Ward |
Rehabilitation and expansion of Ebusakami community water project |
To Increase access to safe and clean water |
Ksh. 2,800,000.00 |
2024-02-05 |
2024-05-31 |
Terminated |
Ward |
Expansion of Emululu Water Project |
To Increase access to safe and clean water |
Ksh. 8,000,000.00 |
2024-02-05 |
2024-05-31 |
Terminated |
County |
SUPPLY AND DELIVERY OF WATER FITTINGS FOR LAST MILE CONNECTIVITY & REHABILITATION OF EMANYINYA BOREHOLE |
To Increase access to safe and clean water |
Ksh. 5,000,000.00 |
2023-02-15 |
2023-08-14 |
Under Procurement |
County |
LAST MILE CONNECTIVITY IN WATER SCHEMES |
To Increase access to safe and clean water |
Ksh. 20,000,000.00 |
2023-02-15 |
2023-08-14 |
Under Procurement |
County |
MAINTENANCE AND REPAIR OF WATER PUMPING MACHINERIES, EQUIPMENT AND ELECTRICAL SYSTEMS IN WATER SUPPLUIES |
To Increase access to safe and clean water |
Ksh. 3,000,000.00 |
2023-02-16 |
2023-05-15 |
Under Procurement |
County |
SOLARIZATION OF SMALL WATER SUPPLIES IN VIHIGA COUNTY |
TO IMPROVE WATER SUPPLY PRODUCTION SUSTAINABILITY |
Ksh. 15,000,000.00 |
2023-02-15 |
2023-08-14 |
Under Procurement |
Ward |
PIPE LAYING FROM BIG BEN TO MULWAKHI PRIMARY SCHOOL & FROM GOODWILL TO MUNYAMBUKO |
To Increase access to safe and clean water |
Ksh. 2,600,000.00 |
2022-04-06 |
2022-06-06 |
Completed |
Ward |
LUSENGELI - GAVUDUNYI PIPELINE IN WODANGA WARD |
To Increase access to safe and clean water |
Ksh. 3,000,000.00 |
2022-04-28 |
2022-07-27 |
Ongoing |
County |
VIHIGA CLUSTER WATER RETICULATION PROJECT PHASE II |
To Increase access to safe and clean water |
Ksh. 20,000,000.00 |
2022-04-19 |
2022-10-18 |
Ongoing |
Ward |
CONSTRUCTION OF 50M3 ELEVATED TANK AT WEMILABI WARD |
To Increase access to safe and clean water |
Ksh. 4,000,000.00 |
2022-05-30 |
2022-08-29 |
Ongoing |
Sub County |
REHABILITATION OF HAMISI WATER SUPPLY |
TO REHABILITATE AND AUGMENT EXISTING WATER SUPPLIES |
Ksh. 5,200,000.00 |
2022-04-12 |
2022-07-11 |
Completed |
Ward |
BANJA WATER PIPELINE |
To Increase access to safe and clean water |
Ksh. 1,500,000.00 |
2022-03-08 |
2022-06-07 |
Completed |
Ward |
SUPPLY AND INSTALLATION OF SUBMERSIBLE WATER PUMPSETS AT CHANGO AND VIHIGA WATER SUPPLIES |
TO REHABILITATE AND AUGMENT EXISTING WATER SUPPLIES |
Ksh. 2,500,000.00 |
2022-03-03 |
2022-06-02 |
Completed |
Ward |
CONSTRUCTION OF ELEVATED STEEL TANK AT CHANGO WATER PROJECT |
TO REHABILITATE AND AUGMENT EXISTING WATER SUPPLIES |
Ksh. 5,000,000.00 |
2022-04-12 |
2022-07-11 |
Completed |
Ward |
SOUTH MARAGOLI WATER PIPELINES EXTENSIONS |
To Increase access to safe and clean water |
Ksh. 2,000,000.00 |
2022-03-08 |
2022-06-08 |
Completed |
Ward |
CONSTRUCTION OF HIGHRISE TANK AND LAYING OF PIPELINES IN EMABUNGO WARD |
To Increase access to safe and clean water |
Ksh. 3,000,000.00 |
2022-06-03 |
2022-09-02 |
Ongoing |
Ward |
CONSTRUCTION O BUSALI WATER PROJECT |
To Increase access to safe and clean water |
Ksh. 5,000,000.00 |
2022-03-21 |
2022-09-20 |
Pre Procurement |
Ward |
REHABILITATION OF MUHUDU WATER PROJECT |
To Increase access to safe and clean water |
Ksh. 8,000,000.00 |
2022-03-15 |
2022-09-14 |
Pre Procurement |
Ward |
EREGI JUNCTION BOREHOLE REHABILITATION |
To Increase access to safe and clean water |
Ksh. 2,000,000.00 |
2022-04-27 |
2022-07-26 |
Ongoing |
Ward |
WANGULU WATER PROJECT |
To Increase access to safe and clean water |
Ksh. 4,000,000.00 |
2022-03-04 |
2022-09-03 |
Completed |
Ward |
SCHOOLS PIPELINES IN IZAAVA- LYADUYWA WARD |
To Increase access to safe and clean water |
Ksh. 2,000,000.00 |
2022-04-05 |
2022-07-04 |
Ongoing |
Ward |
REFILLING OF GULLY AT CHEKOMBERO SRING IN IZAAVA-LYADUYWA WARD |
TO REHABILITATE AND AUGMENT EXISTING WATER SUPPLIES |
Ksh. 1,000,000.00 |
2022-04-05 |
2022-07-04 |
Ongoing |
Ward |
PIPE LAYING OF DISTRIBUTION LINE FROM TRIPPLE T TO ESIAMUTU PAG CHURCH |
To Increase access to safe and clean water |
Ksh. 3,000,000.00 |
2022-03-15 |
2022-05-14 |
Completed |
Ward |
PIPING AND EQUIPING OF BOREHOLE AT MUNUNGO PAG MWIBONA WARD |
To Increase access to safe and clean water |
Ksh. 4,000,000.00 |
2022-03-15 |
2022-09-14 |
Planned |
Ward |
CONSTRUCTION OF A WATER KIOSK AND EQUIPING OF BOREHOLE WITH 3PH SUBMERSIBLE PUMP AT VIGINA BOREHOLE |
To Increase access to safe and clean water |
Ksh. 3,000,000.00 |
2022-04-12 |
2022-07-11 |
Completed |
Ward |
LUGAGA-WAMULUMA PIPELINE EXTENSION |
To Increase access to safe and clean water |
Ksh. 5,000,000.00 |
2022-03-24 |
2022-09-23 |
Completed |
Ward |
SUPPLY AND INSTALLATION OF PUMPSET AT MUHANDA WATER PROJECT |
TO REHABILITATE AND AUGMENT EXISTING WATER SUPPLIES |
Ksh. 1,000,000.00 |
2022-04-08 |
2022-06-07 |
Completed |
Ward |
LAYING OF PIPELINWES WITHIN WEMILABI WARD |
To Increase access to safe and clean water |
Ksh. 4,000,000.00 |
2022-03-22 |
2022-09-21 |
Ongoing |
County |
purchase of skip loader, compacting truck and exhauster |
To improve urban planning in the county |
Ksh. 30,000,000.00 |
2019-04-10 |
2019-07-10 |
Completed |
County |
Supply and installation of litter bins |
To improve urban planning in the county |
Ksh. 10,000,000.00 |
2019-01-03 |
2019-03-06 |
Completed |
County |
Highmast floodlights installation |
To improve urban planning in the county |
Ksh. 63,000,000.00 |
2019-01-04 |
2020-01-06 |
Completed |
County |
Decentralised treatment facility |
To improve urban planning in the county |
Ksh. 15,000,000.00 |
2019-01-07 |
2020-01-07 |
Ongoing |
County |
Beautification of majengo, chavakali and mudete ringroads |
To improve urban planning in the county |
Ksh. 56,000,000.00 |
2022-03-01 |
2023-03-01 |
Ongoing |
Sub County |
Proposed upgrade of Mbale-Tsimbalo road to bitumen standard |
To improve urban planning in the County |
Ksh. 148,000,000.00 |
2020-03-06 |
2021-03-05 |
Completed |
County |
Proposed access roads footpath and side drains and highmast installation |
To improve urban planning in the County |
Ksh. 211,000,000.00 |
2020-03-06 |
2021-05-04 |
Ongoing |
County |
Purchase of survey equipment |
To enhance land security and utilization |
Ksh. 5,000,000.00 |
2019-11-22 |
2020-04-20 |
Completed |
Ward |
Purchase of land for Kegendirova TVET |
To enhance land security and utilization |
Ksh. 2,000,000.00 |
2020-01-17 |
2021-05-10 |
Completed |
Ward |
Purchase of land for Tiriki cultural center |
To enhance land security and utilization |
Ksh. 600,000.00 |
2020-01-08 |
2020-02-17 |
Completed |
Ward |
Purchase of land for Epanga Dispensary |
To enhance land security and utilization |
Ksh. 800,000.00 |
2017-09-25 |
2019-05-27 |
Completed |
Ward |
purchase of land banking |
To enhance land security and utilization |
Ksh. 10,000,000.00 |
2018-09-24 |
2019-06-03 |
Completed |
Ward |
purchase of land for Gamande TVET |
To enhance land security and utilization |
Ksh. 4,500,000.00 |
2018-09-24 |
2020-02-17 |
Completed |
Ward |
purchase of vihindi ecde land |
To enhance land security and utilization |
Ksh. 2,400,000.00 |
2018-09-24 |
2019-06-14 |
Completed |
Ward |
Purchase of land for water project |
To enhance land security and utilization |
Ksh. 1,300,000.00 |
2018-09-24 |
2019-07-25 |
Completed |
Ward |
Purchase of land at Chanzaruka dispensary |
To enhance land security and utilization |
Ksh. 1,800,000.00 |
2021-05-10 |
2021-08-10 |
Completed |
Ward |
purchase of jepkose land |
to enhance land security and utilization |
Ksh. 1,415,000.00 |
2020-01-06 |
2020-03-30 |
Completed |
County |
establishment of coordination committees |
To improve tracking of results and reporting |
Ksh. 2,000,000.00 |
2022-04-04 |
2022-04-29 |
Planned |
County |
construction of livestock sale yards |
To promote livestock marketing |
Ksh. 50,000,000.00 |
2020-07-01 |
2021-06-30 |
Completed |
Ward |
Kilingili market toilet |
construct modern toilets/pit latrines within our markets |
Ksh. 1,500,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
County |
Ebusiratsi Maternity wing |
To improve access to quality health care services |
Ksh. 5,200,000.00 |
2020-12-04 |
