00 | 2023-07-01 | 2023-11-01 | Planned |
County | Drilling and pipe extension at Angurai | To increase access to clean and safe water | Ksh. 2,400,000.00 | 2023-07-05 | 2023-11-15 | Planned |
County | Repair and maintenance of Kakalet (Bishop Kitwii) borehole | To increase access to clean and safe water | Ksh. 600,000.00 | 2023-06-01 | 2023-06-30 | Planned |
County | Installation of solar powered borehole at Bunadi | To increase clean and safe water | Ksh. 2,000,000.00 | 2023-06-01 | 2023-06-30 | Planned |
County | Installation of solar pump and water tank at Dakhiro | To increase access to clean and safe water | Ksh. 1,500,000.00 | 2023-06-01 | 2023-06-30 | Planned |
County | Drilling of borehole and installation of pump at Rarak | To increase access to clean and safe water | Ksh. 1,500,000.00 | 2023-06-01 | 2023-06-30 | Planned |
County | Maintenance of Bulemia water scheme | To increase access to clean and safe water | Ksh. 500,000.00 | 2023-07-03 | 2023-10-30 | Planned |
County | Maintenance of Moding Water scheme | To ensure that clean water is supplied for industrial and domestic use | Ksh. 1,800,000.00 | 2023-08-01 | 2023-11-30 | Planned |
Ward | Constructio n of Kisoko dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 3,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Renovation, Fencing and Constructio n of a gate at Luliba dispensry | To reduce the burden of disease, injuries and mortality | Ksh. 700,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Equiping and rehabilitatio n of Busibula dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,400,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Purchase of Furniture and Beds for Mafumbu dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Renovation and Installation of Electricity at Mafumbu Dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,300,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | completiojn of laboratory for Ochude dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Purchase of Van for Chakol South Ward | To reduce the burden of disease, injuries and mortality | Ksh. 8,050,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Constructio n and extension of maternity wing at Ngelechom dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Completion of maternity wing at Moru Karisa dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Sub County | Routine maintenance of Amerikwai - Bugengi road | improve standards of roads | Ksh. 3,300,000.00 | 2020-07-14 | 2021-06-23 | Completed |
County | Routine maintenance of E 9025 Junction - Angorom Kemodo | improve the standards of roads | Ksh. 4,700,000.00 | 2020-07-16 | 2021-06-17 | Completed |
County | Routine maintenance of Akoreet - Odioi road | improve the standards of roads | Ksh. 12,046,900.00 | 2020-07-16 | 2021-06-29 | Completed |
County | Routine maintenace of Kolanya - Ongaroi - Kawalun road | improve standards of roads | Ksh. 8,355,200.00 | 2020-07-15 | 2021-06-30 | Completed |
County | Routine maintenance of Akites catholic church mabwoni road | improve road standards | Ksh. 3,715,310.00 | 2020-07-16 | 2021-06-16 | Completed |
County | Routine Maintennace of Rumbiye - Namunduru Rwambiye road | improve road standards | Ksh. 4,472,060.00 | 2020-07-22 | 2021-12-14 | Completed |
County | Routine maintenance of Obet - C778 Junction - Nanderema - Mumbaka road | improve road network | Ksh. 4,977,280.00 | 2020-07-15 | 2021-06-28 | Completed |
Sub County | Routine maintenance of C778 Junction - Nambuku road | improve road network | Ksh. 4,738,710.00 | 2020-07-08 | 2021-06-29 | Completed |
County | Routine maintenance of C778 Junction Funyula Adul Road | improve the standards of roads | Ksh. 5,400,530.00 | 2020-07-23 | 2021-06-24 | Completed |
County | Routine maintenance of Rapondo road | improve road network | Ksh. 4,136,560.00 | 2020-07-15 | 2020-07-30 | Completed |
County | Routine maintenance of Bwohola - Rudacho | improve road network | Ksh. 4,222,300.00 | 2020-07-09 | 2021-06-25 | Completed |
County | Routine maintenance of mukhobola - Bubamba road | improve road network | Ksh. 5,530,000.00 | 2020-07-09 | 2021-06-23 | Completed |
County | Routine maintenannce of osieko - Nyapala road | improve road network | Ksh. 4,011,340.00 | 2020-07-08 | 2021-06-22 | Completed |
County | Routine maintennace of Nambuka - Busia TTC - Esikulu primary | improve road network | Ksh. 4,100,070.00 | 2020-07-15 | 2021-06-23 | Completed |
County | Routine maintenance of Mayenje - Bwamani - Bulanda junction | improve the standards of roads | Ksh. 4,442,560.00 | 2020-07-08 | 2021-06-09 | Completed |
County | Routine maintenance owabf Busibwabo catholic - Siekunya - Nambale boys road | improve road network | Ksh. 5,705,060.00 | 2020-07-20 | 2021-06-30 | Completed |
County | Routine maintenance of Masende bale - Siunga road | improve road network | Ksh. 4,706,420.00 | 2020-07-23 | 2021-06-09 | Completed |
County | Routine maintenance of Esikura primary - Elara road | improve road network | Ksh. 2,988,000.00 | 2020-07-07 | 2021-06-23 | Completed |
Sub County | Routine maintenance Bujumba - Khwikale | improve the standards of roads | Ksh. 2,800,000.00 | 2020-07-15 | 2021-06-15 | Completed |
Sub County | Routine maintenance of Bukhalalire - Murumba road | improve road standards | Ksh. 4,310,720.00 | 2020-07-16 | 2021-07-15 | Completed |
Sub County | Routine maintenance of Bumala B Junction - Nambusu River - Esikura primary junction road | improve the standards of roads | Ksh. 7,710,800.00 | 2020-07-21 | 2021-06-24 | Completed |
County | Routine maintenance of Zakayo - Ikonzo- Namwitsula | increase the number of kilometres of roads maintained | Ksh. 4,800,000.00 | 2020-07-07 | 2021-06-24 | Completed |
County | Routine maintenance Manyoli Adult - Eductaion centre - Mairs Dip | improve road network | Ksh. 4,600,000.00 | 2020-07-07 | 2021-06-16 | Completed |
County | Routine maintenance of Madibo primary khulwanda primary - Madibo ADC Road | improve road network | Ksh. 5,000,000.00 | 2020-07-08 | 2021-06-15 | Completed |
Sub County | Routine maintenance of Lugiri - Kalundeka - Benga road | improve road network | Ksh. 5,000,000.00 | 2020-07-08 | 2021-06-17 | Completed |
County | Routine maintenance of Landi mawe Junction - Maduwa Junction | improve road network | Ksh. 4,200,000.00 | 2020-07-02 | 2021-06-22 | Completed |
County | Routine maintenance of Nags Academy - osogoro- Amerikek - Deo Road | improve road network | Ksh. 3,600,000.00 | 2020-07-16 | 2021-06-16 | Completed |
County | Routine maintenance and spot onyandare - Angonget - oburikode prime Road | improve road network | Ksh. 7,000,000.00 | 2020-07-08 | 2021-06-23 | Completed |
County | Routine maintenance and spot improvement of Angorom Hostel - Alupe Hospital -Alupe University | improve road network | Ksh. 3,200,000.00 | 2020-07-02 | 2021-06-22 | Completed |
County | Routine maintenance and spot improvement of Machakus Bridge- Totokakile Road | improve road network | Ksh. 4,000,000.00 | 2020-07-08 | 2021-06-01 | Completed |
County | Routine maintenance and spot improvement of Angorom- Otimong road | improve standards of roads | Ksh. 5,500,000.00 | 2020-07-02 | 2021-06-16 | Completed |
Ward | Completion of administration block at Busibwabo dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | construction of water tank at Nasira dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 700,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Purchase of equipment for Burumba dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,600,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Renovation of Muduwa dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Renovation of Sisenye dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 2,600,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Purchase of 3 desktop computers for Lupida health centre, igara and Musokot o dispensa ry fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 300,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | construction of 4 door pit latrine at Akolong dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | construction of staff quarters at Akichelesit dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | fencing and putting up gate at Akolong dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Fencing, toilets and painting of Kapesur dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 1,500,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Fencing of Aloet the dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 600,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Renovation and fencing of facility of Okwata dispensary fy 2019/20 | To reduce the burden of disease, injuries and mortality | Ksh. 800,000.00 | 2019-07-01 | 2020-06-30 | Planned |
Ward | Fencing of Nangina dispensary FY 16/17 | To reduce the burden of disease, injuries and mortality | Ksh. 400,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | construction of new maternity in Nambuku dispensary maternity wing FY 2017/18 | To reduce the burden of disease, injuries and mortality | Ksh. 3,550,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | nstallation of power at Segero dispensary FY 2017/18 | To reduce the burden of disease, injuries and mortality | Ksh. 600,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction and equiping of a modern clinic at Bumala and Busibula dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 4,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion of maternity block Sikaarira dispensary FY 2016/17 | To reduce the burden of disease, injuries and mortality | Ksh. 1,200,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Lab construction Bumala B health Centre FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion of martenity wing Bukhalalire dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 1,500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of pit latrines at Igula dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 300,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | construction of Kengatuny dispensary phase I | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | - Completion of Kiriko dispensary @ 3,000,000.Wi ring of Kamolo Dispensary @500,000 FY 14/15 | To reduce the burden of disease, injuries and mortality | Ksh. 3,500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of maternity wing at Kamuriai dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 1,500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | completion of laboratory at Ochude dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of Pit latrine and Electrificatio n of Amongura dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 800,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of maternity wing at Busembe clinic FY 2016/17 | To reduce the burden of disease, injuries and mortality | Ksh. 1,726,670.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion of Maternity Wing at Nasira Dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,300,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion of maternity wing at Nasira dispensary FY 2017/18 | To reduce the burden of disease, injuries and mortality | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of Administrati on block at Busibwabo dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of septic tank and plumbing at Burumba dispensary maternity wing at Burumba dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 1,500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Provision of Electricity, Shallow Well, Pit Latrine, Septic Tank, Gate house and Renovation of Hospital at Busagwa Dispensary FY 14/15- | To reduce the burden of disease, injuries and mortality | Ksh. 3,300,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Purchase of medical equipment for Munongo dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Purchase of medical supplies for Khayo, Madede, Buyofu and Mondebu dispensaries | To reduce the burden of disease, injuries and mortality | Ksh. 4,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | completion of maternity wing at Khayo dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 3,662,340.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of maternity wing at lwanyange dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion works at Sidende dispensary FY 16/17 | To reduce the burden of disease, injuries and mortality | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion of Buildings at Bukadanyi dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of Aboloi dispensary FY 16/17 | To reduce the burden of disease, injuries and mortality | Ksh. 2,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion of Akolong dispensary FY 16/17 | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of maternity wing at Aboloi dispensary FY 2015/16 | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Proposed construction of maternity wing and anti-jigger campaign at Moding Health Centre, Kapesur Dispensary FY 14/15 | To reduce the burden of disease, injuries and mortality | Ksh. 2,576,890.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of X ray room and laboratory at Lukolis Health Centre FY 16/17 | To reduce the burden of disease, injuries and mortality | Ksh. 1,200,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of Mauko child protection center | To Ensure There is Proper Child Care and Protection in the County | Ksh. 5,000,000.00 | 2018-07-05 | 2022-06-30 | Stalled |
County | Construction of Mauko child protection centre | To Ensure There is Proper Child Care and Protection in the County | Ksh. 5,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Routine maintenance and spot improvement of papa junction - ST James Kwang'amuru- kotur road | improve road network | Ksh. 7,400,000.00 | 2020-07-08 | 2021-06-17 | Completed |
County | Routine maintenance and spot improvement of Adingosi -obekai-segero | improve road network | Ksh. 8,000,000.00 | 2020-07-01 | 2021-07-15 | Completed |
Sub County | ROUTINE MTCE OF B13 JUNCTION ADUNGOSI - E9025 OJAAMONG ROAD | improve road networks | Ksh. 9,000,000.00 | 2020-07-16 | 2021-06-16 | Completed |
Ward | sports promotion | create an enabling environment for development and management of sports and recreational activities | Ksh. 2,000,000.00 | 2020-07-01 | 2022-06-30 | Completed |
Sub County | Routine Maintenance & spot improvement oflot 2 roads Teso South sub county: Amukura, Opejo,Chakol Palama PapaAruro, Airstrip Highrock Apegei Orijai, Akilisit, Kidera Kwangamor | improve standards of roads | Ksh. 30,000,000.00 | 2020-07-08 | 2021-06-24 | Completed |
Ward | sports promotion | create an enabling environment for development and management of sports and recreational activities | Ksh. 2,000,000.00 | 2020-07-01 | 2022-06-30 | Ongoing |
Ward | sports promotion | Create an enabling environment for development and management of sports and recreational activities | Ksh. 4,800,000.00 | 2020-07-01 | 2022-06-30 | Ongoing |
Sub County | Routine Maintenance & spot improvement of lot 7 roads Port Victoria sub county: Bunge Omena Beach Mudembi Sibuka, Nandikinya Namusaja | improve road network | Ksh. 21,600,000.00 | 2020-07-16 | 2021-06-02 | Completed |
Sub County | Routine Maintenance & spot improvement of lot 4 Roads Butula sub county; Bujuranga Sikoma, Dadira Kingadole, Bandari usire,Makeuipi Ogonda, Elugulu Sikura, Liyala mshabiri workgroup Simokola | improve road network | Ksh. 30,000,000.00 | 2020-07-08 | 2021-06-09 | Completed |
County | Routine Maintenance & spot improvement of lot 5 roads matayos sub county: Burumba Ebenezer, Kwa store Munongo, Nanko Siteko, Indiba Rakite Salim | increase number of kilometres of graveled roads | Ksh. 25,000,000.00 | 2020-07-15 | 2021-06-16 | Completed |
County | Construction of ECDE Classrooms | Improvement of infrastructure in ECDE centers | Ksh. 11,302,000.00 | 2021-07-04 | 2022-03-31 | Ongoing |
Sub County | Construction of ECDE Classrooms at Mundaya, Kabwodo and Busembe primary schools | Improvement of infrastructure in ECDE centers | Ksh. 2,550,000.00 | 2021-07-04 | 2022-03-30 | Ongoing |
Sub County | Construction of ECDE Classrooms at Busabakwa, Busidibu, Buyama and Busende primary schools | Improvement of infrastructure in ECDE centers | Ksh. 4,350,000.00 | 2021-07-04 | 2022-03-31 | Ongoing |
County | Construction of Siwongo market | Construction of modern markets | Ksh. 4,400,000.00 | 2019-03-01 | 2020-10-16 | Completed |
County | Construction of market stalls at Angorom market | Construction of modern markets | Ksh. 1,500,000.00 | 2019-03-01 | 2020-03-12 | Completed |
County | Market sheds at Rumbiye | Construction of modern markets | Ksh. 4,000,000.00 | 2019-06-07 | 2020-03-04 | Ongoing |
County | 4 door Malanga market toilets | Construction of modern markets | Ksh. 800,000.00 | 2014-03-07 | 2015-03-12 | Completed |
County | Construction of bodaboda shed at Katakwa, Aboloi and Kakapel market | construction of modern markets | Ksh. 284,390.00 | 2017-03-02 | 2018-03-09 | Completed |
Sub County | Construction of ECDE Classrooms at Simuli, Mung'abo, Masendebale, Isongo and Buduma Primary schools | Improvement of infrastructure in ECDE centers | Ksh. 4,950,000.00 | 2021-07-04 | 2022-03-30 | Ongoing |
Sub County | Construction of ECDE Classrooms at Nyalwanda, Butunyi, Kingadole, Buriya, Bukwaku and lunyuko primary schools | Improvement of infrastructure in ECDE centers | Ksh. 7,050,000.00 | 2021-07-01 | 2022-03-30 | Ongoing |
Sub County | Constructions of ECDE Classrooms at Mwangaza, Musokoto,Namis, Buyofu and Kajoro primary school at Nambale sub-county. | Improvement of infrastructure in ECDE centers | Ksh. 5,600,000.00 | 2021-07-04 | 2022-03-30 | Ongoing |
County | Construction of toilet in Angurai market | Construction of modern markets | Ksh. 4,000,000.00 | 2017-03-22 | 2018-03-22 | Completed |
County | Routine maintenance and spot improvement of Angorom- Otimong road | increase number of kilometres of roads with gravel | Ksh. 5,600,000.00 | 2020-07-09 | 2021-06-15 | Completed |
County | Completion of market shed at Bukhalalire market | Construction of Modern Markets | Ksh. 1,500,000.00 | 2019-03-07 | 2021-03-04 | Ongoing |
County | Construction of market shade Mulukoba market | Construction of Modern Markets | Ksh. 500,000.00 | 2019-03-05 | 2021-03-10 | Completed |
County | Routine maintenance and spot improvement of papa junction - ST James Kwang'amuru- kotur road | improve roads | Ksh. 7,400,000.00 | 2020-07-02 | 2021-06-02 | Completed |
County | Construction of Toilets at Mau Mau market | construction of modern markets | Ksh. 2,000,000.00 | 2020-03-11 | 2022-03-09 | Ongoing |
County | Construction of market at Muramba | construction of modern markets | Ksh. 4,000,000.00 | 2019-03-05 | 2022-03-09 | Ongoing |
Ward | sports promotion | create an enabling environment for development and management of sports and recreational activities | Ksh. 1,000,000.00 | 2020-07-01 | 2022-06-30 | Ongoing |
County | Routine Maintenance & spot improvement of lot 6 roads Samia sub county: Bukiri,Mumbaka,Funyula,Nerobia Kamoti Malanga Sio Port Busijo | improve and maintain roads | Ksh. 22,000,000.00 | 2020-07-09 | 2021-06-10 | Completed |
County | Routine Maintenance & spot improvement of lot 4 Roads Butula sub county; Bujuranga Sikoma, Dadira Kingadole, Bandari usire,Makeuipi Ogonda, Elugulu Sikura, Liyala mshabiri workgroup Simokola | improve standards of roads | Ksh. 30,000,000.00 | 2020-07-07 | 2021-06-24 | Completed |
County | Routine Maintenance & spot improvement of lot 3 Roads Nambale Sub County: Emukhuuuyu Namakokhu Kapina Opedur | improve the standards of roads | Ksh. 11,000,000.00 | 2020-07-02 | 2021-06-16 | Completed |
County | Routine Maintenance & spot improvement of lot 1 roads Teso North Sub County:Changara-ajesmut Kolanya Aboloi, Osere Kaejo Kekelet, Amigos Kooli, Kasigulis Isaac Omusulo Akulunyi Orapidi Koruru MG | increase the number of roads maintained | Ksh. 30,000,000.00 | 2021-07-08 | 2021-07-08 | Completed |