2021-12-31 |
Ongoing |
County |
Construction and rehabilitation of Abattoirs |
To promote safe handling of animal carcass |
Ksh. 25,000,000.00 |
2019-07-04 |
2021-06-30 |
Completed |
County |
vaccination |
To improve animal health and hygiene |
Ksh. 6,000,000.00 |
2018-07-02 |
2022-06-30 |
Ongoing |
County |
Completion of Wamihanda dispensary |
To improve access to quality health care services |
Ksh. 4,000,000.00 |
2020-12-04 |
2021-12-03 |
Ongoing |
County |
Dairy cow project |
Improve animal breeds |
Ksh. 6,000,000.00 |
2018-08-01 |
2022-06-30 |
Ongoing |
Ward |
Rehabilitation of Kerongo water supply |
To improve access to clean and safe water |
Ksh. 1,500,000.00 |
2021-02-19 |
2021-06-30 |
Completed |
Ward |
Installation of Bukuga floodlight |
To improve security |
Ksh. 3,000,000.00 |
2021-02-05 |
2021-04-30 |
Completed |
Ward |
Construction of Mahanga bodaboda shed |
To provide shelter to the bodaboda traders |
Ksh. 700,000.00 |
2021-04-02 |
2021-05-31 |
Completed |
Ward |
Routine maintenance of Light and salt road-Mahanga market |
To improve infrastructure supervision and Development |
Ksh. 2,400,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
Ward |
Construction of Angoya market toilet |
To provide good condition amenities to our trades within the markets |
Ksh. 500,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
Ward |
Floodlight at Kigadahi market |
To improve security in the market area |
Ksh. 500,000.00 |
2021-02-05 |
2021-04-30 |
Completed |
Ward |
Construction of Kigadahi bodaboda shed |
To create a conducive environment for trade and investment |
Ksh. 400,000.00 |
2021-02-05 |
2021-03-31 |
Completed |
Ward |
Construction of Mwoki Dispensary |
To improve access to quality health services |
Ksh. 3,000,000.00 |
2021-01-01 |
2021-06-30 |
Ongoing |
County |
Avocado Promotion |
To increase production of Avocado fruit |
Ksh. 3,000,000.00 |
2020-08-01 |
2021-06-30 |
Completed |
Ward |
Routine maintenance of Mukingi-Masana road |
To improve infrastructure supervision and Development |
Ksh. 3,000,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
County |
tea promotion |
To increase tea production |
Ksh. 6,000,000.00 |
2020-08-01 |
2021-07-30 |
Completed |
County |
Construction of oxygen plant at VCRH |
To improve access to health services |
Ksh. 4,000,000.00 |
2019-07-05 |
2020-06-30 |
Completed |
County |
African Leafy Vegetables |
To increase production and value addition of leafy vegetables |
Ksh. 6,000,000.00 |
2020-08-01 |
2021-07-31 |
Completed |
County |
Completion of Mulele dispensary block |
To provide affordable and accessible healthcare services. |
Ksh. 4,000,000.00 |
2021-02-05 |
2021-06-30 |
Ongoing |
County |
Crop pest control |
Crop pest and disease Management and control |
Ksh. 3,000,000.00 |
2020-08-01 |
2022-07-01 |
Ongoing |
Ward |
Construction of Idavaga ECDE |
To increase access to Early Childhood Education |
Ksh. 1,600,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
Ward |
Construction of Mbihi water tank |
To improve access to clean and safe water |
Ksh. 2,500,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
Ward |
Construction of Mbihi water tank |
To improve access to clean and safe water |
Ksh. 2,500,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
Ward |
Kegoye elevated steel tank |
To improve access to clean and safe water |
Ksh. 4,000,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
Ward |
Protection of Chango water spring |
Protection of on source water points and improve access to clean and safe water |
Ksh. 800,000.00 |
2021-03-05 |
2021-06-30 |
Completed |
Ward |
Protection of Homepub water spring |
Improve access to clean and safe water |
Ksh. 800,000.00 |
2021-02-05 |
2021-06-30 |
Completed |
Sub County |
Egelelwe Igakara Chango water project |
Increase access to clean and safe water |
Ksh. 5,000,000.00 |
2020-11-03 |
2021-02-26 |
Completed |
Sub County |
Construction of Lotego toilet |
To provide good condition amenities to traders within the market |
Ksh. 5,000,000.00 |
2021-01-01 |
2021-06-30 |
Completed |
Ward |
Completion of Kimwenge Dispensary |
To provide affordable and accessible healthcare services. |
Ksh. 3,000,000.00 |
2021-01-14 |
2021-06-30 |
Completed |
Ward |
Construction of Zululu ECDE Classroom |
To increase access to ECDE |
Ksh. 1,500,000.00 |
2021-04-02 |
2021-06-30 |
Completed |
Ward |
Construction Sabuni bridge |
To improve road connectivity |
Ksh. 7,000,000.00 |
2021-01-15 |
2021-03-31 |
Completed |
Ward |
Constuction of Ikori bridge |
To improve access to rural areas |
Ksh. 400,000.00 |
2021-01-26 |
2021-06-30 |
Completed |
Ward |
Augmentation of Sossian water project |
To improve access to clean and safe water |
Ksh. 8,000,000.00 |
2021-01-25 |
2021-06-30 |
Completed |
Ward |
Construction of kapchemgung ECDE Classroom |
To increase access to ECDE |
Ksh. 1,500,000.00 |
2021-04-02 |
2021-06-30 |
Completed |
Ward |
Construction of Gimwenge road |
To improve access to rural areas |
Ksh. 3,000,000.00 |
2021-01-26 |
2021-03-31 |
Completed |
Ward |
fencing of community forest in Munzatsi |
To secure the forest |
Ksh. 900,000.00 |
2021-01-28 |
2021-03-31 |
Completed |
Ward |
Construction of Gaga Water Project Phase II |
construction of new water supply |
Ksh. 6,000,000.00 |
2020-01-25 |
2020-06-30 |
Completed |
Ward |
Construction of a pit latrine at Ochwore |
Increase no. of sanitation facilities in urban and market centers |
Ksh. 998,319.00 |
2021-01-22 |
2021-06-30 |
Ongoing |
Ward |
Construction of Munanguba box culvert |
To improve access to rural areas |
Ksh. 3,984,600.00 |
2021-01-15 |
2021-06-30 |
Completed |
Ward |
Opening of Maseno Emmatsi road phase 2 part 1 |
Improve rural access |
Ksh. 1,000,000.00 |
2021-01-15 |
2021-03-31 |
Completed |
Ward |
Completion of Epanga bridge |
To improve access to rural areas |
Ksh. 3,000,000.00 |
2021-01-15 |
2021-06-30 |
Completed |
County |
Slabbing mama mboga market luanda |
To improve trading environment for traders |
Ksh. 400,000.00 |
2021-01-18 |
2021-06-30 |
Completed |
Sub County |
Rehabilitation of Mwibona sotres market |
To improve trading environment for livestock traders |
Ksh. 1,500,000.00 |
2021-01-18 |
2021-06-30 |
Completed |
County |
Installation of water heating solar at Luanda Dispensary |
Improve access to quality health care services |
Ksh. 1,000,000.00 |
2020-07-10 |
2021-01-08 |
Completed |
County |
Completion of Epanga Hospital |
Curative health services |
Ksh. 4,500,000.00 |
2021-01-14 |
2021-12-31 |
Ongoing |
Ward |
Construction of Ebutanyi Esibeye and Esiandumba ECDE Classroom |
Provision of relevant instructional materials |
Ksh. 3,000,000.00 |
2021-04-02 |
2021-06-30 |
Completed |
Ward |
Construction of Ebubayi ECDE classroom |
To increase access to ECDE |
Ksh. 1,500,000.00 |
2021-04-02 |
2021-06-30 |
Ongoing |
Ward |
Construction of Ebulako ECDE Classroom |
To improve access to ECDE |
Ksh. 1,500,000.00 |
2021-04-02 |
2021-06-30 |
Completed |
County |
Training and sensitization of Departmental and section Heads |
strengthen human resources performance management |
Ksh. 2,000,000.00 |
2021-11-01 |
2022-06-30 |
Ongoing |
County |
renovation and equipping of CPSB offices |
Enhance working environment for effective and efficient service delivery |
Ksh. 1,500,000.00 |
2020-11-02 |
2021-12-31 |
Ongoing |
County |
Institutional capacity building of Members of the CPSB |
To promote effective and efficient service delivery by members of the CPSB |
Ksh. 2,000,000.00 |
2021-07-01 |
2022-07-30 |
Completed |
Ward |
Emuhaya ECDE Classroom |
To increase access to ECDE |
Ksh. 1,500,000.00 |
2021-04-02 |
2021-06-30 |
Ongoing |
Ward |
Essong'olo ECDE Classroom |
Improve access to ECDE |
Ksh. 1,500,000.00 |
2021-04-02 |
2021-06-30 |
Ongoing |
Ward |
Esirabe ECDE classroom |
Increase access to ECDE |
Ksh. 1,500,000.00 |
2021-04-02 |
2021-06-30 |
Ongoing |
Sub County |
Fencing of 6 acres of Land in Luanda South for Establishment of fertilizer factory |
To secure the site |
Ksh. 2,950,230.00 |
2021-01-28 |
2021-06-30 |
Completed |
Sub County |
Construction of distribution line for Nang'oli water project |
To improve access to clean and safe |
Ksh. 1,960,460.00 |
2021-01-18 |
2021-06-30 |
Completed |
Sub County |
Esirabe water tank |
To improve access to clean and safe portable water |
Ksh. 3,488,200.00 |
2021-01-18 |
2021-06-30 |
Completed |
Sub County |
Construction of 3 water springs in Central Maragoli |
To increase access to clean and safe water |
Ksh. 798,256.00 |
2021-01-28 |
2021-11-30 |
Completed |
Sub County |
Expansion of Maseno-Ekwanda and Nang’oli water project distribution lines |
Improve access to clean and safe piped water |
Ksh. 1,960,460.00 |
2021-01-28 |
2021-06-30 |
Completed |
Ward |
REHABILITATION OF DIGULA COMMUNITY WATER SUPPLY |
REDESIGN, REHABILITATION AND EXPANSION OF DILAPIDATED WATER SCHEMES |
Ksh. 2,500,000.00 |
2020-02-26 |
2020-06-26 |
Ongoing |
Ward |
CONSTRUCTION OF ELEVATED TANK KEGOYE |
construction of new water supply |
Ksh. 4,500,000.00 |
2020-02-03 |
2020-06-03 |
Completed |
Ward |
CONSTRUCTION OF EGELELELWE WATER PROJECT |
construction of new water supply |
Ksh. 9,000,000.00 |
2020-02-03 |
2020-06-03 |
Completed |
Ward |
SUPPLY AND ERECTION OF ELEVATED PRESSED STEEL TANK EREGI |
to increase per capita water storage |
Ksh. 3,000,000.00 |
2021-03-02 |
2021-06-02 |
Completed |
Ward |
Construction of a public flow flash toilet at Banja market |
Increase no. of sanitation facilities in urban and market centers |
Ksh. 2,000,000.00 |
2019-03-04 |
2019-06-04 |
Completed |
Ward |
Protection of Water Springs (CENTRAL BUNYORE) |
increase water point sources |
Ksh. 1,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Protection of 3no. Water springs (JEPKOYAI) |
increase water point sources |
Ksh. 500,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Completion of Ilungu mkt public toilet |
Increase no. of sanitation facilities in urban and market centers |
Ksh. 600,000.00 |
2019-03-01 |
2019-06-01 |
Completed |
Ward |
DRILLING, DEVELOPMENT AND CAPPING OF BOREHOLE AT ESIBILA CHURCH OF GOD |
construction of new water supply |
Ksh. 2,000,000.00 |
2019-03-01 |
2019-06-01 |
Completed |
Ward |
Pipeline Extension Kaptech water Supply |
TO INCREASE ACCESS TO PIPED WATER |
Ksh. 2,500,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Rehabilitation of Chango water Project |
REDESIGN, REHABILITATION AND EXPANSION OF DILAPIDATED WATER SCHEMES |
Ksh. 1,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Protection of Water Springs in Central Maragoli |
increase water point sources |
Ksh. 1,500,000.00 |
2019-03-06 |
2019-05-06 |
Completed |
Ward |
Protection of 7no Water Spring (TAMBUA) |
increase water point sources |
Ksh. 3,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Protection of 4no Water Springs(GISAMBAI) |
increase water point sources |
Ksh. 800,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Construction of a public Flush Toilet(GISAMBAI) |
Increase no. of sanitation facilities in urban and market centers |
Ksh. 1,500,000.00 |
2019-04-15 |
2019-06-15 |
Completed |
Ward |
Protection of water springs 5no in Mungoma |
increase water point sources |
Ksh. 2,000,000.00 |
2019-03-26 |
2019-05-26 |
Completed |
Ward |
Equipping of Vigina primary School bore hole |
construction of new water supply |
Ksh. 1,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Protection of 5no water springs (Lyaduywa/Izava) |
increase water point sources |
Ksh. 1,000,000.00 |
2019-03-06 |
2019-05-06 |
Completed |
Ward |
Protection of 5no water springs ( Lugaga/Wamuluma Ward) |
increase water point sources |
Ksh. 2,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Rehabilitation of 10no water springs(Busali Ward) |
increase water point sources |
Ksh. 1,000,000.00 |
2019-06-15 |
2019-08-15 |
Completed |
Ward |
LYADUYWA MUNUGI PIPELINE |
To increase access to piped water |
Ksh. 2,000,000.00 |
2021-03-02 |
2021-05-02 |
Ongoing |
Ward |
SUPPLY AND DELIVERY OF SUBMERSIBLE PUMP-SET AND INSTALLATION MATERIALS FOR REPAIR OF SABATIA BOREHOLE |
TO MAINTAIN EXISTING WATER SUPPLY |
Ksh. 500,000.00 |
2021-04-21 |
2021-05-21 |
Ongoing |
Ward |
DRILLING AND INSTALLATION OF BOREHOLE AT CHANZEYWE TVC ( EIA & HYDROGEOLOGICAL SURVEY) |
construction of new water supply |
Ksh. 700,000.00 |
2021-05-19 |
2021-07-19 |
Ongoing |
Ward |
KEGOYE WATER DISTRIBUTION PROJECT |
To increase access to piped water |
Ksh. 2,000,000.00 |
2021-03-09 |
2021-05-09 |
Completed |
County |
Vihiga Cluster Water Project |
To rehabilitate and augment Major Urban water supplies of Maseno, Mbale and Kaimosi |
Ksh. 1,700,000,000.00 |
2017-01-10 |
2021-04-15 |
Completed |
Ward |
KERONGO WATER PROJECT |
construction of new water supply |
Ksh. 1,500,000.00 |
2021-03-02 |
2021-06-02 |
Ongoing |
Ward |
WATER SPRINGS AT CENTRAL MARAGOLI |
increase water point sources |
Ksh. 800,000.00 |
2021-03-06 |
2021-06-06 |
Completed |
Ward |
MUNGOMA WATER SPRING |
increase water point sources |
Ksh. 600,000.00 |
2021-03-03 |
2021-06-03 |
Ongoing |
Ward |
CONSTRUCTION OF MBIHI WATER TANK |
to increase per capita water storage |
Ksh. 2,500,000.00 |
2021-03-30 |
2021-06-30 |
Ongoing |
Ward |
GIVOGI WATER PROJECT |
completion of stalled and ongoing projects |
Ksh. 1,500,000.00 |
2021-03-06 |
2021-06-06 |
Ongoing |
Ward |
ESIRABE WATER TANK WEMILABI |
TO INCREASE PER CAPITA WATER STORAGE |
Ksh. 3,500,000.00 |
2021-03-02 |
2021-06-02 |
Ongoing |
Ward |
CENTRAL MARAGOLI PIPELINE EXTENSIONS |
TO INCREASE ACCESS PIPED WATER |
Ksh. 4,500,000.00 |
2021-04-30 |
2021-06-30 |
Ongoing |
Ward |
ESIRULO WATER TANK EMUHAYA |
to increase per capita water storage |
Ksh. 4,000,000.00 |
2021-04-07 |
2021-06-07 |
Ongoing |
Ward |
KEGONDI H/C BOREHOLE |
construction of new water supply |
Ksh. 2,500,000.00 |
2021-04-06 |
2021-06-06 |
Ongoing |
Ward |
LOSENGELI WATER TANK (WODANGA) |
to increase access to safe and clean water |
Ksh. 5,000,000.00 |
2021-03-06 |
2021-05-06 |
Ongoing |
Ward |
MASENO – EKWANDA LINE TO ESERE VILLAGE DISTRIBUTION LINE FOR NANGOLI W/P (LUANDA SOUTH) |
TO INCREASE WATER PIPELINE COVERAGE IN ONGOING WATER PROJECT |
Ksh. 2,000,000.00 |
2021-03-10 |
2021-05-10 |
Completed |
Ward |
CHEPTULU WATER PROJECT |
construction of new water supply |
Ksh. 2,000,000.00 |
2021-03-02 |
2021-06-02 |
Ongoing |
Ward |
WANGULU BOREHOLE |
construction of new water supply |
Ksh. 4,000,000.00 |
2021-04-16 |
2021-06-16 |
Ongoing |
Ward |
VIYALO WATER TANK |
TO INCREASE PER CAPITA WATER STORAGE |
Ksh. 4,000,000.00 |
2021-03-06 |
2021-06-06 |
Ongoing |
Ward |
GAGA WATER PROJECT (PHASE 2) |
completion of stalled and ongoing projects |
Ksh. 6,000,000.00 |
2021-03-06 |
2021-05-06 |
Completed |
Sub County |
CONSTRUCTION OF SOSIANI WATER PROJECT |
REDESIGN, REHABILITATION AND EXPANSION OF DILAPIDATED WATER SCHEMES |
Ksh. 8,000,000.00 |
2021-04-07 |
2021-07-07 |
Ongoing |
Ward |
CONSTRUCTION OF MUGOGO WATER PROJECT |
construction of new water supply |
Ksh. 10,000,000.00 |
2021-03-09 |
2021-06-09 |
Ongoing |
County |
SUPPLY AND LAY PIPE WORKS AND FITTINGS (VIHIGA CLUSTER WATER PROJECT) |
TO INCREASE ACCESS TO PIPED WATER |
Ksh. 38,000,000.00 |
2021-03-01 |
2021-09-01 |
Ongoing |
Sub County |
Completion of Ebusyubi dispensary |
To improve access to health care |
Ksh. 2,941,780.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
County |
Karandini VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 0.00 |
2021-07-01 |
2022-06-30 |
Ongoing |
Ward |
Ebusakami ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Kima ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Senende ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Shamakhokho ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Mungavo ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Givogi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Shaviringa ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Jinjini ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Isikhi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-05-30 |