County | UPGRADING TO BITUMEN STANDARDS LOT 3 AMERIKWAI AIRSTRIP & MATAYOS HEALTH CENTRE | improve the standards of roads | Ksh. 70,000,000.00 | 2020-07-09 | 2021-06-07 | Completed |
County | Upgrading of - Rasto park - Scorpion Chemist Road; Garage and Rowcena streets to bitumen standards | improve standards of roads | Ksh. 30,000,000.00 | 2020-07-09 | 2021-07-21 | Completed |
County | Upgrading of lot 2: Amagoro primary-Aleles - Eden rock and Adungosi mkt access road to bitumen standards | improve standards of roads | Ksh. 90,000,000.00 | 2021-07-08 | 2022-06-09 | Completed |
County | Upgrading of Lot 1 funyala town CBD roads and Bumala market back street roads to bitumen standards | improve the standards of roads | Ksh. 60,000,000.00 | 2020-07-14 | 2021-06-16 | Completed |
County | Construction of Aturet- amukura box culvert | improve storm water infrastructure | Ksh. 15,000,000.00 | 2020-07-17 | 2021-06-09 | Completed |
Ward | Completion of Akiriamas dispensary fy 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Finishing and Operationalization of Aturet Dispensary FY 2017/18 | To reduce the burden of disease, injuries and mortality | Ksh. 800,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Constructio n of the pit latrine at Kotur dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion of Kotur Dispensary FY 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 800,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Completion of Apokor dispensary | To reduce the burden of disease, injuries and mortality | Ksh. 2,500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Equipping of Odengero dispensary fy 2018/19 | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Block extension phase 2 at Rumbiye dispensary fy 2016/17 project | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Ongoing |
Ward | Construction of modern public toilet at Luchululo and Odiado fy 2015/16 project | To reduce the burden of disease, injuries and mortality | Ksh. 599,000.00 | 2019-07-01 | 2020-06-30 | Completed |
Ward | Completion and equipping of Akobwait dispensary fy 2016/17 project | To reduce the burden of disease, injuries and mortality | Ksh. 994,980.00 | 2019-07-01 | 2020-06-30 | Completed |
Ward | Construction of Pit latrine at Aloete dispensary fy 2015l16 project | To reduce the burden of disease, injuries and mortality | Ksh. 299,980.00 | 2019-07-01 | 2020-06-30 | Completed |
County | World Bank Loan for Transforming Universal Health Care System | To reduce the burden of disease, injuries and mortality | Ksh. 142,994,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | DANIDA | To reduce the burden of disease, injuries and mortality | Ksh. 17,812,500.00 | 2019-07-01 | 2020-06-30 | Planned |
County | Nutrition services | To reduce the burden of disease, injuries and mortality | Ksh. 1,300,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | TB Control | To reduce the burden of disease, injuries and mortality | Ksh. 1,740,730.00 | 2019-07-01 | 2020-06-30 | Planned |
County | Malaria Control | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | HIV/AIDS Control | To reduce the burden of disease, injuries and mortality | Ksh. 500,000.00 | 2019-07-01 | 2020-06-30 | Planned |
County | Purchase of immunization and EPI Equipment | To reduce the burden of disease, injuries and mortality | Ksh. 2,167,020.00 | 2019-07-01 | 2020-06-30 | Planned |
County | Acquisition of Diagnostic Laboratory Equipment for H/Cs | To reduce the burden of disease, injuries and mortality | Ksh. 4,200,000.00 | 2019-07-01 | 2020-06-30 | Completed |
County | Construction of Incinerators at Akiriamas, Kamuriai, Neela, Kabuodo,Khajula,Segero, Mayenje and kwangomor | To reduce the burden of disease injuries and mortality | Ksh. 7,772,410.00 | 2019-07-01 | 2020-06-30 | Ongoing |
County | Major maintenance of County government houses and offices | Adequate, affordable and quality houses and buildings for county residents. | Ksh. 5,000,000.00 | 2020-07-01 | 2021-06-30 | Ongoing |
Ward | Nurturing Talents and Sporting activities | Promotion and Development of Sports | Ksh. 4,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Sporting activities | Promotion and Development of Sports | Ksh. 2,000,000.00 | 2020-07-01 | 2022-06-30 | Completed |
Ward | purchase of land for ward offices | to have sustainable land use within the county | Ksh. 2,200,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for investment | to have sustainable land use within the county | Ksh. 2,000,000.00 | 2020-07-01 | 2021-06-30 | Ongoing |
Ward | purchase of land for okoa market | to have sustainable land use within the county | Ksh. 1,500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for ongaroi water pan | to have sustainable land use within the county | Ksh. 1,500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for sikarira milk park | to have sustainable land use within the county | Ksh. 1,200,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for simuli sec school | to have sustainable land use within the county | Ksh. 1,200,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for shibale market | to have sustainable land use within the county | Ksh. 1,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for Akulonyi and Amoni Kojulo | to have sustainable land use within the county | Ksh. 1,000,000.00 | 2020-07-01 | 2021-06-30 | Ongoing |
Ward | purchase of land for Nasira dispensary | to have sustainable land use within the county | Ksh. 1,000,000.00 | 2020-07-01 | 2021-06-30 | Ongoing |
Ward | purchase of land for dadira open air market | to have sustainable land use within the county | Ksh. 800,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for khayo secondary school | to have sustainable land use within the county | Ksh. 800,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Equipping of youth stadium | To promote, Coordinate and Enhance Youth Participation in Development Initiatives | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for Madibira water project | to have sustainable land use within the county | Ksh. 600,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for Manyole road passage | to have sustainable land use within the county | Ksh. 600,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for Elukhari dispensary | to have sustainable land use within the county | Ksh. 600,000.00 | 2020-07-01 | 2021-06-30 | Completed |
County | Equipment and operationalization of youth Empowerment centre | To promote, Coordinate and Enhance Youth Participation in Development Initiatives | Ksh. 5,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for Bujwanga market | to have sustainable land use within the county | Ksh. 600,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for Agogom polytechnic | to have sustainable land use within the county | Ksh. 600,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for Wakhungu water project | to have sustainable land use within the county | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | purchase of land for Totokakile dispensary | To have sustainable land use within the county | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Ongoing |
Ward | purchase of land for Clinic market centre | to have sustainable land use within the county | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
County | purchase of land for Lwanyange dispensary | to have sustainable land use within the county | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
County | purchase of land for promotion of dairy park | To have sustainable land use within the county | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Ongoing |
Sub County | Construction of ECDE Classrooms at Alupe, Ochude, Okiporo and Obekai primary schools at Chakol North and Angorom | Improvement of infrastructure in ECDE center | Ksh. 3,550,000.00 | 2021-07-01 | 2022-03-29 | Ongoing |
County | purchase of land for Kajoro market | To have sustainable land use within the county | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
County | purchase of land for Mulwanda market and Funyula water tower | To have sustainable land use within the county | Ksh. 800,000.00 | 2020-07-01 | 2021-06-30 | Terminated |
County | purchase of land for Burinda dispensary | To have sustainable land use within the county | Ksh. 1,000,000.00 | 2020-07-01 | 2021-06-30 | Terminated |
County | Construction of Major drainage (Bridges and Box Culverts)at sidokho | improve road network | Ksh. 15,000,000.00 | 2021-07-15 | 2022-06-22 | Completed |
County | purchase of land for kajei B and acunet primary | To have sustainable land use within the county | Ksh. 3,000,000.00 | 2020-07-01 | 2021-06-30 | Terminated |
County | purchase of land for construction of Esibembe market | To have sustainable land use within the county | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
County | CONSTRUCTION OF BRIDGE AT BUSIBWABO | establish storm water infrastracture | Ksh. 14,000,000.00 | 2020-07-14 | 2022-06-14 | Completed |
County | purchase of land for akites market | To have sustainable land use within the county | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Planned |
County | purchase of land for Khung´ungu dispensary | To have sustainable land use within the county | Ksh. 2,000,000.00 | 2020-07-01 | 2021-06-30 | Terminated |
County | purchase of land for akibui borehole | To have sustainable land use within the county | Ksh. 300,000.00 | 2020-07-01 | 2021-06-30 | Terminated |
County | INSTALLATION OF CULVERT AT EKISEGERE | establish storm water infrastructure | Ksh. 1,000,000.00 | 2021-07-01 | 2021-07-19 | Completed |
County | purchase of assistive devices for PWDs | To Self-Sustain Older Persons and PWD’S and Allow them Participate in Economic Development | Ksh. 3,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Installation of box culvert at Ikapolok-Okuleu road and Okelo-Okwara roads | establish storm water infrastructure | Ksh. 1,000,000.00 | 2020-07-20 | 2022-06-08 | Completed |
County | Installation of box culverts at Kamello | establish storm water infrastructure | Ksh. 2,000,000.00 | 2021-07-13 | 2021-07-28 | Completed |
County | Construction of Narera-Osogo road | improve the standards of roads | Ksh. 4,000,000.00 | 2020-07-09 | 2022-06-07 | Completed |
County | Empowerment of women and people with disabilities | To Self-Sustain Older Persons and PWD’S and Allow them Participate in Economic Development | Ksh. 5,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Construction of Opare-Onyunyur,Kamolo box culvert | establish storm water infrastructure | Ksh. 6,000,000.00 | 2020-07-13 | 2021-06-16 | Completed |
County | medical insurance for the elderly | To Self-Sustain Older Persons and PWD’S and Allow them Participate in Economic Development | Ksh. 7,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Construction of Namasalire work group bridge | establish storm water infrastructure | Ksh. 2,500,000.00 | 2020-05-12 | 2020-05-12 | Completed |
County | Construction of Agoromit box culvert, Kauko Toit-Agonget box culvert | establish storm water infrastructure | Ksh. 4,500,000.00 | 2020-07-09 | 2022-06-30 | Completed |
County | Construction of Okelo-Okwaro road bridge | establish storm water | Ksh. 5,000,000.00 | 2021-07-06 | 2021-07-26 | Completed |
County | Construction of Kamusogon-Igara box culvert | establish storm water infrastructure | Ksh. 4,500,000.00 | 2020-07-20 | 2021-06-08 | Completed |
County | Construction of Madende Kaludeka box culvert | Ksh. 5,000,000.00 | 2020-07-14 | 2022-06-07 | Completed | |
County | Construction of Mama Amuchere Olwa box culvert | Ksh. 4,000,000.00 | 2021-07-08 | 2022-06-09 | Completed | |
County | Construction of Kabuodho and Kanoti road bridges,Bumarere-Hakati-Buyukha-Nahairira | Ksh. 5,000,000.00 | 2021-07-07 | 2022-06-01 | Completed | |
County | Promotion of tourism activities across the county | Promotion and Development of Local Tourism in the County | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Completed |
Sub County | Construction of. ECDE Classrooms at Akobwait,Kosera, St Joseph and Katelenyang primary school at Amukura East and Amukura Central | Improvement of infrastructure in ECDE center | Ksh. 3,700,000.00 | 2021-07-04 | 2022-06-30 | Ongoing |
Ward | tournament events | To develop, promote and preserve cultural heritage in the county | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Completed |
Sub County | Construction of ECDE Classrooms at Kengatuny and Adurkoit primary school, Kagutio primary school at Malaba South and Angurai North ward | Improvement of infrastructure in ECDE center | Ksh. 3,950,000.00 | 2021-07-04 | 2022-06-30 | Ongoing |
County | development of community empowerment center | To develop, promote and preserve cultural heritage n the county | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Completion of Kakapel cultural Centre | To develop, promote and preserve cultural heritage in the county | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Completed |
Ward | Construction of ECD Classrooms at Akobwait,Kisombe and Katelenyang primary school | Improvement of infrastructure in ECDE center | Ksh. 4,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Mechanical Work and Refurbishment of Ngelechom Dispensary | To reduce the burden of disease injuries and mortality | Ksh. 1,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Construction of Septic Tank and Plumbing at Burumba Dispensary | To reduce the burden of disease injuries and mortality | Ksh. 1,500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Proposed Renovation of Khajula Dispensary | To reduce the burden of disease injuries and mortality | Ksh. 1,000,800.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Renovation Works at Sisenye Dispensary | To reduce the burden of disease injuries and mortality | Ksh. 2,598,950.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Construction of General Ward at Budalangi Dispensary | To reduce the burden of disease injuries and mortality | Ksh. 2,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Proposed Construction of Maternity Wing at Busagwa Dispensary Phase 1 | To reduce the burden of disease injuries and mortality | Ksh. 3,500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Proposed Construction of Kapesur Dispensary Phase II | To reduce the burden of disease injuries and mortality | Ksh. 2,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Proposed erection and completion of septic tank and soak pit at Angurai health centre | To reduce the burden of disease injuries and mortality | Ksh. 1,500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Supply and Delivery of Medical Equipment at Okwata a Dispensary | To reduce the burden of disease injuries and mortality | Ksh. 1,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Construction of Laboratory at Akiriamas Dispensary | To reduce the burden of disease injuries and mortality | Ksh. 3,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Proposed Erection and Completion of 4 No. Door Pit Latrine at Amukura Health Centre | To reduce the burden of disease injuries and mortality | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Construction of Incinerator at obekai Dispensary | To reduce the burden of disease injuries and mortality | Ksh. 1,500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
County | Construction of Angurai box culvert | Ksh. 9,000,000.00 | 2020-07-02 | 2021-05-03 | Completed | |
County | Construction of Mabinzu Malomba culvert | control storm water | Ksh. 1,200,000.00 | 2020-07-14 | 2021-06-30 | Completed |
County | Construction of Maolo-Makema box culvert and associated works | Ksh. 2,273,020.00 | 2020-07-08 | 2021-07-15 | Completed | |
County | Construction of Kamolo cattle dip Opare pri school culverts | control storms on roads | Ksh. 1,210,460.00 | 2020-07-09 | 2021-06-24 | Completed |
County | Construction of Kiriko box culvert | Ksh. 5,000,000.00 | 2020-07-04 | 2021-07-14 | Completed | |
County | Upgrading of –Rasto park –Scorpion Chemist Road,Garage and Rowcena streets to bitumen standars | Ksh. 28,690,700.00 | 2019-08-07 | 2020-03-11 | Completed | |
Ward | Purchase of medical equipment for Kabwodo dispensary | To reduce the burden of diseases injuries and mortality | Ksh. 200,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Construction of the pit latrine at Kotur dispensary FY 2018/19 project | To reduce the burden of diseases injuries and mortality | Ksh. 500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Purchase of medical equipment for Moding and Angurai Health Centres | To reduce the burden of disease, injuries and mortality | Ksh. 1,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Equipping of Wakhungu dispensary FY 2018/19 | To reduce the burden of disease injuries and mortality | Ksh. 1,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Construction of maternity wing at Kamuriai dispensary FY 2018/19 project | To reduce the burden of disease injuries and mortality | Ksh. 1,500,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Construction of Aboloi dispensary FY 16/17 project | To reduce the burden of disease, injuries and mortality | Ksh. 2,000,000.00 | 2020-07-01 | 2021-06-30 | Completed |
Ward | Completion of maternity wing at Khayo dispensary FY 2018/19 project | To reduce the burden of disease, Injuries and mortality | Ksh. 2,662,340.00 | 2020-07-01 | 2021-06-30 | Completed |
County | Fish Cage enterprise | Establishment of aquaculture parks | Ksh. 6,000,000.00 | 2018-09-19 | Completed | |
Ward | Construction of Akichelesit ECDE classrooms | Improve infrastructure in ECDE Centres | Ksh. 800,000.00 | 2020-10-04 | 2021-06-30 | Completed |
Ward | Erection and Completion of ECDE classrooms at Mabunge primary in Nambale Sub-county | Improve infrastructure in ECDE Centres | Ksh. 393,571.00 | 2020-10-04 | 2021-06-30 | Completed |
Ward | Construction of ECDE classrooms at Busagwa primary in Bunyala sub-county | Improve infrastructure in ECDE Centres | Ksh. 716,000.00 | 2020-10-04 | 2021-06-30 | Completed |
County | Mulukhoni Market Construction | Ksh. 4,000,000.00 | 2018-07-17 | 2019-06-05 | Completed | |
County | Soko Posta Renovation | Construction of modern markets | Ksh. 4,000,000.00 | 2018-07-17 | 2019-06-05 | Completed |
Flagship | Fish Eatery Point | Increase Quantities of Fish and Fish Products in the County | Ksh. 8,000,000.00 | 2020-08-18 | Ongoing | |
County | upgrading of Lot2: Amagoro primary, Aleles-edenrock, Adungosi mkt road | put in place bitumen roads | Ksh. 81,477,000.00 | 2020-07-07 | 2021-06-30 | Completed |
County | Refurbishment of Busia stadium and purchase of sports equipment | favorable environment for development of sports and recreational activities | Ksh. 5,000,000.00 | 2020-06-01 | 2021-07-01 | Completed |
County | upgrading of lot1: Funyula CBD town roads and Bumala market backstreet road to bitumen standards | put in place bitumen roads | Ksh. 58,362,900.00 | 2020-01-07 | 2021-10-08 | Completed |
Ward | support sporting activities | favorable environment for development of sports and recreational activities | Ksh. 1,100,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | support sporting activities | favorable environment for development of sports and recreational activities | Ksh. 2,500,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
Ward | support of sporting activity | favorable environment for development of sports and recreational activities | Ksh. 1,300,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | support sporting activities | favorable environment for development of sports and recreational activities | Ksh. 1,000,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
Ward | Purchase of sports items | favorable environment for development of sports and recreational activities | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | supply of sports equipment | favorable environment for development of sports and recreational activities | Ksh. 1,500,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | supply of sports equipment | favorable environment for development of sports and recreational activities | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | support to sporting activities | favorable environment for development of sports and recreational activities | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | purchase of sports equipment | favorable environment for development of sports and recreational activities | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | sports activities | favorable environment for development of sports and recreational activities | Ksh. 700,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | support of sporting activities | favorable environment for development of sports and recreational activities | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Completed |
Ward | sports items /utilities | favorable environment for development of sports and recreational activities | Ksh. 1,500,000.00 | 2021-07-05 | 2022-06-30 | Ongoing |
Ward | Erection of two door pit latrine at Busibwabo market | to have sustainable land use within the county | Ksh. 400,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | proposed construction to completion of 32 no. stalls market shed at Busembe clinic centre I Bwiri ward | to have sustainable land use within the county | Ksh. 4,000,000.00 | 2021-07-01 | 2022-06-30 | Completed |
Ward | Proposed fencing of Musoma and Kingandole market | to have sustainable land use within the county | Ksh. 700,000.00 | 2021-07-01 | 2022-06-30 | Completed |
County | purchase of land for Teso South cultural centre | to have sustainable land use within the county | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Completed |
Ward | purchase of land for St. Thomas Mayenje Secondary school | to have sustainable development within the county | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land at Akulonyi for PLWDs, Amoni primary, Kiriko market, Opaare primary, Ojilo primary school, Totokakile dispensary, Onyunyur polytechnic, Osopotoit primary and Okou primary | to have sustainable land use within the county | Ksh. 4,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for Burumba Dispensary | to have sustainable land use within the county | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for Bulemia water project | to have sustainable land use within the county | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Completed |
Ward | Payment of land for Khusuna ECD class | to have sustainable land use within the county | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for Kapesur dispensary | to have sustainable land use within the county | Ksh. 400,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for Atababur Health Centre | to have sustainable land use within the county | Ksh. 400,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for Kajoro Dispensary | to have sustainable land use within the county | Ksh. 850,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for for Buduma dairy park and Sirobo ECD | to have sustainable land use within the county | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for extension of Nasira and Bumakunda dispensary | to have sustainable land use within the county | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Purchase of land for investment | To have sustainable land use within the County | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for apokor market | to have sustainable land use within the county | Ksh. 400,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for changara market | to have sustainable land use within the county | Ksh. 400,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of land for apokor secondary school | to have sustainable land use within the county | Ksh. 400,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | purchase of land for deputy governor's residence | to have sustainable land use within the county | Ksh. 10,850,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | fencing of busia municipality cemetery | to have sustainable land use within the county | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | acquisition of land for Acunet Primary school | establish land for expansion of school | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | compensation of Akites market land owner | to provide space for market/trading for the locals | Ksh. 400,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Construction of Appropriate Building Technology Centres in the remaining sub-counties | Adequate, affordable and quality houses and buildings for county residents. | Ksh. 0.00 | 2021-07-01 | 2022-06-30 | Terminated |
County | Security fencing to government compounds | Adequate, affordable and quality houses and buildings for county residents. | Ksh. 695,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Titling of county public land | To secure public land from fraudsters | Ksh. 503,212.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Construction of Governor's and Deputy Governor's residence | Adequate, affordable and quality houses and buildings for county residents. | Ksh. 36,875,800.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Purchase of land for cemetery | To provide space for public cemetery to Busia Municipality residents | Ksh. 4,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Renovation, Fencing and Gate at Buyosi Dispensary | To renovate health facilities | Ksh. 1,015,200.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Fencing, Gate and Renovation Works at Luliba Dispensary- Matayos South | To renovate the health facilities | Ksh. 700,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Upgrading of Electrical Power House at Kocholia Sub County Hospital Malaba South | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing | |
Ward | Renovation of Proposed Bulwani Dispensary - Elugulu Ward- Retention | To renovate dispensaries | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Proposed Construction of Laboratory at Ochude Dispensary Chakol South Ward | To construct laboratories at dispensaries | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Mechanical Work and Refurbishment of Ngelechom Dispensary | To renovate the dispensary | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Construction of Septic Tank and Plumbing at Burumba Dispensary | To construct septic tank and plumbing | Ksh. 1,073,280.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Proposed Renovation of Khajula Dispensary | To renovate dispensaries | Ksh. 1,000,800.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Renovation Works at Sisenye Dispensary | To renovate dispensaries to proper status | Ksh. 2,598,950.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Construction of General Ward at Budalangi Dispensary- | To construct general wards | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Supply and Delivery of Medical Equipment at Okwata a Dispensary- Amukura West | To provide health facilities with medical equipment | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Construction of Laboratory at Akiriamas Dispensary In Teso South | To construct laboratories at dispensaries | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Proposed Erection and Completion of 4 No. Door Pit Latrine at Amukura Health Centre-Amukura East | To enhance sanitation at health facilities | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Completed |
Ward | Construction of Incinerator at obekai Dispensary | To construct medical incinerators at health facilities | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Bungengi-Okilidu Box Culvert | establish storm water infrastructure | Ksh. 4,000,000.00 | 2021-07-01 | 2022-10-05 | Planned |
County | Kaukotoit- Agonget Box Culvert | establish storm water infrastructure | Ksh. 5,000,000.00 | 2021-07-08 | 2021-10-05 | Planned |
County | Osuret culvert | establish storm water infrastructure | Ksh. 2,000,000.00 | 2021-07-12 | 2021-10-20 | Planned |
County | Aderema ring road box culvert | establish storm water infrastructure | Ksh. 11,200,000.00 | 2021-10-19 | 2021-10-26 | Planned |
County | Kapina- koturroad culvert(3No) | establish storm water infrastructure | Ksh. 11,000,000.00 | 2021-07-06 | 2022-10-25 | Planned |
County | Kokare-KapinaBox culver | establish storm water infrastructure | Ksh. 7,500,000.00 | 2021-07-06 | 2022-10-04 | Planned |
County | Osipata box culvert | establish storm water infrastructure | Ksh. 3,000,000.00 | 2021-07-07 | 2022-10-05 | Planned |
County | CDF Mudawa box culvert | establish storm water infrastructure | Ksh. 4,000,000.00 | 2021-07-06 | 2022-10-03 | Planned |
Ward | sporting activities | To support sporting activities | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Pre Procurement |
Ward | support to sporting activities | To support sporting activities | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Pre Procurement |
Ward | purchase of balls and uniforms | To purchase of balls and uniforms | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Pre Procurement |
Ward | Tournaments | to hold tournaments | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | supply of dairy cows | Ksh. 3,700,000.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply of dairy cows | Ksh. 2,800,000.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply of dairy goats | Ksh. 1,500,000.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery livestock breeds | Ksh. 3,899,020.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery of livestock breeds | Ksh. 1,499,620.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery of dairy feeds | Ksh. 1,800,000.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery of livestock feeds | Ksh. 199,950.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery of livestock | Ksh. 1,999,500.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery of livestock breeds | Ksh. 999,750.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery of dairy cows | Ksh. 2,800,000.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery of livestock | Ksh. 2,999,250.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | purchase of animal feeds, baled desmodium, baled bomarhodes | Ksh. 1,000,000.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply and delivery of egg incubator | Ksh. 1,000,000.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | delivery of heifer livestock | Ksh. 2,499,380.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | livestock and livestock feeds | Ksh. 1,998,100.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | livestock and heifers | Ksh. 2,999,250.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | livestock feeds and heifers | Ksh. 1,899,960.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply of heifers | Ksh. 2,599,350.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | supply of livestock | Ksh. 1,799,550.00 | 2021-11-06 | 2022-05-13 | Ongoing | |
County | heifers | to improve milk production | Ksh. 999,978.00 | 2021-11-06 | 2022-05-13 | Ongoing |
County | livestock and livestock feeds | increase number of livestock | Ksh. 3,049,750.00 | 2021-11-06 | 2022-05-13 | Ongoing |
County | supply and delivery of livestock | increase quantity of livestock | Ksh. 999,750.00 | 2021-11-06 | 2022-05-13 | Ongoing |
County | supply and delivery of livestock | increase quantity of livestock | Ksh. 999,750.00 | 2021-11-06 | 2022-05-13 | Ongoing |
County | fish feeds and fingerlings starter | increased productivity | Ksh. 399,900.00 | 2021-11-06 | 2022-05-13 | Ongoing |
County | purchase of livestock | improve on quality | Ksh. 1,999,000.00 | 2021-11-06 | 2022-05-13 | Ongoing |
County | Purchase of poultry feeds | Increase availability of poultry feeds | Ksh. 2,398,620.00 | 2021-11-06 | 2022-05-13 | Ongoing |
Ward | Purchase of Jembes | Increasing land under cultivation | Ksh. 2,999,830.00 | 2021-11-04 | 2022-05-13 | Ongoing |
County | Proposed Fencing of Kotur Dispensary(Amukura East Ward) | Fencing of health facilities | Ksh. 299,450.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Proposed Construction of Sitting Slab for Patients and Welding of Grills to Five Windows at Okwata Dispensary.(Amukura West Ward) | Construct new facilities | Ksh. 298,120.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Purchase of assorted medical equipment for kabuodo and kamuriai dispensaries | Purchase of assorted medical equipment for dispensaries | Ksh. 1,345,360.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Completion of existing ward block and equipping of health facilities Matayos HC | Construct ward at facility | Ksh. 2,350,380.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | completion and equipping ADA county Centre | to control alcoholic drinks and drug abuse | Ksh. 0.00 | 2021-06-01 | 2022-06-30 | Planned |
Ward | Grants to groups | social development | Ksh. 1,600,000.00 | 2021-10-01 | 2022-06-30 | Planned |
Ward | self-help group grants | social development | Ksh. 3,000,000.00 | 2021-10-01 | 2022-06-30 | Planned |
Ward | Grants to groups | social development | Ksh. 2,000,000.00 | 2021-10-01 | 2022-06-30 | Planned |
Ward | supply of CIS to vulnerable groups and elderly | social development | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Planned |
Ward | Grants for women, youths and PLWDs | social development | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | Distribution of of grants in Women, youths, PLWDs and juakali groups | Social development | Ksh. 2,000,000.00 | 2021-10-01 | 2022-06-30 | Planned |
Ward | support for women and people living with disabilities | social development | Ksh. 2,500,000.00 | 2021-10-01 | 2022-06-30 | Planned |
Ward | Grants to women groups and PWDs | Social development | Ksh. 4,000,000.00 | 2021-10-01 | 2022-06-30 | Planned |
Ward | Grants FY2018/2019 | structural development | Ksh. 730,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | Purchase of iron sheets for vulnerable | To Self-Sustain Older Persons and PWD’S and Allow them Participate in Economic Development | Ksh. 500,000.00 | 2021-10-01 | 2022-06-30 | Ongoing |
Ward | NHIF support FY2018/2019 | To Self-Sustain Older Persons and PWD’S and Allow them Participate in Economic Development | Ksh. 1,000,000.00 | 2021-10-01 | 2022-06-30 | Planned |
Ward | grants FY2018/2019 | To Self-Sustain Older Persons and PWD’S and Allow them Participate in Economic Development | Ksh. 340,000.00 | 2021-09-30 | 2022-06-30 | Planned |
County | purchase of assistive devices for people with disabilities | To Self-Sustain Older Persons and PWD’S and Allow them Participate in Economic Development | Ksh. 3,500,000.00 | 2021-09-30 | 2022-06-30 | Ongoing |
Ward | Murram | improve and maintain more km of roads | Ksh. 1,000,000.00 | 2021-10-28 | 2022-04-12 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 1,700,000.00 | 2021-10-27 | 2022-04-19 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-10-11 | 2022-04-14 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-07-08 | 2022-04-11 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 800,000.00 | 2021-10-28 | 2022-04-08 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-10-12 | 2022-04-15 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 1,500,000.00 | 2021-07-29 | 2022-04-19 | Planned |
Ward | Hire of Machines | improve and maintain more km of roads | Ksh. 5,000,000.00 | 2021-07-27 | 2022-04-26 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-10-25 | 2022-04-13 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 1,300,000.00 | 2021-07-21 | 2022-04-27 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-10-19 | 2022-04-12 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 2,500,000.00 | 2021-10-13 | 2022-04-12 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 1,500,000.00 | 2021-07-30 | 2022-04-19 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 500,000.00 | 2021-10-13 | 2022-04-14 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 4,700,000.00 | 2021-07-28 | 2022-04-29 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 800,000.00 | 2021-10-18 | 2022-04-21 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 5,000,000.00 | 2021-10-19 | 2022-04-21 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 5,000,000.00 | 2021-07-08 | 2022-04-11 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-07-13 | 2022-04-21 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-10-14 | 2022-04-11 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 1,200,000.00 | 2021-07-14 | 2022-04-13 | Planned |
Ward | Hire of machine | improve and maintain more km of roads | Ksh. 2,500,000.00 | 2021-07-22 | 2022-04-04 | Planned |
Ward | Hire of machine | improve and maintain more km of roads | Ksh. 2,500,000.00 | 2021-07-16 | 2022-04-12 | Planned |
Ward | Hire of machine | improve and maintain more km of roads | Ksh. 2,500,000.00 | 2021-10-14 | 2022-04-11 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-07-13 | 2022-04-16 | Planned |
Ward | Hire of Machine | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-10-29 | 2022-04-19 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 1,000,000.00 | 2021-07-13 | 2022-04-20 | Planned |
Ward | Routine Maintenance | improve and maintain more km of roads | Ksh. 6,000,000.00 | 2021-10-12 | 2022-04-12 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 5,000,000.00 | 2021-07-21 | 2022-04-22 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 4,500,000.00 | 2021-10-23 | 2021-10-26 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,200,000.00 | 2021-10-19 | 2022-04-20 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-10-13 | 2022-04-20 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 500,000.00 | 2021-07-08 | 2022-04-07 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 5,000,000.00 | 2021-07-21 | 2022-04-13 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-07-14 | 2022-04-12 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 800,000.00 | 2021-07-07 | 2021-10-18 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,100,000.00 | 2021-07-26 | 2022-04-12 | Planned |
Ward | Machine hire | improve and maintain more km of roads | Ksh. 4,000,000.00 | 2021-07-14 | 2021-12-16 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-07-20 | 2022-11-09 | Planned |
Ward | Fuel for Machines | improve and maintain more km of roads | Ksh. 2,200,000.00 | 2021-07-15 | 2022-12-13 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-08-04 | 2022-12-21 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-10-14 | 2022-12-04 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-07-20 | 2022-12-21 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 600,000.00 | 2021-07-02 | 2022-04-04 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 1,800,000.00 | 2021-08-09 | 2022-04-18 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-07-05 | 2022-04-06 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 1,000,000.00 | 2021-10-20 | 2022-04-26 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 4,100,000.00 | 2021-07-06 | 2022-04-07 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 3,001,500.00 | 2021-07-02 | 2022-04-04 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 5,204,750.00 | 2021-07-24 | 2022-04-07 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 1,331,250.00 | 2021-07-28 | 2022-04-29 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-07-18 | 2022-04-10 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-07-12 | 2022-04-24 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 4,000,000.00 | 2021-10-12 | 2022-04-25 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-07-14 | 2022-04-11 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 2,500,000.00 | 2021-07-13 | 2022-04-12 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 3,500,000.00 | 2021-11-16 | 2022-12-06 | Planned |