2020-05-30 |
Planned |
Ward |
Ebukuliti ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Ebukuya ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Jepkose VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 1,500,000.00 |
2021-07-01 |
2022-06-30 |
Ongoing |
County |
Busaina VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 10,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Maseno VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 5,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Chanzeywe VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 5,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Keveye VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 25,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
St. Peter's Hambale VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 5,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Ebusiralo VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 5,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Mwambeba VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 5,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Kaimosi VTC
|
Construct infrastructure in Vocational Training Centres |
Ksh. 5,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Emmukunzi VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 5,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Solongo VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 5,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Sub County |
Completion and equipping of modern ward in Sabatia |
To improve medical services |
Ksh. 20,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Ebusiratsi VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 5,010,000.00 |
|
2021-06-30 |
Ongoing |
Sub County |
Completion and equipping of modern ward in Hamisi |
To improve medical services |
Ksh. 20,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
Ward |
Mambai ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Digitization of county filing and records system |
Implementation of file and records management system |
Ksh. 2,000,000.00 |
2019-07-01 |
2022-06-30 |
Planned |
Ward |
Chanzuvu ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Land for Kegendirova Vocational Training Centre |
Construct infrastructure in Vocational Training Centres |
Ksh. 2,000,000.00 |
|
2021-04-29 |
Under Procurement |
Ward |
Mudungu ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Human Resource Management System |
Develop HRMIS |
Ksh. 15,000,000.00 |
2018-06-18 |
2022-06-30 |
Ongoing |
Ward |
Esirabi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Construction of orthopaedics and rehabilitation unit |
To Improve medical services |
Ksh. 25,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Elukhambi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Purchase of equipped Modern Ambulances |
Develop county referral protocols |
Ksh. 25,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Performance Management |
Institute Performance Management |
Ksh. 5,000,000.00 |
2018-07-16 |
2022-06-01 |
Planned |
Sub County |
Upgrade Emusire and Lyanaginga health centres to sub-county hospitals |
To improve medical services |
Ksh. 50,000,000.00 |
2020-07-01 |
2021-06-30 |
Planned |
Sub County |
Construction of modern ward in Emusire |
To improve medical services |
Ksh. 20,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Viyalo Vocational Training Centre |
Construct infrastructure in Vocational Training Centres |
Ksh. 4,000,000.00 |
2020-04-20 |
|
Under Procurement |
County |
Maintenance of County Government offices |
Provision of Affordable and decent housing in the County |
Ksh. 2,500,000.00 |
2021-07-01 |
2022-06-30 |
Completed |
County |
Provision of affordable housing |
To improve access to affordable and decent housing |
Ksh. 2,500,000.00 |
2021-07-01 |
2022-06-30 |
Ongoing |
County |
Environmental Social Audit |
To carry out an environmental audit to ensure that Mwitoko Fish Farm is complying to environmental requirements |
Ksh. 500,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Shelving of ECDE classrooms |
Construction and equipping of ECDE Centres |
Ksh. 540,000.00 |
2019-02-06 |
2019-06-30 |
Completed |
County |
Procurement of ECDE certificates |
Provision of ECDE certificates to learners |
Ksh. 3,500,000.00 |
2020-03-20 |
2020-05-28 |
Completed |
County |
renovation of Government residential Houses |
Provision of Affordable and decent housing in the County |
Ksh. 5,000,000.00 |
2021-07-01 |
2022-06-30 |
Ongoing |
County |
Procurement of bursary forms |
Provision of bursaries to bright and needy students |
Ksh. 2,000,000.00 |
2020-03-20 |
2020-04-28 |
Completed |
County |
Survey of Market centres |
To prepare maps with actual boundaries |
Ksh. 3,000,000.00 |
2021-07-01 |
2022-06-30 |
Ongoing |
County |
Fencing public land |
To prepare maps with actual boundaries |
Ksh. 2,000,000.00 |
2017-07-03 |
2022-06-30 |
Planned |
County |
Gaigedi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-25 |
2019-05-24 |
Completed |
County |
Vokoli ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-25 |
2019-05-24 |
Completed |
County |
Acquisition of Land |
To enhance land banking for development |
Ksh. 7,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Physical development Plans for market centres |
To improve Urban Planning in Market centres |
Ksh. 10,000,000.00 |
2021-07-01 |
2022-06-30 |
Planned |
County |
Givogi Friends ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-25 |
2019-05-24 |
Completed |
County |
Womulalu ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-04-02 |
2019-07-02 |
Completed |
County |
Construction of county treasury square |
To improve working environment |
Ksh. 50,000,000.00 |
2019-06-30 |
2022-07-05 |
Planned |
County |
Tigoi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-04-02 |
2019-06-26 |
Ongoing |
Ward |
Inyanza ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-20 |
2019-06-05 |
Ongoing |
Ward |
Chandugunyi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-20 |
2019-06-06 |
Ongoing |
County |
Establishment of asset register |
To keep an up to date asset values |
Ksh. 50,000,000.00 |
2018-07-05 |
2022-06-18 |
Ongoing |
Sub County |
Completion of Ebunangwe water project phase 1 |
completion of stalled and ongoing projects |
Ksh. 13,000,000.00 |
2018-06-15 |
2018-08-15 |
Completed |
Sub County |
Completion of south West Bunyore w/p |
completion of stalled and ongoing projects |
Ksh. 14,645,000.00 |
2018-06-15 |
2018-08-15 |
Ongoing |
Sub County |
Construction of Gisambai – Majengo water project |
completion of stalled and ongoing projects |
Ksh. 11,798,800.00 |
2018-06-15 |
2018-08-15 |
Completed |
Ward |
Protection of water springs 13No in Luanda South |
increase water point sources |
Ksh. 5,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Protection of water springs 5no in South Maragoli |
increase water point sources |
Ksh. 2,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Protection of water springs in Banja |
increase water point sources |
Ksh. 2,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Rehabilitation of Mawe tatu community water scheme |
REDESIGN, REHABILITATION AND EXPANSION OF DILAPIDATED WATER SCHEMES |
Ksh. 1,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Rehabilitation of Matsigulu water scheme |
REDESIGN, REHABILITATION AND EXPANSION OF DILAPIDATED WATER SCHEMES |
Ksh. 2,500,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Mangongo water project pipeline extension |
To Increase access to piped water |
Ksh. 1,000,000.00 |
2019-05-01 |
2019-07-01 |
Completed |
Ward |
Busweta ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,200,000.00 |
2019-02-24 |
2020-06-24 |
Completed |
Ward |
Chatamilu ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-02-26 |
2020-05-26 |
Ongoing |
County |
Kibara ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-01-08 |
2019-03-03 |
Ongoing |
Ward |
Boyusuf ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-01-08 |
2019-03-03 |
Ongoing |
Ward |
Embumbayi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-13 |
2020-06-10 |
Ongoing |
Ward |
Installation of tank tower, water tank and spring protection |
to increase access to safe and clean water |
Ksh. 1,500,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Rehabilitation of Muhanda water project |
REDESIGN, REHABILITATION AND EXPANSION OF DILAPIDATED WATER SCHEMES |
Ksh. 900,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Equipping of Eregi borehole |
To Increase access to safe and clean water |
Ksh. 1,100,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Rehabilitation of standkisa-kilingili pipeline |
to increase access to piped water |
Ksh. 800,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Rehabilitation of pipeline along ekwanda-luanda road(slaughterhouse) |
To Increase access to piped water |
Ksh. 2,500,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Rehabilitation of Losengeli masonry tank |
REDESIGN, REHABILITATION AND EXPANSION OF DILAPIDATED WATER SCHEMES |
Ksh. 900,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
Ward |
Construction of mbihi water tank tower |
to increase per capita water storage |
Ksh. 2,000,000.00 |
2019-02-26 |
2019-05-26 |
Completed |
County |
The construction of rainwater harvesting infrastructure and facility in 50 selected ECDE/VTC centers |
To Increase access to safe and clean water |
Ksh. 5,000,000.00 |
2018-06-15 |
2018-08-15 |
Completed |
County |
Establishment of automated asset register |
To establish and maintain county asset management information system |
Ksh. 50,000,000.00 |
2019-07-01 |
2023-06-30 |
Ongoing |
County |
Construction of county medical supplies stores |
To provide a buffer zone in the supply chain of medical supplies |
Ksh. 4,840,810.00 |
2019-04-13 |
2019-06-13 |
Ongoing |
County |
Expansion of treasury office space and provision of equipment and other requisite resources |
Provision of enough working space |
Ksh. 10,000,000.00 |
2021-07-05 |
2022-06-18 |
Planned |
Ward |
Protection of 5 springs in Lyaduywa/Izava |
increase water point sources |
Ksh. 1,000,000.00 |
2020-05-12 |
2020-06-12 |
Completed |
County |
Capacity building on PFM, Planning and M&E |
To enhance capacity in PFM, Planning and M&E |
Ksh. 5,000,000.00 |
2019-06-03 |
2021-09-30 |
Ongoing |
Ward |
Gaga Water Project |
completion of stalled and ongoing projects |
Ksh. 9,200,000.00 |
2020-04-08 |
2020-05-28 |
Completed |
Sub County |
Augementation of Emalindi/Esirulo Water Supply |
completion of stalled and ongoing projects |
Ksh. 4,892,600.00 |
2018-05-18 |
2018-08-15 |
Ongoing |
Ward |
Market Shade- ESIKOTE MARKET STALLS |
construction of market shades |
Ksh. 839,654.00 |
2018-03-01 |
2018-05-31 |
Completed |
Ward |
Market Shade |
construction of market shades |
Ksh. 410,000.00 |
2018-03-01 |
2018-05-31 |
Completed |
Ward |
Market Shade |
construction of market shades |
Ksh. 994,400.00 |
2018-03-01 |
2018-05-31 |
Completed |
County |
Preparation of road mantainance policy |
To strengthen legal and institutional capacity |
Ksh. 3,000,000.00 |
2020-08-10 |
2020-12-30 |
Ongoing |
Ward |
Market Shade |
construction of market shades |
Ksh. 845,458.00 |
2018-03-01 |
2018-05-31 |
Completed |
Sub County |
Chepsaga water project phase II |
completion of stalled and ongoing projects |
Ksh. 15,000,000.00 |
2018-05-15 |
2018-11-15 |
Completed |
Ward |
Market Shade |
construction of market shades |
Ksh. 3,556,990.00 |
2018-02-01 |
2018-04-30 |
Completed |
Ward |
Market Shade |
construction of market shades |
Ksh. 1,572,000.00 |
2018-02-01 |
2018-04-30 |
Completed |
Ward |
Market Shade |
construction of market shades |
Ksh. 1,990,000.00 |
2018-02-01 |
2018-04-30 |
Completed |
Ward |
Mugogo Water Project |
construction of new water supply |
Ksh. 2,000,000.00 |
2020-05-08 |
2020-06-08 |
Ongoing |
Sub County |
Bumbo Shamakhokho water project |
REDESIGN, REHABILITATION AND EXPANSION OF DILAPIDATED WATER SCHEMES |
Ksh. 5,000,000.00 |
2018-05-15 |
2018-11-15 |
Completed |
County |
Supply and delivery of pipes and fittings |
to increase access to piped water |
Ksh. 10,000,000.00 |
2020-05-05 |
2020-06-05 |
Completed |
Ward |
Ekwanda Health Centre Pipeline extension |
to increase access to piped water |
Ksh. 1,000,000.00 |
2019-05-19 |
2019-06-20 |
Completed |
County |
Motor Vehicle Mechanics Tools and Equipment at Solongo VTC |
Procurement of Modern Tools & Equipment |
Ksh. 4,195,000.00 |
|
2021-04-28 |
Ongoing |
Ward |
Esibila ECDE |
Construction and equipping of ECDE classrooms |
Ksh. 1,600,000.00 |
2020-01-08 |
2020-03-03 |
Ongoing |
County |
Renovation of administration block and Motor Vehicle Mechanics workshop at Solongo VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 3,649,160.00 |
|
2021-04-28 |
Ongoing |
Ward |
Isanda ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-13 |
2020-08-10 |
Ongoing |
Ward |
Drilling and equipping of borehole and construction of a hand dug well |
construction of new water supply |
Ksh. 3,500,000.00 |
2020-04-24 |
2020-06-24 |
Completed |
Ward |
Kisatiru ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-03-26 |
2020-06-26 |
Ongoing |
Ward |
Khusophia Market Shed |
construct market stalls within the county |
Ksh. 751,436.00 |
2020-03-02 |
2020-04-30 |
Completed |
Ward |
Supply & installation of Electrical machines at Chekombero and Emanyinya boreholes |
To Increase access to safe and clean water |
Ksh. 600,000.00 |
2020-05-25 |
2020-06-20 |
Completed |
County |
Supply & Delivery of Electrical & Electronics Tools & Equipment at Keveye VTC |
Procurement of Modern Tools & Equipment |
Ksh. 2,882,800.00 |
|
2021-04-28 |
Completed |
Ward |
Wandega ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-02 |
2020-06-24 |
Ongoing |
County |
Supply & Delivery of Hair Dressing & Beauty Therapy Tools at Keveye VTC |
Procurement of Modern Tools & Equipment |
Ksh. 735,138.00 |
|
2021-04-28 |
Ongoing |
County |
Supply & Delivery of Building & Construction/ Masonry Tools and Equipment at Emmukunzi VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 4,814,360.00 |
|
2021-04-28 |
Completed |
Ward |
Chatamilu ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-02-26 |
2020-05-26 |
Ongoing |
County |
Motor Vehicle Mechanics tools & equipment at Maseno VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 4,060,970.00 |
|
2021-04-28 |
Completed |
Ward |
EXTENTION OF VIGINA BOREHOLE PIPELINE |
To Increase access to piped water |
Ksh. 2,000,000.00 |
2020-03-16 |
2020-04-27 |
Completed |
County |
County court users Commitee |
To foster working relations with the judiciary |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
County |
Motor Vehicle tools & equipment Kaimosi VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 4,321,000.00 |
|
2021-04-28 |
Ongoing |
County |
Establish county liason |
To improve communication |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
County |
Agribusiness tools and Equipment at Kaimosi VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 2,981,000.00 |
|
2021-04-28 |
Ongoing |
County |
County peace committee |
To promote peaceful coexistence |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
Ward |
Demarcation of Jebrok Water Plot |
To Increase access to safe and clean water |
Ksh. 490,000.00 |
2020-04-05 |
2020-05-05 |
Completed |
County |
Establish public participation and civic education strategy |
To promote citizen engagement and civic education |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
County |
Improvement works at Ebusakami play ground |
To organize ward level sporting activities in the county |
Ksh. 988,088.00 |
2019-04-25 |
2019-06-07 |
Completed |
Ward |
Lyaduywa ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-02-26 |
2020-05-30 |
Completed |
County |
Establish corruption prevention strategy |