Ward | Murram | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-11-30 | 2022-01-06 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 4,500,000.00 | 2021-11-20 | 2022-05-04 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-10-13 | 2022-04-28 | Planned |
Ward | Fuel | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-10-13 | 2022-04-28 | Planned |
Ward | Machine Hire | improve and maintain more km of roads | Ksh. 3,600,000.00 | 2021-10-12 | 2022-03-09 | Planned |
Ward | Fuel for roads maintenance | improve and maintain more km of roads | Ksh. 3,100,000.00 | 2021-08-12 | 2022-05-17 | Planned |
Ward | Planting of bamboos in degraded areas in Matayos South ward | To restore and rehabilitate degraded ares | Ksh. 2,500,000.00 | 2021-12-15 | 2022-04-30 | N/A |
Ward | Supply and delivery of tree seedlings at Matayos South ward | To protect and manage environment | Ksh. 299,990.00 | 2021-12-01 | 2022-03-31 | Ongoing |
Ward | supply and delivery of asorted tree seedlings,bamboo seedlings at malakisi river | To protect river bank | Ksh. 1,400,000.00 | 2021-12-01 | 2022-03-31 | Ongoing |
County | Construction of phase 1 Administration Block at onyunyur VTC | improvement of infrastructure in Vocational Training Centres | Ksh. 5,000,000.00 | 2021-10-07 | 2022-06-30 | Ongoing |
County | Construction of Administration Block at Onyunyur VTC-Mainstream | improvement of infrastructure in Vocational Training Centres | Ksh. 4,997,500.00 | 2021-10-07 | 2022-06-30 | Completed |
County | sports promotion | to create an enabling environment for development and management of sporting and recreational activities | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Namasali Vtc | improvement of infrastructure in Vocational Training Centres | Ksh. 2,704,490.00 | 2021-10-07 | 2022-06-30 | Completed |
County | stadium renovation and purchase of sports equipment | to create an enabling environment for development and management of recreational activities | Ksh. 6,000,000.00 | 2021-10-01 | 2022-05-01 | Ongoing |
County | Construction of Computer Laboratory at khayo VTC | improvement of infrastructure in Vocational Training Centres | Ksh. 2,500,000.00 | 2021-10-07 | 2022-06-30 | Ongoing |
County | Construction of Computer laboratory at Butula VTC | improvement of infrastructure in Vocational Training Centres | Ksh. 2,500,000.00 | 2021-10-07 | 2022-06-30 | Ongoing |
County | St mary's Ganga VTC | improvement of infrastructure in Vocational Training Centres | Ksh. 2,419,080.00 | 2021-10-07 | 2021-10-07 | Completed |
County | Apokor Vtc | improvement of infrastructure in Vocational Training Centres | Ksh. 2,184,120.00 | 2021-10-07 | 2022-06-30 | Ongoing |
Ward | Bursary Rollover-Bukhayo East | Education support scheme | Ksh. 144,990.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bursary Rollover - Marachi North | Education support scheme | Ksh. 700,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bursary Rollover - Malaba North | Education support scheme | Ksh. 1,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bursary Rollover - Malaba Central | Education support scheme | Ksh. 1,800,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Painting and Renovation of Administration Block at Nangina Vtc | improvement of infrastructure in Vocational Training Centres | Ksh. 1,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Lunga library - Matayos South | improvement of infrastructure in Vocational Training Centres | Ksh. 1,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Dirakho VTC | improvement of infrastructure in Vocational Training Centres | Ksh. 2,800,000.00 | 2021-10-06 | 2022-06-30 | Completed |
Ward | Support of Youth to train driving school at Marachi North | Education support scheme | Ksh. 400,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Purchase of training materials and Equipment for onyunyur VTC | Improvement of Training equipment in Vocational Training centres | Ksh. 3,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Fencing and Completion of Classrooms at Ang'urai polytechnic | improvement of infrastructure in Vocational Training Centres | Ksh. 1,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction of Okisimo polytechnic Fy 2017/18 pit latrine for Teachers and students | improvement of infrastructure in Vocational Training Centres | Ksh. 1,000,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Purchase of furniture at Okisimo polytechnic | Improvement of Training equipment in Vocational Training centres | Ksh. 1,000,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction of Masonry workshop at Matayos Vtc | improvement of infrastructure in Vocational Training Centres | Ksh. 2,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Purchase of Equipment and Machines for Nasira Polytechnic in Busibwabo | Improvement of Training equipment in Vocational Training centres | Ksh. 1,000,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction of ablution block at Busagwa Vtc | improvement of infrastructure in Vocational Training Centres | Ksh. 2,072,920.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction of Administration block at Katakwa VTC phase 1 | improvement of infrastructure in Vocational Training Centres | Ksh. 2,000,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction of Administration block at Okisimo Vtc | improvement of infrastructure in Vocational Training Centres | Ksh. 5,000,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction and Completion of Ongoing Classroom at Okisimo Youth Polytechnic | improvement of infrastructure in Vocational Training Centres | Ksh. 2,499,710.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Fencing using Concrete post and Barbed wire at Okisimo Youth Polytechnic | improvement of infrastructure in Vocational Training Centres | Ksh. 1,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Supply of Workshop tools and equipment to Buburi and Namasali youth Polytechnic | Improvement of Training equipment in Vocational Training centres | Ksh. 5,906,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bursaries to Marachi East | Education support scheme | Ksh. 1,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Training of Boda Boda at Marachi Central | Education support scheme | Ksh. 500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bursary to Chakol North | Education support scheme | Ksh. 500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Solar security lighting at Osogo-Nalera road church | increase connectivity to electrical energy | Ksh. 1,400,000.00 | 2021-09-02 | 2022-01-16 | Planned |
Ward | Solar security lighting | increase connectivity to electrical energy | Ksh. 613,740.00 | 2021-09-02 | 2022-01-16 | Planned |
Ward | Repairing of 15 solar lights | increase connectivity to electrical energy | Ksh. 689,000.00 | 2021-10-28 | 2022-06-16 | Planned |
Ward | Maintenance of existing mass lights | increase connectivity to electrical energy | Ksh. 800,000.00 | 2021-10-28 | 2022-06-16 | Planned |
Ward | Floodlights maintenance | increase connectivity to electrical energy | Ksh. 600,000.00 | 2021-10-28 | 2022-06-30 | Planned |
Ward | Solar street light at Butula town and Sikarira | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-10-28 | 2022-06-16 | Planned |
Ward | Installation of solar mass lights at Aruda junction | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-10-28 | 2022-06-23 | Planned |
Ward | Maintenance of flood lights | increase connectivity to electrical energy | Ksh. 500,000.00 | 2021-10-28 | 2022-06-23 | Planned |
Ward | Mass light at Kwa Mike | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-10-28 | 2022-06-16 | Planned |
Ward | Repair of mass light at Murumba Centre | increase connectivity to electrical energy | Ksh. 999,260.00 | 2021-10-28 | 2022-06-30 | Planned |
Ward | Bursary to Bunyala West | Education support scheme | Ksh. 1,200,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bursary for Busia TTC | Education support scheme | Ksh. 2,400,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bursary For Okisumo VTC | Education support scheme | Ksh. 700,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bursary for Amukara central ward | Education support scheme | Ksh. 1,000,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
County | Rehabilitation of Village Polytechnics | Education support scheme | Ksh. 9,547,410.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Installation of mass solar light | increase connectivity to electrical energy | Ksh. 2,400,000.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of Workshops in VTCs | improvement of infrastructure in Vocational Training Centres | Ksh. 1,000,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Proposed installation of solar mass light at Mumbaka junction | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-10-28 | 2022-06-16 | Planned |
Ward | Maintenance of three mass lights | increase connectivity to electrical energy | Ksh. 200,000.00 | 2021-09-02 | 2022-06-23 | Planned |
Ward | Fuel for roads maintenance | improve and maintain more km of roads | Ksh. 3,000,000.00 | 2021-08-11 | 2022-04-13 | Planned |
Ward | Installation of solar mass light in Bulemia market | Increase connectivity to electrical energy | Ksh. 1,187,840.00 | 2021-09-08 | 2022-06-30 | Planned |
Ward | Fuel for roads maintenance | improve and maintain more km of roads | Ksh. 2,000,000.00 | 2021-08-12 | 2022-04-20 | Under Procurement |
Ward | Installation of solar mass lights | increase connectivity to electrical energy | Ksh. 1,150,000.00 | 2021-09-01 | 2022-06-16 | Planned |
Ward | Fuel for roads maintenance | maintenance of roads | Ksh. 2,500,000.00 | 2021-08-10 | 2022-04-14 | Planned |
Ward | Installation of mass light at Sigiri,Namenya and Siginga | increase connectivity to electrical energy | Ksh. 3,600,000.00 | 2021-09-01 | 2022-06-23 | Planned |
Ward | Purchase of murram | improve and maintain more km of roads | Ksh. 800,000.00 | 2021-07-21 | 2022-04-20 | Planned |
County | Purchase of assorted medical equipment for Kabuodo and Kamuriai dispensaries | Purchase assorted medical equipment for Kabuodo and Kamuriai dispensaries | Ksh. 1,345,360.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Fuel for road maintenance | improve and maintain more km of roads | Ksh. 8,000,000.00 | 2021-07-12 | 2022-04-15 | Planned |
County | Maintenance of road construction equipment | improve and maintain more km of roads | Ksh. 10,990,000.00 | 2021-07-16 | 2022-04-14 | Planned |
County | Construction of wards (2 wards at Malaba and Maternity wing at Angurai H.C) | Construct wards and maternity wing at health facilities | Ksh. 9,600,650.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Purchase of Desk and office lockers for Malaba primary | Improve infrastructure in ECDE Centres | Ksh. 2,400,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
County | Upgrading of county roads to Bitumen standards in Nambale, Butula, Bunyala and other sub counties | put in place bitumen roads | Ksh. 100,000,000.00 | 2021-07-14 | 2022-04-12 | Planned |
Ward | Renovation of Classroom and Adm Block at Budubusi primary | Improve infrastructure in ECDE Centres | Ksh. 1,375,540.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction of 1 no ECD at Ekisumo primary | Improve infrastructure in ECDE Centres | Ksh. 1,136,810.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Busibi Special school | Improve infrastructure in ECDE Centres | Ksh. 1,300,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Bukhwamba ECDE | Improve infrastructure in ECDE Centres | Ksh. 1,200,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Mundaya ECD | Improve infrastructure in ECDE Centres | Ksh. 656,380.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Nyakhobi ECDE | Improve infrastructure in ECDE Centres | Ksh. 500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | supply of furniture at mayenje | Improve infrastructure in ECDE Centres | Ksh. 500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | installation of solar mass lights | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-07-08 | 2022-10-03 | Planned |
Ward | Renovation of two classrooms at ikapolok primary school | Improve infrastructure in ECDE Centres | Ksh. 600,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | installation of solar mass lights | increase connectivity to electrical energy | Ksh. 6,000,000.00 | 2021-07-01 | 2022-10-04 | Planned |
Ward | Construction of Toilet at kidek primary school | Improve infrastructure in ECDE Centres | Ksh. 600,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction of Toilet at Ekisegere Primary | Improve infrastructure in ECDE Centres | Ksh. 600,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | repair of solar lights at walatsi | increase connectivity to electrical energy | Ksh. 600,000.00 | 2021-07-05 | 2022-10-03 | Planned |
Ward | Construction of Toilet at Akiriamasit primary | Improve infrastructure in ECDE Centres | Ksh. 600,000.00 | 2021-10-06 | 2022-06-30 | Completed |
Ward | installation of solar mass lights at Lwanyange | increase connectivity to electrical energy | Ksh. 4,800,000.00 | 2021-10-07 | 2021-10-08 | Planned |
Ward | Fencing of Amoni primary school | Improve infrastructure in ECDE Centres | Ksh. 600,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | purchase of solar lights batteries | increase connectivity to electrical energy | Ksh. 100,000.00 | 2021-07-06 | 2021-10-05 | Planned |
Ward | Construction of ECDE Classrooms at Aciit primary school | Improve infrastructure in ECDE Centres | Ksh. 1,100,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | installation of mass lights | increase connectivity to electrical energy | Ksh. 2,400,000.00 | 2021-07-06 | 2021-10-05 | Planned |
Ward | installation of solar mass lights | increase connectivity to electrical energy | Ksh. 805,000.00 | 2021-07-08 | 2021-10-07 | Planned |
Ward | purchase of DESK FOR Apegei special,aburi and Osasamet ECD | Improve infrastructure in ECDE Centres | Ksh. 300,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | repair of mass lights | increase connectivity to electrical energy | Ksh. 1,000,000.00 | 2021-07-08 | 2022-10-04 | Planned |
Ward | 3 ECDE Aburi Osasamet, Apegei | Improve infrastructure in ECDE Centres | Ksh. 1,500,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | installation of 4 mass lights | increase connectivity to electrical energy | Ksh. 2,400,000.00 | 2021-07-13 | 2022-10-05 | Planned |
Ward | Construction of St martins Ganga ECDE | Improve infrastructure in ECDE Centres | Ksh. 1,200,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | FY 14/15-siginga -construction of school library @1200000; Bumadeya construction of ECD UNIT @1200000 | Improve infrastructure in ECDE Centres | Ksh. 2,400,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Construction of ECD Classrooms at Osieko primary (1.2) and Khainga (1.2) | Improve infrastructure in ECDE Centres | Ksh. 2,400,000.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | Completion of Amoni ECD | Improve infrastructure in ECDE Centres | Ksh. 798,600.00 | 2021-10-06 | 2022-06-30 | Ongoing |
Ward | installation of mass light at center | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-07-07 | 2022-10-03 | Planned |
Ward | installation of mass lights at manyole | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-07-06 | 2022-10-04 | Planned |
Ward | mass light repair at maarifa | increase connectivity to electrical energy | Ksh. 400,000.00 | 2021-07-05 | 2022-10-04 | Planned |
Ward | repair of mass lights | increase connectivity to electrical energy | Ksh. 1,000,000.00 | 2021-07-06 | 2022-10-05 | Planned |
Ward | Construction of ECD classes at Bukhulungu and Bwangangi Pri school | Improve infrastructure in ECDE Centres | Ksh. 2,400,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | construction of Manyole ECDE Classroom | Improve infrastructure in ECDE Centres | Ksh. 1,100,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Supply and Delivery of Assorted Furniture for Nangina Ward | Improve infrastructure in ECDE Centres | Ksh. 500,000.00 | 2021-10-05 | 2022-06-30 | Completed |
Ward | Construction of ikondo9khera ecde class | Improve infrastructure in ECDE Centres | Ksh. 1,150,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of ECDE at Nambale urban primary | Improve infrastructure in ECDE Centres | Ksh. 1,000,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Repair of ECDE classes at Bwamani, siteko,Bulanda and Mabale | Improve infrastructure in ECDE Centres | Ksh. 1,000,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of 2 ECD class at Busende and Busendebala | Improve infrastructure in ECDE Centres | Ksh. 2,400,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of 4 Door pit latrine at lunga primary school | Improve infrastructure in ECDE Centres | Ksh. 600,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of ECDE Classroom Fy2018/19 at Kamuriai primary school | Improve infrastructure in ECDE Centres | Ksh. 1,000,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of Achunet ECD classrooms | Improve infrastructure in ECDE Centres | Ksh. 1,200,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Sumba Island -Construction of ECD Classroom @1650000, Bumadeya construction of ECD Unit @1485000 | Improve infrastructure in ECDE Centres | Ksh. 3,188,140.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | supply of plastic chairs to ECDE schools and construction of toilets at Lunyofu pri (siginga) ksh 550000,bulemia pri ksh 450000 Bumadeya pri (bukami) ksh 450000 500000 for lunyofu primary and kshs 400000- Bunyala west | Improve infrastructure in ECDE Centres | Ksh. 1,700,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction works at st cecilia bumadeya and mulisenye school | Improve infrastructure in ECDE Centres | Ksh. 1,200,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of Pit Latrine at lunyofu (ksh500000) and Bumadeya primary(ksh400000) | Improve infrastructure in ECDE Centres | Ksh. 900,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | installation of 2 mass lights | increase connectivity to electrical energy | Ksh. 2,400,000.00 | 2021-07-08 | 2021-10-06 | Planned |
Ward | Construction of 1 Block 4 Door pit latrine at st Cecilia Bumadeya | Improve infrastructure in ECDE Centres | Ksh. 800,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | rural electrification | increase connectivity to electrical energy | Ksh. 1,000,000.00 | 2021-07-05 | 2021-10-05 | Planned |
Ward | Construction of a one ECD classroom at Makunda primary | Improve infrastructure in ECDE Centres | Ksh. 1,400,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of one ECD classroom at Mundika B Primary | Improve infrastructure in ECDE Centres | Ksh. 1,400,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of ECD classrooms at Manyole Mwikemo primary school | Improve infrastructure in ECDE Centres | Ksh. 1,200,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | rural electrification programme | increase connectivity to electrical energy | Ksh. 1,500,000.00 | 2021-07-06 | 2022-10-05 | Planned |
Ward | maximization of existing transformer at Apala/akanyo | increase connectivity to electrical energy | Ksh. 1,500,000.00 | 2021-07-07 | 2021-10-05 | Planned |
Ward | maximization of existing transformers | increase connectivity to electrical energy | Ksh. 1,000,000.00 | 2021-07-07 | 2022-10-04 | Planned |