To promote accountability |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
County |
Establishment of county elected leaders forum |
To promote service delivery to the electorate in the county |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
Ward |
Protection of Springs-Central Maragoli |
increase water point sources |
Ksh. 600,000.00 |
2018-05-11 |
2018-06-16 |
Completed |
Ward |
Endeli ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-02-27 |
2020-05-30 |
Completed |
County |
Leveling and grassing of Lwenya play ground |
To organize ward level sporting activities in the county |
Ksh. 1,044,000.00 |
2019-05-02 |
2019-06-03 |
Completed |
Ward |
Chavakali ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-03 |
2020-06-24 |
Ongoing |
County |
Constitute County Government alternative dispute resolution committee |
To promote internal mechanisms of dispute resolution |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
Ward |
Protection of Springs- Emabungo |
increase water point sources |
Ksh. 600,000.00 |
2020-05-05 |
2020-06-05 |
Completed |
Ward |
Givudianyi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-02 |
2020-06-15 |
Completed |
Sub County |
Ekwanda Health Centre
|
To improve medical services |
Ksh. 5,811,070.00 |
2019-06-17 |
2019-09-17 |
Completed |
County |
Convene county cohesion and integration conference |
To promote peaceful coexistence among communities |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
County |
Leveling and grassing of Emukunzi play ground |
To organize ward level sporting activities in the county |
Ksh. 1,104,900.00 |
2019-04-23 |
2019-09-22 |
Completed |
Ward |
Construction of Banja borehole water kiosk and piping |
To Increase access to safe and clean water |
Ksh. 1,000,000.00 |
2020-04-06 |
2020-06-06 |
Terminated |
Ward |
Nabwani ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-02 |
2020-06-15 |
Planned |
County |
Establish professional County government enforcement unit |
To enhance enforcement of county laws and security |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
Ward |
Kabinjari ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-08 |
2020-06-30 |
Ongoing |
County |
Preparation of CADP, C-APR |
To improve Coordination of formulation of County Plans |
Ksh. 5,000,000.00 |
2020-07-01 |
2020-09-30 |
Completed |
County |
Kidundu Stadium |
To improve sporting activities |
Ksh. 5,066,260.00 |
2018-03-18 |
2019-06-15 |
Ongoing |
Ward |
Spring protection in North East Bunyore |
increase water point sources |
Ksh. 2,000,000.00 |
2020-05-08 |
2020-06-08 |
Completed |
Ward |
Mudungu ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-01 |
2020-06-05 |
Completed |
County |
Implementing County policing Authority |
To promote peace and security in the county |
Ksh. 0.00 |
2018-01-01 |
2022-12-31 |
Planned |
Ward |
Mukisangula ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-01 |
2020-07-01 |
Completed |
Sub County |
Completion of Emusire Morgue |
To provide morgue services |
Ksh. 5,344,540.00 |
2019-04-18 |
2020-06-18 |
Completed |
Ward |
Gamalenga-Musawa Water Supply |
construction of new water supply |
Ksh. 4,000,000.00 |
2020-04-08 |
2020-07-08 |
Completed |
Ward |
Siekuti ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-05-07 |
2019-05-28 |
Ongoing |
County |
Improvement works at Mumboha stadium |
To organize ward level sporting activities in the county |
Ksh. 4,753,350.00 |
2019-03-14 |
2019-06-07 |
Completed |
County |
Blood transfusion centre |
To improve blood transfusion services |
Ksh. 17,001,000.00 |
2019-04-22 |
2019-10-22 |
Completed |
County |
Improvement to amenities at Hamisi stadium |
To organize ward level sporting activities in the county |
Ksh. 34,931,900.00 |
2019-03-15 |
2019-06-30 |
Ongoing |
Ward |
Drilling & Equipping of borehole at Banja mkt |
construction of new water supply |
Ksh. 3,500,000.00 |
2019-03-29 |
2019-06-28 |
Terminated |
Ward |
Madira ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-04-15 |
2019-06-15 |
Completed |
County |
Completion of Vihiga county hospital medical plaza |
To improve access to specialized medical services |
Ksh. 100,000,000.00 |
2021-07-01 |
2022-06-30 |
Ongoing |
Ward |
Emanda ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-02-19 |
2020-05-19 |
Ongoing |
County |
Proposed facelift to VCRH |
To improve VCRH infrastructure |
Ksh. 5,534,750.00 |
2019-06-19 |
2019-09-19 |
Completed |
Ward |
Jamulongoji ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-28 |
2019-05-28 |
Completed |
County |
Chanda ECDE |
Purchase of land for school expansion |
Ksh. 1,600,000.00 |
2020-02-03 |
2020-06-30 |
Ongoing |
Ward |
Chanzoka ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-02 |
2020-06-24 |
Ongoing |
Ward |
Bugina ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-25 |
2019-06-25 |
Completed |
Ward |
Chavogere ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-25 |
2019-06-25 |
Completed |
County |
Market Shade |
construct/refurbishment open air markets to provide proper trading environment
|
Ksh. 1,990,000.00 |
2018-02-01 |
2018-04-30 |
Completed |
County |
Market Shade KILINGILI MARKET STALLS |
construct/refurbishment open air markets to provide proper trading environment
|
Ksh. 840,652.00 |
2018-02-01 |
2018-04-30 |
Completed |
Ward |
Boda Boda Shade |
construct bodaboda shades within the county |
Ksh. 398,973.00 |
2018-03-01 |
2018-05-31 |
Completed |
Ward |
Boda Boda Shade |
construct bodaboda shades within the county |
Ksh. 411,570.00 |
2018-02-01 |
2018-04-30 |
Completed |
Ward |
Boda Boda Shade |
construct bodaboda shades within the county |
Ksh. 876,157.00 |
2018-02-01 |
2018-04-30 |
Completed |
Ward |
Boda Boda Shade |
construct bodaboda shades within the county |
Ksh. 1,041,450.00 |
2018-02-01 |
2018-04-30 |
Completed |
Ward |
Boda Boda Shade- AT IPALI |
construct bodaboda shades within the county |
Ksh. 398,973.00 |
2018-02-01 |
2018-04-30 |
Completed |
Ward |
Boda Boda Shade |
construct bodaboda shades within the county |
Ksh. 876,000.00 |
2018-03-05 |
2018-05-31 |
Completed |
Ward |
Boda Boda Shade |
construct bodaboda shades within the county |
Ksh. 807,266.00 |
2018-03-05 |
2018-06-30 |
Completed |
County |
Training and skills development |
Training Sub-county Admins, Ward Admns and Enforcement officers at KSG or recognized institutions |
Ksh. 100,000,000.00 |
2018-07-25 |
2022-06-30 |
Ongoing |
Ward |
Boda Boda Shade |
construct bodaboda shades within the county |
Ksh. 905,524.00 |
2018-03-01 |
2018-05-31 |
Completed |
Ward |
Madegwa ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-03-09 |
2020-06-02 |
Ongoing |
Ward |
Demesi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-03-13 |
2020-06-01 |
Ongoing |
County |
Policy, Legal Framework and Institutional Reforms |
Develop policy documents to improve affordable quality health care services |
Ksh. 500,000.00 |
2017-09-01 |
2017-12-31 |
Completed |
Ward |
Bumbo ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-28 |
2019-05-28 |
Completed |
Ward |
Kapsogoro ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-31 |
2020-06-16 |
Ongoing |
Ward |
Ematsuli ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-02 |
2020-07-02 |
Completed |
Ward |
Musitinyi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-13 |
2020-07-13 |
Completed |
Ward |
Ebukuya Special School |
Construction and renovation of ECDE Centres |
Ksh. 0.00 |
2019-03-21 |
2019-06-21 |
Completed |
County |
Mkombozi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-18 |
2019-06-18 |
Completed |
Ward |
Mulwanda ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-18 |
2019-06-18 |
Completed |
Ward |
Ebusyubi ECDE |
Construction and equipping of ECDE centres |
Ksh. 1,600,000.00 |
2019-03-18 |
2019-06-18 |
Completed |
County |
construction and equipping recreational center's |
Construct |
Ksh. 250.00 |
2021-04-12 |
2023-04-13 |
Planned |
County |
Purchase of furniture and equipment |
Purchase of furniture and equipment |
Ksh. 15,000,000.00 |
2018-07-09 |
2021-06-30 |
Ongoing |
County |
Supply and delivery of general construction materials for fish ponds to Mwitoko Fish Farm |
Expand area under fish farming |
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
construction of social halls |
To promote cultural heritage and sporting activities |
Ksh. 0.00 |
2021-04-06 |
2023-04-20 |
Planned |
County |
Purchase of vehicles |
Purchase of vehicles |
Ksh. 65,000,000.00 |
2018-07-10 |
2021-06-30 |
Ongoing |
Ward |
Boda Boda Shade |
construct bodaboda shades within the county |
Ksh. 440,000.00 |
2018-03-01 |
2018-06-29 |
Completed |
County |
Administration block and one classroom at Keveye VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 2,517,940.00 |
2021-04-27 |
|
Completed |
County |
Construction of Farm Store, Sentry and Main Gate at Mwitoko fish Farm |
To improve security and storage of government assets at Mwitoko Fish Farm |
Ksh. 30,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Renovation, fencing and construction of gate at Emmukunzi VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 3,849,690.00 |
2021-04-27 |
|
Completed |
County |
Boys Dormitory at Maseno VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 1,759,890.00 |
2021-04-27 |
|
Completed |
County |
Supply and delivery of tools for pond construction |
To facilitate staff and casual workers undertaking pond construction and general civil works at Mwitoko Fish Farm |
Ksh. 200,000.00 |
2018-02-01 |
2018-06-30 |
Completed |
Ward |
Ebulamba ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-04-29 |
2020-06-30 |
Ongoing |
County |
Boys hostel at Maseno VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 2,907,140.00 |
2021-04-27 |
|
Completed |
County |
Completion of indoor fish hatchery and installation of fish larval rearing units |
To increase availability of quality fingerlings to fish farmers within the county |
Ksh. 30,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Mechanical services |
Opening up new roads |
Ksh. 16,500,000.00 |
2021-02-01 |
2021-06-30 |
Ongoing |
County |
Preparation of Kaimosi/Jeptulu Local physical plan |
To improve Urban planning |
Ksh. 7,000,000.00 |
2019-03-26 |
2020-03-26 |
Completed |
County |
Supply and delivery of fish feeds |
To expand area under fish farming by offering a stimulus package to fish farmers |
Ksh. 5,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
Ward |
Malindi ECDE |
Classroom construction and equipping |
Ksh. 1,600,000.00 |
2020-03-13 |
2020-06-01 |
Ongoing |
County |
Girls dormitory at Maseno VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 2,900,000.00 |
|
2021-04-27 |
Completed |
County |
Installation of high mast floodlights |
To improve trading environment and security |
Ksh. 10,000,000.00 |
2021-02-01 |
2021-05-28 |
Ongoing |
County |
Administration Block and Classroom at Maseno VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 4,574,970.00 |
2021-04-27 |
|
Completed |
Ward |
Banja ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-01-08 |
2019-03-03 |
Completed |
Ward |
Public toilet at Chandumba |
To effectively conserve and manage environmental resources |
Ksh. 428,986.00 |
2020-04-15 |
2020-05-15 |
Completed |
Ward |
Cheptech ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-21 |
2019-06-21 |
Completed |
County |
Construction of Governor and Deputy Governor residence |
To enhance housing sector services |
Ksh. 149,000,000.00 |
2019-03-28 |
2020-09-28 |
Ongoing |
Ward |
Muhudu ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-21 |
2019-06-21 |
Completed |
County |
Supply and delivery of geomembranes and plumbing materials to Mwitoko Fish Farm |
To acquire materials for construction of new fish nursery ponds at Mwitoko Fish Farm under force account |
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
Ward |
Ekwanda Special ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-04-27 |
2019-07-25 |
Completed |
County |
Markets fencing |
erection of fence around the markets within the county |
Ksh. 3,770,870.00 |
2019-05-06 |
2020-01-31 |
Completed |
Ward |
public pour flash toilet at Banja market |
|
Ksh. 1,914,690.00 |
2019-05-28 |
2019-06-15 |
Completed |
County |
Provision of electrical installation works at Mwitoko Fish Farm |
To install street lights from main gate to office area and carry out wiring in the newly constructed office store |
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
Ward |
Bodaboda Shade At Anasanga Market |
construct bodaboda shades within the county |
Ksh. 387,474.00 |
2020-04-06 |
2020-05-29 |
Completed |
Ward |
Kamuluguywa ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-26 |
2020-06-26 |
Completed |
County |
Supply & delivery of Pond Maintenance materials for Mwitoko Fish Farm |
To supply pond construction materials for renovation of old ponds and construction of new ones using own-force account |
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Construction of Bridges, culverts and river crossing |
To improve road connectivity |
Ksh. 51,000,000.00 |
2021-04-26 |
2021-10-25 |
Under Procurement |
County |
Renovation of five public pit latrines in Hamisi sub county - |
|
Ksh. 1,541,880.00 |
2020-04-06 |
2020-06-06 |
Completed |
County |
Supply & delivery of materials for pond renovations. fish sampling and M&E |
Expand area under fish farming |
Ksh. 1,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
County |
Renovation of Market Pit Latrine |
To effectively conserve and manage the environment |
Ksh. 1,999,980.00 |
2020-03-26 |
2020-05-26 |
Completed |
Ward |
Bodaboda Shade At Jebrok, |
construct bodaboda shades within the county |
Ksh. 740,060.00 |
2020-04-06 |
2020-05-29 |
Completed |
County |
Supply & delivery of Fingerlings |
Expand area under fish farming |
Ksh. 2,000,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
Ward |
Murraming Of Ekwanda Market |
murraming of the market access roads |
Ksh. 889,999.00 |
2020-03-02 |
2020-08-31 |
Completed |
County |
Improvement and murraming Farm access Road at Mwitoko Fish Farm |
To improve accessibility to the Mwitoko Fish Farm |
Ksh. 1,200,000.00 |
2017-07-01 |
2018-06-30 |
Completed |
Ward |
Open air market |
construct/refurbishment open air markets to provide proper trading environment
|
Ksh. 2,500,440.00 |
2020-03-09 |
2020-05-29 |
Completed |
County |
Mukuli ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-04-08 |
2019-07-08 |
Completed |
Ward |
Bodaboda shed at kwa shem,chavogere, wangulu |
construct bodaboda sheds within the county |
Ksh. 1,317,910.00 |
2020-04-06 |
2020-05-29 |
Completed |
County |
Renovation of Administration block |
Construct infrastructure in Vocational Training Centres |
Ksh. 0.00 |
|
2021-04-27 |
Ongoing |
County |
Solongo VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 0.00 |
|
2021-04-27 |
Ongoing |
County |
Kedohi ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-02-27 |
2020-05-30 |
Ongoing |
County |
Construction of ward administrators' offices |
Construction of 25 Ward Administrators' offices |
Ksh. 75,000,000.00 |
2018-08-14 |
2021-06-30 |
Planned |
County |
Renovation of administration block at Kaimosi VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 4,695,130.00 |
2021-04-27 |
|
Completed |
County |
Museywa Pit latrines |
Construction of functional pit latrines |
Ksh. 1,000,000.00 |
2019-02-20 |
2019-05-31 |
Completed |
Ward |
Khusophia Market Shade |
to construct market shades within the county and give them to the traders |
Ksh. 751,436.00 |
2020-03-02 |
2020-04-30 |
Completed |
Ward |
Construction of market stalls at Jebrock- & Boyani |
construct market stalls within the county |
Ksh. 1,105,350.00 |
2020-04-06 |
2020-06-05 |
Completed |
County |
Purchase of Land for Proposed Fertilizer Factory |
To effectively conserve and manage the Environment |
Ksh. 12,655.00 |
2020-03-20 |
2022-10-28 |
Ongoing |
County |
Luther ECDE Pit latrines |