Ward | St Gabriel Moru Primary School | Improve infrastructure in ECDE Centres | Ksh. 1,200,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of ECDE classrooms at Oburikode primary school | Improve infrastructure in ECDE Centres | Ksh. 1,200,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Akichelesit primary school | Improve infrastructure in ECDE Centres | Ksh. 800,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | construction of 4 door pit latrine at kakapel primary school | Improve infrastructure in ECDE Centres | Ksh. 500,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of ECD Classroom F y2018/19 at kolait and katotoi primary | Improve infrastructure in ECDE Centres | Ksh. 2,400,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | supply of ecd plastic chairs across the ward | Improve infrastructure in ECDE Centres | Ksh. 2,000,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Elalai ECD | Improve infrastructure in ECDE Centres | Ksh. 700,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Renovation of Classrooms Fy 2018/19, Ojamii and Township primary school | Improve infrastructure in ECDE Centres | Ksh. 1,720,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | Construction of Classroom and a pit latrine at Alupe special school | Improve infrastructure in ECDE Centres | Ksh. 1,500,000.00 | 2021-10-05 | 2022-06-30 | Ongoing |
Ward | maintenance of solar lights | increase connectivity to electrical energy | Ksh. 1,000,000.00 | 2021-07-07 | 2021-10-06 | Planned |
Ward | installation of mass lights | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-07-07 | 2021-10-05 | Planned |
County | Construction of 44 market stalls office and store at Mubwayo market Phase 2 | Construction of modern markets | Ksh. 3,366,710.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Proposed construction of sagania market in Nambomboto/ Nambuku Ward | Construction of modern markets | Ksh. 3,728,980.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of 28 stalls market shed annexed with office and store at Kamolo Market. | Construction of modern markets | Ksh. 3,990,000.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of 28 Stalls, Market sheds Annex with Office at Nambuku Market | Construction of modern markets | Ksh. 3,999,130.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of Lukolis Market | Construction of modern markets | Ksh. 4,981,850.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Proposed construction of 112No stall Market shades at Adungosi Mkt | Construction of modern markets | Ksh. 9,830,560.00 | 2021-09-01 | 2022-06-30 | Planned |
County | Construction of market shade at Bukiri Market | Construction of modern markets | Ksh. 5,755,800.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of 44 Market stalls, Office and store at Mubwayo phase 2 | Construction of modern markets | Ksh. 3,366,710.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of Murumba Market Phase 1 | Construction of modern markets | Ksh. 299,740.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of Tangakona Market in Nambale Township | Construction of modern markets | Ksh. 2,800,000.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of market shade at Munongo Market | Construction of modern markets | Ksh. 2,699,670.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of marketstalls at Kolanya Market | Construction of modern markets | Ksh. 2,396,480.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of Mungatsi Market shade Phase 1 | Construction of modern markets | Ksh. 2,304,430.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of Abolution Block at Kisoko Market Nambale Township | Construction of modern markets | Ksh. 1,985,000.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Proposed Renovation of Mundika Market in Bukhayo West Ward, Matayos Subcounty | Construction of modern markets | Ksh. 1,950,800.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Copletion works at Bukadanyi Market | Construction of modern markets | Ksh. 999,500.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of4 door pit Latrine at Lukolis Market | Construction of modern markets | Ksh. 863,370.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Proposed renovation of Matayos Market | Construction of modern markets | Ksh. 548,900.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Fencing of Akites market in Teso South Subcounty | Construction of modern markets | Ksh. 299,980.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Construction of office block and Fencing of Ang'urai market | Construction of modern markets | Ksh. 200,000.00 | 2021-10-28 | 2022-06-30 | Planned |
County | Equipping of weights and measures workshop. | Procurement of weigh bridge test weights | Ksh. 3,000,000.00 | 2021-10-25 | 2022-06-24 | Planned |
Ward | installation of solar powered and mass lights | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-07-07 | 2021-10-06 | Planned |
Ward | installation of floodlights | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-07-07 | 2022-10-04 | Planned |
Ward | repair of flood lights | increase connectivity to electrical energy | Ksh. 700,000.00 | 2021-10-05 | 2022-10-04 | Planned |
County | maintenance of electrical installation across the county | increase connectivity to electrical energy | Ksh. 8,000,000.00 | 2021-07-07 | 2022-10-04 | Planned |
County | street lighting and rural electrification programme | increase connectivity to electrical energy | Ksh. 8,500,000.00 | 2021-07-06 | 2022-10-04 | Planned |
County | installation of solar mas light at osere city | increase connectivity to electrical energy | Ksh. 1,200,000.00 | 2021-10-05 | 2021-10-05 | Planned |
County | installation and maintenance of solar lights (rollovers)- opare pri,st james koteko, Akapijan B, Duka moja junction, goria catholic junction, | increase connectivity to electrical energy | Ksh. 6,000,000.00 | 2021-07-07 | 2022-10-04 | Planned |
Ward | purchase of fuel survullance | To incresae quqntities of fish and fish products | Ksh. 2,000,000.00 | 2021-09-06 | 2022-06-28 | Ongoing |
Ward | Purchase of fish feeds | To increase quantities of fish and fish products | Ksh. 1,599,780.00 | 2021-07-12 | 2022-07-19 | Ongoing |
Ward | purchase of feeds | To increase quantities of fish and fish products | Ksh. 3,500,000.00 | 2021-07-06 | 2022-06-24 | Ongoing |
Ward | Construction of ECD classroom at Ojamii ECD | Improve infrastructure in ECDE Centres | Ksh. 1,200,000.00 | 2021-10-04 | 2022-06-30 | Ongoing |
Ward | Purchase of fish feeds | To increase quantities of fish and fish products | Ksh. 2,000,000.00 | 2021-07-05 | 2022-06-15 | Ongoing |
Ward | Construction of Three Door ECDE Pit Latrine at Amerikwai Primary | Improve infrastructure in ECDE Centres | Ksh. 500,000.00 | 2021-10-04 | 2022-06-30 | Ongoing |
County | Development of tree nurseries in Matayos | To increase tree cover | Ksh. 745,500.00 | 2021-12-15 | 2022-04-30 | Ongoing |
Ward | purchase of fingerlings | To increase quantities of fish and fish products | Ksh. 3,500,000.00 | 2021-08-30 | 2022-06-07 | Ongoing |
Ward | Cage fabrication and purchase of fingerlings and feeds | To increase quantities of fish and fish products | Ksh. 7,000,000.00 | 2021-08-09 | 2022-06-07 | Ongoing |
Ward | purchase of raw material for Nasewa factory | To increase quantities of fish and fish products | Ksh. 2,600,000.00 | 2021-09-02 | 2022-06-27 | Ongoing |
Ward | purchase of fish feeds | To increase quantities of fish and fish products | Ksh. 20,099,900.00 | 2021-09-13 | 2022-06-10 | Ongoing |
Ward | fabrication and installation of high capacity cage | To increase quantities of fish and fish products | Ksh. 1,299,970.00 | 2021-09-02 | 2022-06-14 | Ongoing |
County | Planting bamboo along riverine areas of Nambale,Suo,Sibinga in Samia and River Machakus | To rehabilitate degraded landscape through promotion of indigenous species | Ksh. 7,000,000.00 | 2021-12-01 | 2022-03-31 | Planned |
Ward | purchase of fish feeds | to increase quantities of fish and fish products. | Ksh. 2,998,720.00 | 2021-08-10 | 2022-05-23 | Ongoing |
County | Rehabilitation of degraded land across the county | To rehabilitate degraded lands across the county | Ksh. 3,000,000.00 | 2021-12-01 | 2022-04-30 | Planned |
Ward | purchase of fish feeds | To increase quantities of fish and fish products | Ksh. 1,299,620.00 | 2021-09-14 | 2022-04-20 | Ongoing |
Ward | purchase of fingerlings | To increase quantities of fish and fish products | Ksh. 2,399,860.00 | 2021-10-08 | 2022-06-21 | Ongoing |
Ward | Purchase of Tilapiafingerlings/ starter marsh | To increase qauntities of fish and fish products | Ksh. 2,399,860.00 | 2021-09-07 | 2022-05-24 | Ongoing |
Ward | purchase of fish feeds | To increase quqntities of fish and fish products | Ksh. 1,999,900.00 | 2021-07-13 | 2022-06-10 | Ongoing |
Ward | purchase of fish feeds | To increase quantities of fish and fish products | Ksh. 2,799,300.00 | 2021-08-03 | 2022-06-22 | Ongoing |
Ward | fingerlings and fishfeeds | To increase quantities of fish and fish products | Ksh. 3,999,900.00 | 2021-10-04 | 2022-05-30 | Ongoing |
Ward | Erection of Boda boda shades Nambale Township | To erect Boda boda shades in Nambale Township | Ksh. 600,000.00 | 2021-09-01 | 2022-06-30 | Planned |
Ward | Solar LED street lights | To erect solar LED lights | Ksh. 2,500,000.00 | 2021-09-01 | 2022-06-23 | Planned |
County | Construction of Sisenye Market Shed | Construction of modern markets | Ksh. 15,000,000.00 | 2021-09-01 | 2022-01-16 | Planned |
County | Construction of Septic Tank at Butula Market | Construction of modern markets | Ksh. 1,000,000.00 | 2021-09-01 | 2022-01-16 | Planned |
County | Mundika Market Rehabilitation and Cabros Laying Phase 1 | Construction of modern markets | Ksh. 2,000,000.00 | 2021-09-01 | 2022-01-16 | Planned |
County | completion of busia border point fish transhipment and auction centre | To increase fish and fish products | Ksh. 5,000,000.00 | 2021-09-29 | 2021-11-22 | Ongoing |
County | fish processoing cottage industry development marenga fish fillet processing plant | To increase fish and fish products | Ksh. 4,000,000.00 | 2021-11-30 | 2022-05-10 | Ongoing |
County | Environmental rehabilitation in Nzoia | To rehabilitate environment | Ksh. 1,000,000.00 | 2021-11-01 | 2022-04-30 | Planned |
County | Public administration cost and public participation in various wards | Smooth running of sub county offices | Ksh. 14,906,800.00 | 2021-08-06 | 2022-06-16 | Planned |
Ward | Purchase of land for Odioi dispensary | to provide land for medical facility | Ksh. 500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Installation and commissioning of structure network. | to improve ICT services in the county | Ksh. 3,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Development of Community Empowerment Centre | To develop,promote and preserve the cultural heritage of Busia county | Ksh. 6,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Various activities at ward level | improvement of various projects in all 35 wards | Ksh. 150,024,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
County | Construction works for the county disaster HQs | construction and equipping of disaster centers | Ksh. 12,550,000.00 | 2021-10-25 | 2022-06-30 | Ongoing |
County | Purchase of fire engine to be stationed at Samia and Bunyala sub Counties | to strengthen disaster preparedness, mitigation and response | Ksh. 55,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | installation of lightening arrestors | identification of risks | Ksh. 7,029,000.00 | 2021-10-31 | 2022-06-30 | Ongoing |
Ward | training of bodaboda at Nambale township ward | Education support scheme | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to mayenje ward | Education support scheme | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to Matayos south | Education Support | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | local tourism and development | promotion of tourism activities across the county | Ksh. 2,000,000.00 | 2021-09-30 | 2022-06-30 | Planned |
Ward | bursary to Malaba South ward | Education support scheme | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to malaba north ward | Education support scheme | Ksh. 0.00 | 2021-07-01 | 2022-06-30 | Terminated |
Ward | Bursary to malaba central ward | Education support scheme | Ksh. 800,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to bwiri ward | Education support scheme | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | support for needy and bright students at Buibwabo ward | Education support scheme | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | support to youth and women driving school at Burumba ward | Education support scheme | Ksh. 1,950,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to Burumba ward | Education support scheme | Ksh. 1,200,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to bunyala south | Education support scheme | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to bunyala central | Education support scheme | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bodaboda training at Bukhayo West | Education support scheme | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to Angurai south | Education support scheme | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bodaboda training at Angurai South ward | Education support scheme | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to Ang'urai North | Education support scheme | Ksh. 700,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Bursary to Ang'urai East | Education support scheme | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | bamboo planting | Creating awareness on modern land management practices | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | food support for the elderly | to hedge the elderly against food insecurity | Ksh. 0.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of maize seeds | support farmers | Ksh. 4,000,000.00 | 2021-08-06 | 2022-06-16 | Planned |
Ward | Bursary to Angorom ward | Education support scheme | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Purchase of jembes | support farmers | Ksh. 1,000,000.00 | 2021-08-06 | 2022-06-16 | Ongoing |
Ward | Purchase of maize seed | Improve agricultural productivity | Ksh. 1,500,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Covid -19 support to vulnerable groups Ward Wide | Support vulnerable groups during pandemic | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Hire of tractors for ploughing | increasing acreage of land for ploughing | Ksh. 800,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Bursary at Amukura West ward | Education support scheme | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Flagship | Farm inputs | Improve agricultural productivity | Ksh. 3,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of jembes | Improve agricultural productivity | Ksh. 0.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | completion of phase 2 staff house bumutiru dispensary | Construct new facilities | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Fuel for ambulance Ward Wide | Fuel ambulance | Ksh. 700,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | purchase of communication equipment | to ensure communication officers carry out their duties effectively. | Ksh. 4,235,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Supply of food stuff to the elderly | To hedge the elderly against food insecurity | Ksh. 3,000,000.00 | 2021-08-06 | 2022-06-16 | Ongoing |
Ward | Construction of a 3door pit latrine at Apegei | Construct sanitation block | Ksh. 400,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | completion of a general ward Budalang'i dispensary | Construct dispensary | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Supply of jembes and seeds | improve farming activities | Ksh. 3,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | procure production of documentary | to ensure visibility of county projects through video documentaries | Ksh. 5,841,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | completion of Busagwa maternity in Bunyala central | Construct maternity ward | Ksh. 5,800,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Purchase of jembes | increase agricultural productivity | Ksh. 1,300,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Construction of maternity ward kapina dispensary in Bukhayo North | Construct maternity ward | Ksh. 2,500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Purchase of jembes | Improve agricultural productivity | Ksh. 800,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Fencing of Kajoro dispensary land in Amukura Central | Renovate dispensaries | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Purchase of maize seeds | increase productivity | Ksh. 2,500,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase for jembes | improve productivity | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Disease surveillance and control | Disease surveillance and control | Ksh. 2,207,900.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Purchase of jembes | Support farmers | Ksh. 1,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of maize seeds | support farmers through input access | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of farm implements(jembes) | increase productivity | Ksh. 3,400,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Upgrade 30,000 households with improved sanitation systems | upgrade sanitation systems for households | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Fumigation and disinfection of premises for hygiene and vector control | Disease control | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Support of primary health care in all the public Health facilities | Support primary health care in all the public Health facilities | Ksh. 13,323,800.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Establish eye care Centres in Kocholya, Khunyangu and Alupe hospitals | Construct new facilities | Ksh. 4,500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Supply of maize seeds to farmers | increase produce | Ksh. 1,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Supply of farm inputs | increase productivity | Ksh. 2,600,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of jembes for farmers | productivity improvement | Ksh. 3,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of maize seeds and fertilizers | Improve productivity | Ksh. 5,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Supply of Jembes | Improve productivity | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | pig promotion (purchase of piglets) | increasing pig production | Ksh. 1,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
Ward | purchase of heifers and piglets | increasing livestock productivity by improving quality of the herd | Ksh. 1,500,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Construction of laboratory at Igula dispensary | Construct laboratory at facility | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Operationalization of Nyalwanda dispensary, | Operationalize new facilities | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Purchase of Bullying heifers | Increasing milk production by improving the quality of the dairy herd | Ksh. 2,500,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Completion and calibration of water tank | Procurement of weigh bridge test weights | Ksh. 3,000,000.00 | 2021-09-02 | 2022-06-23 | Planned |