Construction of Pit latrines |
Ksh. 1,000,000.00 |
2019-03-18 |
2019-05-01 |
Completed |
County |
Construction of Sub-county Administrators' offices |
Construction of 5 Sub-county Administrators' offices |
Ksh. 50,000,000.00 |
2018-08-14 |
2021-06-30 |
Planned |
County |
Butiti ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-02-26 |
2020-05-30 |
Completed |
County |
Upgrading, opening, gravelling and routine rehabilitation/ maintenance of roads |
To improve road connectivty |
Ksh. 450,000,000.00 |
2021-04-26 |
2021-06-28 |
Under Procurement |
County |
Ikobero ECDE |
Construction and equipping of ECDE centres |
Ksh. 1,600,000.00 |
2020-02-19 |
2020-06-02 |
Ongoing |
Ward |
Installation and testing of 3No. 10 m flood lights |
construction of flood lights within our business centers and markets |
Ksh. 1,498,430.00 |
2020-04-06 |
2020-06-04 |
Completed |
County |
Kakubudu ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-27 |
2019-06-21 |
Completed |
County |
Procurement of assorted tree seeds |
|
Ksh. 993,930.00 |
2020-03-23 |
2020-04-27 |
Completed |
County |
Establishment of Municipal Board |
To improve service delivery within the municipality |
Ksh. 41,200,000.00 |
2018-04-02 |
2023-01-01 |
Completed |
County |
installation of high mast flood lights |
to improve market security |
Ksh. 250,000,000.00 |
2018-04-02 |
2022-06-15 |
Ongoing |
County |
Upgrading, opening and rehabilitation /maintenance of road network |
to improve road connectivity |
Ksh. 136,000,000.00 |
2021-05-03 |
2021-06-30 |
Under Procurement |
County |
Development of GIS based valuation roll |
Have improved land taxation data |
Ksh. 50,000,000.00 |
2018-04-02 |
2022-06-15 |
Ongoing |
County |
Construction of 2 classrooms at Shamakhokho VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 1,740,350.00 |
2020-06-04 |
|
Ongoing |
County |
Fleet Management System implimentation |
Deploy a Fleet Management system |
Ksh. 10,000,000.00 |
2019-01-01 |
2019-06-28 |
Pre Procurement |
Ward |
Proposed Construction of 4No. boda boda shades at Luanda town |
to construct bodaboda sheds within the county and give them to the traders |
Ksh. 1,250,000.00 |
2020-03-16 |
2020-05-04 |
Completed |
County |
Gavudia ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2020-02-26 |
2020-05-26 |
Completed |
County |
Survey and fencing of public land |
To improve land tenure system |
Ksh. 50,000,000.00 |
2019-07-01 |
2020-06-30 |
Ongoing |
Ward |
Fencing of two acre piece of land at Gilwatsi Maragoli Hills. |
To effectively conserve and manage forestry and natural resources |
Ksh. 1,096,200.00 |
2020-04-09 |
2020-06-11 |
Completed |
County |
Hair Dressing and Beauty Therapy at Maseno VTC |
Procurement of Modern Tools & Equipment |
Ksh. 1,893,250.00 |
2019-11-20 |
|
Ongoing |
Ward |
Construction of 2No. boda boda shed at Kaimosi & Kaptech |
construct bodaboda shades within the county |
Ksh. 796,616.00 |
2020-03-16 |
2020-05-04 |
Completed |
County |
Shamalago VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 2,000,000.00 |
2020-04-12 |
2020-05-07 |
Ongoing |
County |
Musinaka ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-01-08 |
2019-03-03 |
Completed |
County |
Office block at Gilwatsi- Maragoli hills |
|
Ksh. 3,059,210.00 |
2020-09-03 |
2020-09-03 |
Completed |
Ward |
Bodaboda shade at home pub |
construct bodaboda shades within the county |
Ksh. 1,000,000.00 |
2020-03-16 |
2020-05-04 |
Completed |
County |
Shamakhokho (Mungavo VTC) |
Construct infrastructure in Vocational Training Centres |
Ksh. 1,740,350.00 |
2020-06-04 |
2020-08-04 |
Ongoing |
County |
Esiamarui ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-01-08 |
2019-03-03 |
Completed |
County |
Wandeche ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-01-08 |
2019-03-03 |
Completed |
Ward |
Bodaboda shed at lugaga wamuluma |
to construct bodaboda sheds within the county and give them to the traders |
Ksh. 900,000.00 |
2020-02-17 |
2020-05-04 |
Completed |
County |
Establishment of County Statistical Board |
To enhance collation, collection and documentation of County Statistics |
Ksh. 10,000,000.00 |
2021-03-01 |
2021-07-01 |
Ongoing |
County |
Renovation works at Governor's block(External works) |
Construction/refurbishing of county Headquarters offices |
Ksh. 150,000,000.00 |
2019-04-22 |
2029-10-22 |
Ongoing |
County |
Dormitory at Keveye VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 2,621,530.00 |
2019-03-25 |
2019-06-06 |
Completed |
County |
Gemeni ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-02-27 |
2019-05-27 |
Completed |
Ward |
Construction of 4No. boda boda shed at N. Maragoli |
construct bodaboda shades within the county |
Ksh. 1,595,230.00 |
2020-04-06 |
2020-06-01 |
Completed |
County |
Establishment of M&E dashboard |
Establish M&E institutional framework |
Ksh. 5,000,000.00 |
2021-01-01 |
2021-06-30 |
Planned |
County |
Vigetse ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-01-08 |
2019-03-08 |
Completed |
County |
Kabinjari VTC |
Construct infrastructure in Vocational Training Centres |
Ksh. 3,918,200.00 |
2020-04-03 |
2020-07-03 |
Ongoing |
County |
Kaptis ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-01-08 |
2019-03-08 |
Completed |
County |
Harnessing water for nurturing tree seedling |
Conservation of existing forests |
Ksh. 492,500.00 |
2020-04-03 |
2020-06-04 |
Completed |
Sub County |
Omena market |
to construct market shades within the county and give them to the traders |
Ksh. 3,951,890.00 |
2019-07-01 |
2019-12-27 |
Completed |
County |
Construction of 2 classrooms |
Construct infrastructure in Vocational Training Centres |
Ksh. 1,740,350.00 |
2020-06-04 |
|
Ongoing |
County |
Revenue automation |
To improve County Own Source revenue |
Ksh. 26,000,000.00 |
2019-04-02 |
2022-05-30 |
Planned |
County |
Affordable Housing |
Have urban areas with improved sewage
systems |
Ksh. 600,000,000.00 |
2018-04-02 |
2022-06-15 |
Ongoing |
County |
Establishment of County ACL (TEAM MATE ) |
strengthening efficiency and effectiveness of Internal Control systems |
Ksh. 3,000,000.00 |
2019-07-01 |
2021-06-30 |
Under Procurement |
County |
North Maragoli VTC |
Construct workshops in Vocational Training Centres |
Ksh. 87,000.00 |
2019-03-05 |
2019-05-30 |
Completed |
County |
Kipsigor ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-18 |
2019-06-21 |
Completed |
County |
Land management |
To protect public land |
Ksh. 250,000,000.00 |
2018-04-05 |
2022-06-15 |
Ongoing |
County |
Madeya ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-18 |
2019-06-21 |
Completed |
County |
Mudete VTC |
Construct pit latrines in Vocational Training Centres |
Ksh. 884,109.00 |
2019-01-21 |
2019-04-30 |
Completed |
County |
Construction and Equipping resource and data center |
Digitalization of ICT services in the county |
Ksh. 100,000,000.00 |
2018-01-01 |
2021-06-30 |
Terminated |
County |
Construction of Goibei ECDE |
Construction and equipping of ECDE Centres |
Ksh. 1,600,000.00 |
2019-03-18 |
2019-06-21 |
Completed |
County |
Munugi VTC |
Construct workshops in Vocational Training Centres |
Ksh. 870,000.00 |
|
2021-04-27 |
Completed |
County |
vihiga GNSS equipment and image analysis software |
To provide accurate GCP’s (ground control points) in Geo-referencing the acquired data. |
Ksh. 9,500,000.00 |
2018-05-31 |
2023-12-31 |
Ongoing |
Sub County |
reclamation of degraded land in Vihiga, Sabatia Hamisi, Emuhaya and Luanda sub counties |
To avert dangers of the degraded lands and make them leaseable |
Ksh. 7,000,000.00 |
2018-06-30 |
2022-06-30 |
Planned |
County |
Vihiga County new waste sites |
To improve on waste management. |
Ksh. 9,000,000.00 |
2018-01-03 |
2020-01-31 |
Planned |
Ward |
Orthodox-Emwatsi |
improve rural accessibility |
Ksh. 1,000,000.00 |
2018-11-03 |
2019-11-07 |
Planned |
County |
Malaria Prevention and Treatment |
To reduce malaria Morbidity and mortality |
Ksh. 5,000,000.00 |
2015-01-01 |
2022-12-31 |
Ongoing |