County | Construction of mortuary at Matayos phase I, | Construct mortuary at facility | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Dairy Heifers Project (purchase of dairy heifers) | Increasing Milk Production by improving the quality of the dairy herd | Ksh. 4,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Construction of maternity ward at Masendebale | Construct maternity unit at facility | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | construction of laboratory at Kamuriai dispensary | Construct laboratory at the facility | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Supply of maize seeds to farmers | Support farmers | Ksh. 4,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Dairy Development (Purchase of dairy goats and piglets) | Increasing dairy goats and pigs productivity | Ksh. 1,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Equipping of Busembe dispensary | Equip the facility | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Purchase of farm inputs | Improve productivity | Ksh. 0.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Equipping of Ganjala dispensary | Equip the facility | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Equipping of Nambale mortuary | Equip facility | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Dairy Heifers Project | Increasing milk production by improving the quality of the dairy herd | Ksh. 2,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Building of gate at Mayenje dispensary, | Construct gate at the facility | Ksh. 300,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | construction of septic tank at Malanga dispensary | Construct septic tank | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Dairy Heifers project | Increasing milk production by improving the quality of the dairy herd | Ksh. 2,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | construction of staff houses to completion at Bukalama | Construct facilities | Ksh. 2,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Pig promotion (purchase of pigs and piglets) | Improving pig production | Ksh. 0.00 | 2021-11-01 | 2022-06-30 | Planned |
County | completion of maternity at Esikulu dispensary | Construct maternity wing at facilty | Ksh. 4,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Construction of maternity for Mudembu dispensary, | Construct maternity facility | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Purchase of Dairy Goats | Increasing milk production by improving the quality of the dairy herd | Ksh. 1,200,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Construction of Buloma dispensary | Construct new facilities | Ksh. 5,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Dairy heifers project | increasing milk production by improving the quality of the dairy herd | Ksh. 2,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Renovation of Buduta staff quarters | Renovate facilities | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Dairy heifers project | Increasing milk production by improving the quality of the dairy herd | Ksh. 2,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Equipping Busibula dispensary | Equip facility | Ksh. 1,200,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Purchase of dairy heifers | Increasing milk production by improving the quality of the dairy herd | Ksh. 1,500,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Renovation of Busibula dispensary | Renovate facility | Ksh. 1,400,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | purchase of heifers | increasing milk production by improving the quality of the dairy herd | Ksh. 1,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | completion of Buyofu dispensary | Construct new facilities | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | purchase of heifers | Increasing milk production by improving the quality of the dairy herd | Ksh. 3,000,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Construction of theatre at Nambale SCH | Construct theatre at facility | Ksh. 1,600,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | purchase of heifers | Increasing milk production by improving the quality of the dairy herd | Ksh. 1,200,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Renovation of Imanga dispensary | Renovate facilitiy | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Equipping Benga dispensary | Equip dispensary | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Farm inputs | Increase productivity | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Omena beach office | To increase quantities of fish and fish products | Ksh. 1,500,000.00 | 2021-07-14 | 2022-05-27 | Planned |
Ward | Purchase of jembes | to increase productivity | Ksh. 1,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | 4 door pit latrine at Amukura health centre, | construct sanitation block at facility | Ksh. 480,290.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Farm inputs | Improve productivity | Ksh. 1,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | medical equipment at Okwata dispensary | purchase medical equipment | Ksh. 2,200,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | Fuel surveillance in the lake | To increase quantities of fish and fish products | Ksh. 1,000,000.00 | 2021-07-15 | 2022-06-22 | Ongoing |
County | Renovation works at Aturet dispensary | Renovate facility | Ksh. 759,290.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Renovation, fence and gate at Buyosi dispensary, | Renovate facility | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
Ward | fuel surveillance in the lake | to increase fish and fish products | Ksh. 1,000,000.00 | 2021-07-13 | 2022-06-27 | Ongoing |
Ward | Farm inputs | Improve Agricultural productivity | Ksh. 2,700,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of Farm Inputs(seeds and fertilizer) | to Increase Agricultural Productivity | Ksh. 1,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Completion of maternity wing at Bukhalalire | Construct maternity wing at bukhalalire | Ksh. 147,401.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Renovation of Bulwani dispensary, | Renovate facility | Ksh. 496,050.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Angurai health center maternity completion | Construct maternity unit at facility | Ksh. 1,900,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Construct Aloet dispensary pit latrine | Construct sanitation block at facility | Ksh. 299,987.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Construction of theatre at Nambale SCH | Construct theatre at facilities | Ksh. 1,600,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | construction of Kapesur dispensary | Construct new facilities | Ksh. 235,916.00 | 2021-07-01 | 2022-06-30 | Planned |
County | completion of an incinerator at Kocholya SCH | Construct incinerator at facilities | Ksh. 220,989.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | construction of outpatient block at Apegei dispensary | Renovate lower level facilities | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Construction of incinerator at Obekai dispensary | Construct incinerator at facilities | Ksh. 1,500,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Equipment and operationalization of youth empowerment centre | Youth Enterprises | Ksh. 2,000,000.00 | 2018-07-02 | 2022-06-30 | Ongoing |
Ward | Purchase of acaricide and distribution to farmers | Improve vector control activities | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Purchase of acaricide and distribution to farmers | Improve vector control activities | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Purchase of acaricide and distribution to farmers | Improve vector control activities | Ksh. 3,200,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Meat inspection | Improve meat inspection services | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Artificial insemination services (A.I) | Improve animal breeds through Artificial Insemination (A.I) programme | Ksh. 1,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Livestock vaccination | Veterinary disease control | Ksh. 16,138,100.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Farm inputs | Increased Agricultural Productivity | Ksh. 1,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of jembes | To Increase Agricultural Productivity | Ksh. 1,500,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of jembes | to Increase Agricultural Productivity | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | purchase of fish feeds | To increase fish and fish products | Ksh. 9,000,000.00 | 2021-07-20 | 2022-06-15 | Ongoing |
Ward | Purchase of maize seeds | To Increase Agricultural Productivity | Ksh. 3,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of fertilizer | To increase agricultural productivity | Ksh. 0.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | Purchase of jembes | To Promote Adoption of Modern Farming Technologies and Practices | Ksh. 3,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | purchase of fish feeds | increased quantities of fish and fish products | Ksh. 1,500,000.00 | 2021-07-14 | 2022-05-27 | Ongoing |
County | Agriculture development fund | To increase allocation of credit and disbursements | Ksh. 3,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
Ward | purchase of fish feeds | To increase quantities fish and fish products | Ksh. 1,500,000.00 | 2021-07-16 | 2022-05-23 | Ongoing |
County | Operationalization of cassava ADC / Poultry and dairy parks | Establishment and revival of farmer associations | Ksh. 12,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Agriculture sector development support programme (ASDSP) | To support farmers | Ksh. 41,440,100.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Renovation and equipping of ATC | Operationalization of farmer training centre | Ksh. 4,595,030.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Farmer Training support project DFF | Capacity building of Producers and stakeholders | Ksh. 5,000,000.00 | 2021-08-06 | 2022-06-16 | Ongoing |
County | Support to farmer visit (crops extension and farmer associations, public participation, exhibitions and trade fairs and policy and legislation development | Capacity building of Producers and stakeholders | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Construction of bus park- Malaba | Well managed urban settlement | Ksh. 7,530,500.00 | 2019-07-01 | 2022-06-30 | Ongoing |
County | County Spatial Plan | To have a well planned urban settlement | Ksh. 9,103,210.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Solid Waste Management | To have a clean working environment for Busia residents in urban areas | Ksh. 25,374,800.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Non communicable disease control | Reduce incidences of Non-communicable diseases | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Nutrition services | Improve access to nutritional services | Ksh. 30,232,600.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | Reproductive Health, Maternal, Neonatal, Child, Adolescent Health RMNCAH | Enhance efficient and effective reproductive maternal, Neonatal, child, adolescent Health | Ksh. 2,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | TB and Leprosy control | Reduce TB transmission | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Malaria Control | Reduce the prevalence of malaria from 27% to 25% | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | HIV/AIDS control | Enhanced HIV/AIDs Counselling and Testing | Ksh. 3,000,000.00 | 2021-07-01 | 2022-06-30 | Ongoing |
County | fisheries aquaculture processing and cottage development-Nasewa Fish feeds | To increase quantities of fish and fish products | Ksh. 3,000,000.00 | 2021-07-10 | 2022-06-30 | Ongoing |
Flagship | Insects, pests and disease management | To protect crops against pests, insects and diseases | Ksh. 2,000,000.00 | 2021-11-06 | 2022-01-09 | Planned |
Flagship | Soil Fertility improvement across the 7 sub counties | Improving the soil fertility by testing the PH | Ksh. 3,000,000.00 | 2021-11-06 | 2022-06-16 | Planned |
Flagship | Marginalized and vulnerable social protection through input access | Improve access to agricultural inputs | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-16 | Planned |
County | fencing and gate for Buhuyu | to fence and build gate for buhuyu market | Ksh. 2,000,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Tractor Hire Subsidy project | To improve Land mechanization | Ksh. 0.00 | 2021-11-06 | 2022-06-16 | Ongoing |
County | Environmental rehabilitation in Odioi, Nambale, Osipata, Odiado, Nella, Agong'et, Luliba | To rehabilitate environment | Ksh. 5,100,000.00 | 2021-11-01 | 2022-04-30 | Planned |
Ward | Fencing of Chengo market | to fence chengo market | Ksh. 1,500,000.00 | 2021-09-02 | 2022-06-16 | Planned |
Ward | solar LED90-100watts commercial street light all in one non split 2500000 | to install solar LED90-100watts commercial street light all in one non split 2500000 | Ksh. 1,200,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Universal Health Coverage | To enhance Universal Coverage of Health | Ksh. 42,178,900.00 | 2021-07-01 | 2022-06-30 | Ongoing |
Ward | Supply and delivery of tools at Okisimo vocational training centre ward wide at Amukura East | Improvement of Training equipment in Vocational Training centres | Ksh. 500,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
County | Subsidized Vocational Training Centers support Grant | Education support scheme | Ksh. 42,550,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
County | Completion and Refurbishment of workshops and administration blocks in VTCs at Katakwa and Namasaji | improvement of infrastructure in Vocational Training Centres | Ksh. 13,582,100.00 | 2021-09-01 | 2022-06-30 | Completed |
Ward | Bumaengs Legio installation of street light | to install street light at Bumaengs Legio | Ksh. 1,200,000.00 | 2021-09-02 | 2022-06-16 | Planned |
Ward | Latrine Construction at Bubango primary Bunyala west | Improve infrastructure in ECDE Centres | Ksh. 400,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
Ward | renovation of Marenga fish market | to renovate Marenga fish market | Ksh. 200,000.00 | 2021-09-02 | 2022-06-16 | Planned |
Ward | Construction of pit door latrine at Runyu primary Bunyala South | Improve infrastructure in ECDE Centres | Ksh. 1,600,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
Ward | Construction of Mubwayo market ablution block | to construct Mubwayo market ablution block | Ksh. 1,300,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Rehabilitation of degraded land across the county | To rehabilitate and restore degraded landscape | Ksh. 4,000,000.00 | 2021-09-01 | 2022-06-30 | Planned |
Ward | repair of ECDE classrooms Mayenje ward | Improve infrastructure in ECDE Centres | Ksh. 1,000,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
County | construction of kekalet market phase 1 and 44 stalls | To construct kekalet market | Ksh. 2,000,000.00 | 2021-09-02 | 2022-06-16 | Planned |
Ward | Construction of ECDE Classrooms at Budala primary -Bunyala south ward | Improve infrastructure in ECDE Centres | Ksh. 1,400,000.00 | 2021-09-01 | 2022-06-30 | Ongoing |
County | construction of ablution block sialala market | to construct sialala market ablution block | Ksh. 2,000,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | fencing of Dadira market | To fence Dadira market | Ksh. 1,000,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Construction of trailer Park Malaba | To ease congestion in urban areas | Ksh. 7,000,000.00 | 2021-07-01 | 2022-06-30 | Planned |
County | Construction and Completion of ECDE Classrooms | Improve infrastructure in ECDE Centres | Ksh. 51,502,000.00 | 2021-09-05 | 2022-06-30 | Ongoing |
County | Maintenance of tractors | well functioning tractors | Ksh. 2,000,000.00 | 2021-11-06 | 2022-06-10 | Ongoing |
County | construction of modern ablution block for kamuriai market | To construct modern ablution block for Kamuriai market | Ksh. 3,000,000.00 | 2021-09-02 | 2022-06-30 | Planned |
County | Fencing and gate for Buhuyi market | To fence and gate building gate for Buhuyi market | Ksh. 20,000,000.00 | 2021-09-02 | 2022-06-30 | Planned |
County | completion of Murumba market | To complete Murumba market | Ksh. 3,000,000.00 | 2021-09-01 | 2022-06-30 | Planned |
County | Fencing of Lukolis market | To fence Lukolis market | Ksh. 1,500,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Fencing of Nambale auction grins | To fence Nambale auction grins | Ksh. 500,000.00 | 2021-09-02 | 2022-06-23 | Planned |
County | Construction of septic tank in Butula market | To construct septic tank in Butula market | Ksh. 1,000,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Fencing of Butula and Muruka markets | To fence Butula and Muruka markets | Ksh. 4,000,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Construction of Bumala modern market and Mayenje market three door pit latrine | To construct Bumala modern market and Mayenje market three door pit latrine | Ksh. 4,000,000.00 | 2021-09-01 | 2022-06-16 | Planned |
County | Matayos market ablution block | To construct Matayos market ablution block | Ksh. 3,000,000.00 | 2021-09-01 | 2022-06-16 | Planned |
County | ,Bumala market ablution block | To construct Bumala market ablution block | Ksh. 5,320,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Changara market | To construct Changara market | Ksh. 3,000,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | Bukiri market ablution block | To construct Bukiri market ablution block | Ksh. 6,000,000.00 | 2021-09-02 | 2022-06-16 | Planned |
County | posta market, ablution block renovation, | To renovate ablution block of M. posta market | Ksh. 300,000.00 | 2021-09-08 | 2022-06-16 | Planned |
County | Soko Posta market laying of cabros | To modernize posta soko market | Ksh. 4,700,000.00 | 2021-09-08 | 2022-06-23 | Planned |
County | Construction of Funyula market | To construct Funyula Market | Ksh. 4,000,000.00 | 2021-09-01 | 2022-06-30 | Planned |
County | Osieko Market Phase 1 | To construct and rehabilitate Osieko Market | Ksh. 2,000,000.00 | 2021-09-02 | 2022-06-23 | Planned |
County | Mundika market rehabilitation and cabros laying Phase 1 | To rehabilitate Mundika Market | Ksh. 3,500,000.00 | 2021-09-01 | 2022-04-30 | Ongoing |
County | completion and equipping of Wakhungu Training and breeding centre | To increase fish and fish products | Ksh. 5,000,000.00 | 2021-07-10 | 2022-06-30 | Ongoing |
County | Training and fish breeding | To increased fish and fish products | Ksh. 4,000,000.00 | 2020-07-10 | 2021-06-10 | Ongoing |
County | Livestock Extension services ( Building strengthening and support livestock institutions project) | Building strengthening and monitoring livestock production projects | Ksh. 3,428,990.00 | 2020-11-01 | 2021-06-30 | Ongoing |
County | Equipping and operationalizing youth empowerment centres | Equip and operationalize youth empowerment centre | Ksh. 20,000,000.00 | 2018-07-02 | 2022-06-30 | Planned |
County | Establishment of Poultry Parks | Increasing access to quality breeding eggs and chicks to poultry value chain actors | Ksh. 90,500,000.00 | 2020-11-01 | 2021-06-30 | Ongoing |
County | Employment of youth internship | To assist youth to access internship employment | Ksh. 5,000,000.00 | 2018-07-02 | 2022-06-30 | Planned |
County | Construction of Milk coolers holding facilities ( Purchase of Processing Equipment ) | Increasing the scope of value addition and processing of milk and products | Ksh. 5,700,000.00 | 2021-11-01 | 2022-06-30 | Planned |
County | Youth empowerment and development | Youth Enterprises | Ksh. 40,000,000.00 | 2018-07-01 | 2021-06-30 | Planned |
County | Dairy promotion and Development | Improving livestock production through purchase of livestock inputs | Ksh. 8,950,000.00 | 2021-11-01 | 2022-07-30 | Planned |
County | Dairy park development | improving milk production through Dairy Parks Establishment | Ksh. 22,000,000.00 | 2018-09-03 | 2019-01-01 | Ongoing |
County | Branding of brochure materials | To develop branding materials | Ksh. 10,000,000.00 | 2021-09-30 | 2022-06-30 | Planned |
County | Production of county magazine | To strengthen information among stakeholders | Ksh. 8.00 | 2021-04-05 | 2021-06-30 | Ongoing |
County | lightening arrestors installation | to enhance disaster preparedness, mitigation and response | Ksh. 6,400,000.00 | 2017-06-07 | 2022-08-08 | Under Procurement |
County | Busia county enterprise development fund | To increase allocation of credit and disbursements | Ksh. 500,000,000.00 | 2023-06-14 | 2023-06-15 | Ongoing |
County | Promotion of Improved governance and management on cooperatives | To offer training on cooperative beneficiaries | Ksh. 40,000,000.00 | 2018-10-29 | 2023-05-16 | Ongoing |
County | Acquisition of quality marks of standardization | Acquisition of quality marks of standardization | Ksh. 14.00 | 2018-10-29 | 2021-05-18 | Planned |
County | Establishment of Cooperative development training institute | To construct cooperative development training institutes | Ksh. 250.00 | 2018-10-29 | 2019-05-08 | N/A |
Sub County | Operationalization of the fish fillet plant | To operationalize the fish fillet plant | Ksh. 38.00 | 2020-08-11 | 2021-06-09 | Pre Procurement |
County | Establishment of fish filleting plant | Ksh. 30.00 | 2020-11-10 | 2021-05-13 | Ongoing | |
County | Installation of rice packaging machines | To purchase rice packaging equipment | Ksh. 30.00 | 2018-10-29 | 2019-05-20 | Planned |
County | Starch processing plant | To construct cassava processing factories | Ksh. 25.00 | 2018-10-29 | 2019-05-20 | Ongoing |
County | Cassava processing plant construction | To purchase milk value chain plant and machinery | Ksh. 8.00 | 2018-08-07 | 2019-03-05 | Ongoing |
County | construction of office block at teso south | create more working space | Ksh. 8,000,000.00 | 2018-07-03 | 2022-06-30 | Planned |
County | Construction of sesame oil processing plant | Construction of sesame processing plant | Ksh. 9.00 | 2018-09-04 | 2019-04-03 | N/A |
County | construction of service bay | limited working space | Ksh. 6,000,000.00 | 2018-07-03 | 2022-06-30 | Planned |
County | Rehabilitation of cotton ginneries | rehabilitate cotton ginneries | Ksh. 180.00 | 2018-08-08 | 2020-04-08 | Ongoing |
County | construction of sanitary areas | to improve the available sanitary areas | Ksh. 4,500,000.00 | 2018-07-03 | 2021-06-30 | Planned |
County | Purchase of Milk plant and Machinery | To purchase milk coolers | Ksh. 70.00 | 2018-07-05 | 2022-06-08 | Planned |
County | audio and video documentation of county projects | to enhance visibility of county projects to stakeholders and the general public | Ksh. 2.00 | 2021-07-15 | 2021-10-14 | Planned |
County | construction of perimeter wall | securing the working environment | Ksh. 100,000,000.00 | 2018-07-05 | 2021-06-30 | Planned |
County | community radio talk shows | Community radio talk shows | Ksh. 2.00 | 2021-05-03 | 2021-07-30 | Ongoing |
County | Develop a spatial plan | to enhance prudent and sustainable land use in the county | Ksh. 105,000,000.00 | 2017-02-22 | 2021-08-22 | Terminated |
County | restructure and update of the county website | To strengthen information among stakeholders | Ksh. 1.00 | 2020-04-14 | 2022-09-01 | Completed |
County | purchase of uniforms | provision of working tools and uniforms | Ksh. 5,500,000.00 | 2018-07-01 | 2022-06-30 | Completed |
County | complaints and compliments redress | public complaints and compliments register | Ksh. 100,000,000.00 | 2018-07-01 | 2020-06-30 | Ongoing |
County | Training of County staff | Staff training | Ksh. 100,000,000.00 | 2018-07-02 | 2022-06-30 | Ongoing |
County | Development of County staff organization structure | Develop county organization structure | Ksh. 10,000,000.00 | 2018-07-02 | 2019-06-28 | Planned |
County | Development of departmental strategic plan | Develop departmental strategic plan | Ksh. 5,000,000.00 | 2018-07-02 | 2022-06-30 | Completed |
County | Human Resource Policies and laws and regulations formulation and enforcement | Develop staff rationalization policy | Ksh. 5,000,000.00 | 2018-07-02 | 2022-06-30 | Ongoing |
County | upgraded gravel roads to bitumen standards | put in place bitumen roads | Ksh. 6,000,000,000.00 | 2019-07-08 | 2022-06-30 | Ongoing |
County | identification of risks | to enhance disaster preparedness, mitigation and response | Ksh. 5,000,000.00 | 2017-08-07 | 2019-07-08 | Pre Procurement |
County | Holding of peace forums | to enhance disaster preparedness, mitigation and response | Ksh. 10,000,000.00 | 2017-08-07 | 2022-06-01 | Planned |
County | establish trailer bus and taxi parks | to construct trailer bus and taxi parks | Ksh. 42,000,000.00 | 2018-07-05 | 2022-06-30 | Ongoing |
County | Dredging of roads | to enhance disaster preparedness, mitigation and response | Ksh. 30,000,000.00 | 2017-08-07 | 2022-06-01 | Pre Procurement |
County | purchase of utility vehicle | Easy coordination and movement | Ksh. 6,500,000.00 | 2020-01-02 | 2020-06-30 | Under Procurement |
County | Construction of dams | to enhance disaster preparedness, mitigation and response | Ksh. 50,000,000.00 | 2017-08-07 | 2022-06-08 | Planned |
County | establishment of service lane | to construct service lanes | Ksh. 18,000,000.00 | 2019-07-05 | 2022-06-30 | Planned |
County | Purchasing of fire engine | To enhance disaster preparedness, mitigation and response | Ksh. 20,000,000.00 | 2017-08-07 | 2022-06-08 | Ongoing |
County | Rehabilitation of buildings | to enhance disaster preparedness, mitigation and response | Ksh. 50,000,000.00 | 2017-08-07 | 2022-06-08 | Pre Procurement |
County | Business Training | Development of business training forums | Ksh. 50.00 | 2018-07-17 | 2022-01-16 | Ongoing |
County | Assistance of victims | to enhance disaster preparedness, mitigation and response | Ksh. 100,000,000.00 | 2017-08-07 | 2022-06-01 | Ongoing |
County | Purchase of Road construction equipments | purchasing of road construction equipment | Ksh. 420,000,000.00 | 2021-07-05 | 2022-06-30 | Planned |
County | Provision of shelter units | to enhance disaster preparedness, mitigation and response | Ksh. 500,000,000.00 | 2017-08-07 | 2022-06-08 | Pre Procurement |
County | provision of uniforms and working uniform | provision of working tools and uniforms | Ksh. 5,500,000.00 | 2018-07-01 | 2022-06-30 | Ongoing |
County | Development of Modern Markets | Construction of modern markets | Ksh. 364.00 | 2018-07-17 | 2022-06-16 | Planned |
Ward | Routine maintenance of Roads | routinely maintenance of roads | Ksh. 15,000,000.00 | 2018-07-02 | 2022-06-30 | Ongoing |
County | Purchase of boats | to enhance disaster preparedness, mitigation and response | Ksh. 10,000,000.00 | 2017-08-07 | 2022-06-08 | Pre Procurement |
County | development of disaster rescue centers | to enhance disaster preparedness, mitigation and response | Ksh. 5,000,000.00 | 2017-08-07 | 2018-06-06 | Pre Procurement |
County | Inspection of buildings | to enhance disaster preparedness, mitigation and response | Ksh. 30,000,000.00 | 2017-08-07 | 2022-06-08 | Ongoing |
County | training of county enforcement officers | to equip county enforcement with knowledge of security and bylaws to enable them perform their duties effectively | Ksh. 20,000,000.00 | 2018-07-01 | 2022-06-30 | Planned |
County | Purchase of equipment and supplies | To enhance disaster preparedness, mitigation and management | Ksh. 500,000,000.00 | 2018-08-08 | 2022-06-01 | Ongoing |
County | Investment Promotion | Embark on the development of the industrial parks | Ksh. 500.00 | 2018-06-07 | 2019-06-05 | Planned |
County | hiring and training of enforcement officers | to equip the enforcement officers with basic knowledge that will keep them going in their daily activities | Ksh. 100,000,000.00 | 2018-07-01 | 2022-06-30 | Planned |
County | Community outreach | To enhance disaster preparedness, mitigation and response | Ksh. 50,000,000.00 | 2018-08-08 | 2022-06-08 | Ongoing |
County | Conducting of training and drills | to enhance disaster preparedness, mitigation and response | Ksh. 20,000,000.00 | 2017-08-07 | 2022-06-01 | Ongoing |
County | Sesame processing plant construction | Construction of sesame processing plant | Ksh. 9.00 | 2018-08-08 | 2019-03-01 | Planned |
County | construction of modern material testing laboratories | To improve working environment | Ksh. 9,000,000.00 | 2019-08-16 | 2020-10-12 | Planned |
County | Sensitization forums | to enhance disaster preparedness, mitigation and response | Ksh. 2,000,000.00 | 2017-08-01 | 2022-06-01 | Ongoing |
County | Export Promotion | Development of trade fairs across all sub counties | Ksh. 20.00 | 2018-07-17 | 2022-06-16 | Planned |
County | Purchase of Milk plant and machinery | To purchase milk value chain plant and machinery | Ksh. 70.00 | 2018-07-05 | 2022-06-04 | Planned |
County | Equipping of disasters centers | to enhance disaster preparedness, mitigation and response | Ksh. 50,000,000.00 | 2010-07-08 | 2019-07-08 | Ongoing |
County | construction of Storm water management and flood control | establish storm water infrastructure | Ksh. 400,000,000.00 | 2020-02-10 | 2021-06-15 | Ongoing |
County | Laying of cabros, canopies and walkways | Improvement of pathways | Ksh. 0.00 | 2021-08-06 | 2022-06-16 | Ongoing |
Flagship Project | Programme | Objective | Planned start date | Planned end date |
---|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
![]() |
|
Malaba bus park funded by County governemnt of Busia |
Date : 2021-12-22 11:12:57 |
malaba bus park that was rehabilitated at a tune of ksh 7million is completed.It is expected to serve about 150 matatus per day and over 100 traders.This will create atleast 2000 jobs both directly and indirectly. |
|
![]() |
|
Tarmacking of town roads |
Date : 2021-12-22 12:12:58 |
The County Government of Busia has undertaken the upgrading to bitumen standards major roads within the Central Business District to spur trade in the border county. The roads include Assembly-Milimani Loop-Chief’s Office and Floman Lane, Governor’s office ~ Huduma Centre road and about 600metres road network from YMCA turn off-department of water offices to link with Busia-Kisumu Highway at Amukura house junction. |
|
![]() |
|
SOKO POSTA MARKET RENOVATION |
Date : 2021-12-27 07:12:45 |
Soko Posta Market was constructed in the heart of Busia town. The renovation of Soko Posta has been a game changer in the progression of the trade activities within the county. With the development of the Soko Posta, many traders within the county have found a place to trade seamlessly without much interference from both the environmental and human hazards. Before the construction of Soko Posta, many traders were forced to brace harsh conditions like the scorching sun to carry out the trading activities. The existing market structures at Busia town were largely not enough to hold the traders from within the county and outside. The effect of the construction of Soko Posta has largely been the improved conditions under which people do business,and also catalysing the trade activities within Busia town. An analysis of the of traders within Busia municipality shows that after the renovation of the market, there was a significant increase in the number of the traders which has enhanced the economic activities of the people. |
|
![]() |
|
CONSTRUCTION OF MULUKHONI MARKET |
Date : 2021-12-28 07:12:04 |
One of the central economic activities within Busia county has always been selling of the fresh produce. Fresh produce has gained more popularity within the county because of the conducive weather conditions that have allowed farmers to grow more. The construction of Mulukhoni market forms one of the activities that has helped in spearheading the increased farming of fresh farm produce. The completion of Mulukhoni was well received from the people living around this area. Previously, the existing market structures were dilapidated and they did not support clean provision of the farm produce to the consumers. The construction of Mulukhoni market has therefore enhanced the trading activities within the area. An analysis of the number of people selling commodities has increased owing to the fact that the market has enabled people to have a centralized place to carry out trading activities. Ideally, the construction of the Mulukhoni market has helped to increase the revenue collection since the traders are levied market and stall fees. |
|
![]() |
|
COUNTY DRILLING RIG |
Date : 2021-12-28 09:12:19 |
The acquisition and operationalization of a County Drilling Rig was was aimed at enhancing operations and maintenance of the over 2,000 drilled boreholes that have not been serviced for the last 30 years. The move by the County Government of Busia to purchase modern water driling rig has reduced the delays associated with outsourcing the rig and greatly increased water accessibility in the county whose coverage currently stands at 56 percent . Furthermore,the cost of drilling water has now reduced and water has been availed to areas which used to experience scarcity. |
|
![]() |
|
Construction of ECDE classrooms |
Date : 2021-12-28 10:12:54 |
The Directorate of Early Childhood Development has constructed a total of 249 Classrooms across the county.improvement of infrastructure in our ECDE Centres is one of the key programs underlined in Busia County CIDP 2018-2022, where's it's main objective was to Ensure all boys and Girls access to quality ECDE education. Some of the Classrooms constructed and in used are;Busagwa ECDE classrooms in Bunyala sub-county,Sifugwe ECDE. In Bunyala sub-county, Mabunge ECDE classrooms in Nambale Sub-county,Luliba ECDE classrooms in Samia Sub-county,Akichelesit ECDE classrooms in Teso North Sub-county. Etc.. This program has really improved Enrollment in our ECDE Centres and it has also provided a safe and child friendly environment to our children. |
|
![]() |
|
Construction of Modern Sanitation Blocks in ECDE Centres |
Date : 2021-12-28 11:12:32 |
In bid to improve sanitation in our ECDE Centres the Directorate has constructed 32 pit latrines in public ECDE Centres. Example of modern sanitation blocks constructed in our ECDE Centres are; pit Latrines at Akiriamasit primary school, Pit latrines at Kidek primary school etc. This program has helped in providing a safe and child friendly learning environment to our kids. |
|
![]() |
|
Purchase of Furnitures ,Teaching and Learning Materials in ECDE Centres |
Date : 2021-12-28 11:12:50 |
The Directorate has 18640 plastic chairs and 45 tables in all public ECDE Centres. Teaching and Learning Materials have also been purchased for all public ECDE Centres that include 454 text books per activity area and per level totalling to 5,448 pieces. In compliance with competency based Curriculum (CBC) the department has procured curriculum designs for all public ECDE Centres in the County. |
|
![]() |
|
Improved Enrollment in ECDE Centres |
Date : 2021-12-28 11:12:53 |
Recruitment of trained ECDE teachers and improvement of infrastructure has enhanced enrolment from 44227 in the year 2014 to 54449 in the year 2020 .The quality of teaching in Public ECDE Centres has also improved thus accelerating access, retention and transition rate to Grade 1 |
|
![]() |
|
Infrastructure Development in Vocational training Centres. |
Date : 2021-12-28 12:12:55 |
The Directorate of Vocational Training is Mandated to undertake improvement of infrastructures of all VTCs Centres so as to help develop and promote quality and relevance in VTCs for skills development. Some of the VTCs Centres constructed and in use are; Dirakho VTC, Namasali VTC, Nangina VTC in Samia Sub-county, Nambale VTC in Nambale Sub-county, Katakwa VTC in Teso North Sub-county, Nasira VTC in Matayos Sub-county ,Igara VTC in Teso-south Sub-county etc. In total the County Government has constructed 25 VTCs Centres across the county |
|
![]() |
|
Infrastructure Development- Construction of Administration Blocks and workshops in VTC Centres. |
Date : 2021-12-28 12:12:49 |
For an empowered and self relient youth the Directorate continued to construct and complete Administration Blocks and Workshops in VTCS across the county. Example are; Okisumo VTC in Teso-south Sub-county, Angurai VTC in Teso-North Sub-county, Ganga VTC in samia Sub-county etc |
|
![]() |
|
Equipping of Vocational Training Centres |
Date : 2021-12-28 12:12:49 |
In order to create an enabling environment for trainees, the County Government of Busia has donated a number of equipment to all 25 VTCs across the county. This equipment included sewing machines, Motor vehicle live engine,hair dress equipment, wood lathe machine, concrete mixer, poker vibrator, computers and other ICT equipments among others. This Equipments has enabled trainees to have practical experience of what they're instructed and have also led to production of fully baked technicians. Availability of this Equipments in VTCs has led to increased enrolment since more trainers are witnessing the relevance of their training to the job market. |
|
![]() |
|
Staff Training and Capacity Building |
Date : 2021-12-28 12:12:40 |
Capacity Building program are important as a variable to Guarantee the quality of a governance and effectiveness of the service delivery of public organization's. To this effect, the training is aimed at promoting good governance, transparency, and accountability and management of our Vocational Training Centres. The Directorate has made deliberate efforts to train VTCs principals and BOMs in matters governance and financial management. |
|
![]() |
|
Busia County Revolving Scheme |
Date : 2021-12-28 01:12:18 |
The county Government of Busia did partner with HELB to offer loans and scholarships to students from Busia County pursuing higher education in a bid to improve literacy level , retention of students in tertiary institution and build capacity in the county. Service contract was signed in the 4th June,2015. The products targets students pursuing higher education in universities, middle level institutions and TVETs. Through the Busia Undergraduate products which was initiated in 2015, the county Government has injected Kshs 55 Million .so far 2332 students have benefitted. The county Government of Busia through Busia Afya Elimu products elimu is supporting 139 students taking various courses in KMTC. Through Busia County Scholarships targeting students pursuing; law, Medicine and Engineering ,the county is currently supporting 64 students in full scholarships. |
|
![]() |
|
Education Support Scheme |
Date : 2021-12-28 01:12:18 |
To Cushion the Financially disadvantage against adverse financial difficulties and to ensure that no eligible students drop out of secondary school, university or college due to inability to finance their education, the department has continued to fund them through the established Busia County Education Support Scheme. Since 2013 a number of students have been supported through their secondary and higher education, with a good number having completed their higher education and are currently serving and creating an impact at different levels in society |
|
![]() |
|
NAMBALE SUB COUNTY MALE WARD |
Date : 2021-12-28 09:12:35 |
The male ward at Nambale Subcounty is complete and will help solve the issue of scarcity of wards at the hospital |
|
![]() |
|
MATERNITY WARD AT PORT VICTORIA SCH |
Date : 2021-12-28 09:12:03 |
Maternity Ward at Port Victoria SCH is now complete and will assist reduce the distance expectant mothers used to cover and hence reduce Maternal Mortality |
|
![]() |
|
High Mast Lights |
Date : 2021-12-29 07:12:42 |
The County Government of Busia under the leadership of H.E. Sospeter Ojaamong has made efforts to improve security and living standards of Busia residents by erecting high mast lights across Busia Municipality under the Kenya Urban Support Programme. The six, 30-metre high mast flood lights have been placed at strategic locations across the Municipality of Busia namely; YMCA, Bus Park, Stadium, Public works offices, Ojamii and Bulanda Primary Schools respectively. The lights have ensured more hours of doing business, enhanced security in both residential and commercial areas within the Municipality and are serving approximately 19,800 people. The lights have increased the number of small and medium sized traders by approximately 2,000 and have also transformed the Municipality into a 24-hour economy thus increasing revenue collection tremendously.
|
|
![]() |
|
tractors and skip bins |
Date : 2021-12-29 07:12:19 |
The County Government of Busia under the leadership of H.E. Sospeter Ojaamong has made efforts to create a clean and conducive living environment to all Busia residents by procurring tractors and skipbins for garbage collection. Further more,as part of solid waste management measures, the directorate in collaboration with marginalised groups (Youth, Women and People living With Disabilities-PWDs) has constructed garbage collection points (receptacles) in major towns to complement environmental waste management strategies already put in place by Municipality management. |
|
![]() |
|
BCRH ACCIDENT AND EMERGENCY UNIT |
Date : 2021-12-29 11:12:16 |
The unit is a three storey building and is designed to strengthen emergency preparedness as well as offer efficient and professional services to residents. It houses the following units; Casualty Unit, Radiology block, Serious Injuries and Xray sections, ICU beds, High Dependency Unit, Oxygen Plant, Laboratory section, Renatal Unit and the hospital main Administration block. This will enhance access to medical care and reduce cost of medication to the residents of Busia. |
|
![]() |
|
KOCHOLIA MALE WARD |
Date : 2021-12-29 11:12:31 |
The construction of modern 30-bed male ward at Kocholia Sub-County Hospital in Teso North Sub County has reduced congestion at the facility by increasing bed space for inpatients. |
|
![]() |
|
BCRH MATERNITY UNIT |
Date : 2021-12-29 11:12:39 |
The Ultra-modern 60- bed maternity and new born unit at the Busia County Referral Hospital (BCRH) which is under construction and currently at around 60% completion will cushion expectant mothers who previously have been exposed to difficulties associated with delivery. This will lead to reduction in maternal and neonatal deaths. The unit will also increase capacity for delivering mothers to be attended at the facility. |
|
![]() |
|
Oxygen Plant at BCRH |
Date : 2021-12-29 07:12:22 |
Oxygen plant installed at Busia County Referral Hospital with the production capacity of 250 litres per minute. This ensures availability of oxygen at the facility's wards, theatres and ICU. It has also reduced expenditure costs on procurement of oxygen of about shs 2.9 Million annually. |
|
![]() |
|
Face lifting of county Headquarters |
Date : 2021-12-30 05:12:33 |
The directorate has successfully completed the facelift of county headquarters that majorly included repainting. |
|
![]() |
|
HYBRID WATER SYSTEMS |
Date : 2021-12-30 09:12:44 |
The County Government of Busia has continued to embrace hybrid systems to have water pumped using solar energy to complement electricity use. The move has borne fruit with Mundika Water Supply joining a number of similar water schemes already using hybrid pumping systems that has enabled access of water to about 65,000 people, an equivalent of 7,500 households in Matayos and Teso South Sub Counties within Busia Municipality.Project is now meeting 3,500 cubic metres of production of its initial design of covering 7,500 cubic metres per day. The scheme used to attract a monthly bill of over Ksh.3 million but with the introduction of the new system, the County Government of Busia is saving 40 per cent in bills paid to utility company Kenya Power. Residents are now enjoying reliable water supplies unlike previously when they could go for a couple of days without water owing to power cuts and blackouts. |
|
|
|
SOLARIZATION OF WATER PUMPING SYSTEMS |
Date : 2021-12-30 10:12:58 |
Solarization of water Pumping systems in the county has been embraced to reduce on the cost of production. This targets high yielding boreholes and major water supplies. This has been achieved at Mundika Water supply in Matayos, Madivira and Alema in Samia, Khwirale in Nambale, Akibui in Teso North, Lugulu and Bwaliro in Butula, Machakus in Teso South and Bulemia in Bunyala Sub counties. These are a few sampled from every sub county among many others developed in the entire county. |
|
![]() |
|
HANDPUMPS INSTALLATION |
Date : 2021-12-30 10:12:58 |
The County Government of Busia has increased access of safe and clean water from 56% to 60%. This has led to reduced distance and time for collecting water, decrease in water-borne disease burden and enhanced the fight against covid-19. These achievements have been made possible through the following interventions;
|
|
![]() |
|
SEWERAGE SERVICES |
Date : 2021-12-30 11:12:19 |
Malaba Sewerage and Water project Malaba has benefited from Ksh 300 million sewerage project and Ksh600m water project that is set to address water and sewerage challenges facing the border town and its environs. The two projects are funded by the African Development Bank in partnership with the County and National governments. The sanitation component project included the construction of 4,000 cubic metres per day new sewerage treatment plant for Malaba Town and construction of four ablution blocks Model 3D at Amoni, Kocholia, Onyunyur and Okima market in Malaba town. The ablution blocks were part of the Corporate Social Responsibility by the Chinese contractor who won the bid to construct the sewerage component The county acquired two exhausters through the Lake Victoria Environment Management Programme under the Ministry of Environment to support Liquid Waste Management. This is still a big challenge as population within the areas covered with Sewer Lines has exponentially grown against the original design sizes. Currently, the urban sewer system in Busia town is under rehabilitation. In relation,studies have been carried out for the expansion of sewerage treatment works in Busia town and construction of a sewerage system in Nambale town.Once the project is complete the three towns will open up as far as urban development is concerned. |
|
![]() |
|
WATER BOWSERS |
Date : 2021-12-30 12:12:32 |
The three Water bowsers procured by the County Government have made it possible to deliver clean and safe water to the underserved communities during emergency period. The areas that have benefitted from this intervention include Bunyala, Samia, Teso North and Teso South Sub Counties. The ravaging floods in March, 2020 that was occasioned by Lake Victoria backflow saw the Department of Water heed to Governor H.E Sospeter Ojaamong to avail the bowsers to supply water to the victims of the floods until the condition subsides |
|
![]() |
|
ROADS: Upgrading of roads to bitumen standards; Funyula town |
Date : 2022-01-03 11:01:43 |
|
|
![]() |
|
ROADS: Upgrading of roads to bitumen standards ; Bumala town |
Date : 2022-01-03 07:01:25 |
|
|
![]() |
|
CAGE FARMING |
Date : 2022-01-03 08:01:57 |
Open water fish cage enterprise is one of the flagship projects In Busia County that aims at providing alternative livelihood to fishers with the goal of reducing fishing pressure in Lake Victoria waters of Busia. Under this farming enterprise, Busia County Beach Management Unit (BMU) Network with the support from Busia County Government initiated an educational program dubbed Busia BMU NETWORK EDUCATION SCHOLARSHIP. In the year 2020, the program supported 214 pupils transition to form one. In 2021, a further 240 pupils joining form one were supported by the program. This brings the total Number of students supported from Budalangi and Funyula sub counties to 454.
|
|
![]() |
|
Refurbishment of Busia stadium and purchase of sports equipment |
Date : 2022-01-04 07:01:00 |
Refurbishment of Busia Stadium The Stadia is used to serve as a venue for local teams to participate and compete in different games. The stadium provides space for hire and also allow other teams from outside Busia to hire and favourably compete in different sporting activities. Construction of the main stand at the Busia stadium.
|
|
![]() |
|
Energy: Connections to the Mains grid and solar micro grids |
Date : 2022-01-04 08:01:57 |
|
|
![]() |
|
CO-OPERATIVE ENTERPRISE DEVELOPMENT FUND |
Date : 2022-01-04 08:01:49 |
The co-operative enterprise fund was established by the county government of Busia through the act of the county assembly in 2014. Since its establishment, the co-operative enterprise development fund has been revolutionary in the provision of the low interest loans to the various cooperative institutions established within Busia county.Specifically, the fund has been able to provide funds for various activities within the county. Among the central activities which the fund has supported included reviving and initiating cooperative societies, facilitating cooperatives to market there produce both in local and international markets, and also providing funds to low income and vulnerable groups for business. Through the fund therefore, 145 registered cooperatives have been established. Among them,68 Boda boda saccos have been formed. In Busia, Boda bodas forms a larger percentage of sources of income among the youth. Through the saccos, the boda boda operators have been able to have saccos where they can easily borrow loans in case of the emergiences. Ideally, 36 agricultural farmers and marketing saccos have been formed. Notebly, Busia county has a huge percentage of the population that depend on farming as a source of livelihood. The establishment of the 36 agricultural farmers and marketing saccos has been important in establishment of an avenue where they can save and also borrow money. The directorate has so far spend ksh 106 million to fund 92 of the cooperative societies. |
|
![]() |
|
CREATION OF WATER PANS |
Date : 2022-01-04 08:01:46 |
Ongaroi water pan Ongaroi water pan was constructed as a drought mitigation strategy and for provision of water for irrigation and domestic use. The project was implemented by the County Government of Busia through the directorate of Irrigation and Land Reclamation. Pipeline extension was done to the nearest farms downstream hence they are able to easily access irrigation water. Several crops are grown and the beneficiaries have expressed satisfaction for their livelihood has improved About 50 youths have been engaged in farming directly. Demonstration plots will be set up and used as training sites for the farmers. Tree nurseries will be established to enable farmers plant and conserve the environment while marketing of farmer produce will be easy because of pooling resources together by the farmers. Further, the directorate prides itself of 50 small dams and water pans cross the county that have a potential of irrigating 2,200 Ha and providing water for Livestock. |
|
![]() |
|
support of sporting activities and purchase of sporting equipment |
Date : 2022-01-04 08:01:28 |
The ward based sporting activities was supported and sporting equipment was purchased in Matayos South Ward The cost involved amounted to 600,000 to support of sporting activities and purchase of sporting equipment |
|
![]() |
|
Bamboo Promotion along Lake shores |
Date : 2022-01-04 08:01:14 |
The growth of Bamboo plantations along major rivers and water catchment areas within the County has promoted flood control, riverbank restoration, soil, and water conservation. Specifically, areas such as Madivira water catchment, Sigiri Bridge, and Odioi have benefited significantly from bamboo planting exercises facilitated by the County Government. Protas Wafula from Khainga Village near Sigiri Bridge said Bamboo plantation has helped to control River Nzoia’s water levels and this prevents it from breaking its banks. He noted that the County Government should be appreciated for this bold move. “While the project is very noble, what is required is the fencing and branding to enable the community understand the brain behind the project,” he said. In addition, the County government has partnered with local farmers and encouraged them to adopt the planting of bamboo seedlings in their farms and also establish bamboo tree nurseries. This is geared towards enhancing environmental conservation, promoting food security as bamboo shoots can be harvested for food, and economic empowerment of the community members. |
|
![]() |
|
FISH TRANSSHIPMENT AND AUCTION CENTRE |
Date : 2022-01-04 09:01:26 |
With the aim of improving fish handling and hygiene in the market coupled with increasing customer confidence and thereby boosting fish sales in the County, the County Government of Busia through Kenya Devolution Support Program managed to set up a modern regional fish Transshipment Market at Cross Border fish market that will Receive and transship fish from Lake Turkana, Lake Victoria, Lake Kyoga Uganda and Fish Farms, Supply Urban centers in Kenya, DRC Congo, Uganda, Southern Sudan and Rwanda and Handle Fish Valued at Kshs 2 Billion annually hence leading to increase in Business |
|
![]() |
|
County Nutrition Action Plan (CNAP) |
Date : 2022-01-04 10:01:35 |
Busia County became the first county in Kenya to launch its CNAP 2018-2023 in the presence of Governor, H.E Sospeter Ojaamong, Nutrition International President and CEO- Joel Spicer, Nutrition International Country Director Martha Nyagaya and Busia Deputy Governor- Moses Mulom. The Busia CNAP was developed by the department of Health and Sanitation in partnership with Nutrition International (NI) and other implementing partners. It is expected to serve as a tool for coordination, implementation and mobilization of resources for nutrition intervention within the department and other nutrition sensitive line ministries and departments among them; agriculture, education, water, gender and social services and children's department. |
|
![]() |
|
Odengero Dispensary in Teso South |
Date : 2022-01-04 11:01:22 |
This is one of the 21 new dispensaries commissioned since 2014. Others include; Apatit, Akiriamasi and Akobwait in Teso South; Kamuria, Aloet and Akolong in Teso North; Busagwa and Khajula in Bunyala Sub county; Neela, Namusala, Mafubu and Igula in Butula; Musokoto, Segero, Kapina, Esidende and Mudembu in Nambale; Wakhungu, Kabuodo and Mukonjo in Samia sub county and Mayanje, burumba, Muyafwa and Buyosi in Matayos. Construction and Operationalization of these dispensaries has enhanced access to health services and thus reduced cost of medication to the residents |
|
![]() |
|
WAKHUNGU HATCHERY |
Date : 2022-01-05 09:01:37 |
To ensure supply of quality and affordable fish fingerlings, The County Government through Kenya Climate Smart Agriculture Project revived Wakhungu hatchery to produce quality fingerlings. To this end, the County has fully functioning fish hatcheries in Wakhungu and its satellite nursing in Okerebwa with a production capacity of 1.5million fingerlings annually which are readily available |
|
![]() |
|
DAIRY HEIFER PROGRAM |
Date : 2022-01-05 09:01:59 |
The county government rolled out Dairy Heifer Program where it procures high quality heifers and issues them to farmer groups. This is done through the county ward development fund projects and has seen over 1,400 heifers distributed in the entire County. Over seventy per cent of the heifers have calved at least once and passed on to the next beneficiary within the groups. This coupled with up scaled feed and fodder production has seen marked improvements in milk production. |
|
![]() |
|
FARM MECHANIZATION |
Date : 2022-01-05 10:01:05 |
With the availability of 21 tractors purchased by the County Government, ploughing services has enhanced land under cultivation. This has increased timeliness and efficiency in land preparation, hence increased crop production. The acreage of new land that has been opened up for cultivation is 7000 acres and thus totalling to 46,800 acres ploughed by the county tractors from 2013-2021.The use of tractor subsidy has also saved the ploughing cost by 50% for vulnerable farmers |
|
![]() |
|
Community radio talk shows |
Date : 2022-01-05 11:01:34 |
Chief Officer, ICT& Communication Lydia Nabwire during a radio talk show at Emuria FM
|
|
![]() |
|
reconstruction and update of the county website |
Date : 2022-01-05 11:01:36 |
Busia Governor, H.E Sospeter Ojaamong launchin g the newly revamped county webstite |
|
![]() |
|
Support of sporting activities in Nambuku/Namboboto ward as ward based projects |
Date : 2022-01-06 03:01:12 |
Support of sporting activities in Nambuku/Namboboto ward as ward based projects |
|
![]() |
|
SCHOOL GREENING PROGRAMME |
Date : 2022-01-07 10:01:11 |
School greening programme-As a means of carbon offset afforestation,the county has joined forces with both mandated and co-opted county level and national stakeholders such as Kenya Forestry Service and other like minded stakeholders in conducting tree planting activities in the selected public schools during the rainny seasons. The rationale of selecting schools is to allow school children to learn key issues of the environment thus inculculating positive attitude skills,knowlede and behaviour change towards carinig for the environment.The programme continues to be a success and has witnessed the planting of thousands of tree seedlings since inception in the following learning institutions: Primary schools Odioi,Buringi,Burumba,Angorom,Mundulusia,Buringala,Esirisia and Odiado,St.Joseph Girls,Masindebale,Nambale AC,Nangina,Nyakhobi,Chemasiri,Alungori,Kolanya Boys,Okiporo,Aloete,,Kakimer,Adanya. Secondary schools:Our Lady of Mercy,Mundika High,Township,Buyende,Igara,Sigalame,Segero,Amagoro Girls,Lwanya Girls Tertiary:Alupe University,Busia Youth Polytechnic,Nambale Youth Polytechnic,KMTC-Teso Cumpus |
|
![]() |
|
Energy: street lighting |
Date : 2022-01-11 06:01:53 |
As a way of working in synegy, the directorate of energy and that of urban planning in collaboration do installation street lights in major town centers. This goes a long way in:
|
|
![]() |
|
Public Works: Construction of box Culverts |
Date : 2022-01-11 07:01:43 |
|